HomeMy WebLinkAboutPink Row 42-Faria NOD 2-24-14TOWN OF MONTVILLE
INLAND WETLANDS COMMISSION
310 NORWICH NEW LONDON TURNPIKE
UNCASVILLE, CONNECTICUT 06382
PHONE (860) 848-8549 ext 379 - FAX (860) 848-2354
February 24, 2014
Thomas G. Faria Corp
c/o David Hickey
42 Pink Row
Uncasville, Ct. 06382
Dear Mr. Hickey:
During the February 20, 2014 meeting of the Inland Wetlands Commission your application for the remediation, redevelopment and expansion of the Thomas G. Faria operations and facilities
on the property located at 42 Pink Row, Montville CT. As shown on Assessor’s Map 74 Lot 38 as depicted on the plan titled “Thomas G. Faria Corporation Redevelopment & Expansion Site
Preparation Phase Drawings #42 Pink Row Montville CT, Prepared by Advanced Environmental Interface, Inc. 8 Old Indian Trail Middlefield CT” and the application and narrative revised
to 2/10/14 was approved by the Commission with Conditions
Conditions of Approval Are:
A Pre-Construction meeting will be scheduled with the Inland Wetlands Officer prior to the start of the project
At the Pre-Construction meeting the name of the third party inspector will be provided as indicated in the Erosion and Sediment Control Narrative
If the location of the retaining wall changes or additional regulated activities are required the applicant will submit modified drawings to the Commission for review
Orange construction fence is to be placed behind the storm woodchip berm
Whenever earthwork is parallel to Oxoboxo brook and within 50 ft. of the delineated area the inspector or owner’s designated engineer is required to be on site. The Inspector will provide
a weekly progress report to the Commission.
Retaining wall lift stabilization plan is to be provided and approved by the Town Engineer
All six conditions will be printed on the drawing sheet 8 of 12 under General Notes.
Before the permit is issued, the following fee must be paid to the Town of Montville:
Basic Fee - $50.00
State Fee - $60.00
Significant Activity - $100
Wetlands Fee – $496.00
Total Fee - $706.00
If the fee is not paid within 90 days then this permit will be revoked. Your permit will be ready for you to pick up by March 11th if no petitions against the application are filed.
If you have any further questions please feel free to contact the office.
Sincerely,
Colleen Bezanson
Planner II/ Wetland Agent
Certified: 7007 0220 0004 4278 3602