Loading...
HomeMy WebLinkAboutFaria PZ Staff Report 3-25-14 Thomas G. Faria Corp 42 Pink Row 214SITE2 Meeting Date: March 25, 2014 Date Received by Commission: February 25, 2014 Staff Report Page 2 Project: Faria Expansion General Information Applicant: Thomas G. Faria Corp Representatives: Legal: None Engineer: Alfred Kovalik –Advanced Environmental Interface Surveyor: Aeschliman Land Surveyors Requested Action: Site Plan Review Purpose: Construction of a “Pad Ready” site for the expansion and redevelopment of Thomas G. Faria Corp. Location: 42 Pink Row Existing Land Use, Acreage, Zoning and Applicable Zoning Sections: Industrial 10.6 acres Section 14 (I) Section 18 (Site Plans) Staff Report Page 3 Project: Faria Expansion Background Information Analysis Inland Wetlands Commission: Approved on February 20, 2014 WPCA: No Comments Building Department: No Comments Fire Marshal: No Comments Planning Review: Stormwater Management Applicant has not satisfied all comments of the Town Engineer letter dated 2/19/14 Staff Report Page 4 Project: Faria Expansion Staff Recommendations Staff recommends approval. The application has not satisfied the Requirements of Section 14 (I Zone) and Section 18 (Site Plans) of the Regulations Draft Motion Motion to approve the site plan application of Thomas G. Faria Corp for the construction of a “Pad Ready” site to be used for a future expansion of the Thomas G. Faria operations and facility located at 42 Pink Row, Montville CT. As shown on Assessor’s Map 74 Lot 38 as shown on the plans titled “Thomas G Faria Corporation Redevelopment & Expansion Site Preparation Phase Drawings #42 Pink Row Montville , Ct. Prepared by Advanced Environmental Interface, Inc revised to 2-11-14 and the application package dated 2/11/14 A $2,000 erosion and sediment control bond shall be posted prior to the start of construction. The Zoning Enforcement Officer shall be notified 48 hours in advance of the start of construction.