HomeMy WebLinkAboutFaria PZ Staff Report 3-25-14
Thomas G. Faria Corp
42 Pink Row
214SITE2
Meeting Date: March 25, 2014
Date Received by Commission: February 25, 2014
Staff Report Page 2
Project: Faria Expansion
General Information
Applicant: Thomas G. Faria Corp
Representatives:
Legal: None
Engineer: Alfred Kovalik –Advanced Environmental Interface
Surveyor: Aeschliman Land Surveyors
Requested Action: Site Plan Review
Purpose: Construction of a “Pad Ready” site for the expansion and redevelopment of Thomas G. Faria Corp.
Location: 42 Pink Row
Existing Land Use, Acreage, Zoning and Applicable Zoning Sections:
Industrial
10.6 acres
Section 14 (I)
Section 18 (Site Plans)
Staff Report Page 3
Project: Faria Expansion
Background Information
Analysis
Inland Wetlands Commission: Approved on February 20, 2014
WPCA: No Comments
Building Department: No Comments
Fire Marshal: No Comments
Planning Review:
Stormwater Management
Applicant has not satisfied all comments of the Town Engineer letter dated 2/19/14
Staff Report Page 4
Project: Faria Expansion
Staff Recommendations
Staff recommends approval. The application has not satisfied the Requirements of Section 14 (I Zone) and Section 18 (Site Plans) of the Regulations
Draft Motion
Motion to approve the site plan application of Thomas G. Faria Corp for the construction of a “Pad Ready” site to be used for a future expansion of the Thomas G. Faria operations and
facility located at 42 Pink Row, Montville CT. As shown on Assessor’s Map 74 Lot 38 as shown on the plans titled “Thomas G Faria Corporation Redevelopment & Expansion Site Preparation
Phase Drawings #42 Pink Row Montville , Ct. Prepared by Advanced Environmental Interface, Inc revised to 2-11-14 and the application package dated 2/11/14
A $2,000 erosion and sediment control bond shall be posted prior to the start of construction.
The Zoning Enforcement Officer shall be notified 48 hours in advance of the start of construction.