Andrew Petrowski
37 Cove Road
Cease and Desist Order
Meeting Date: April 16, 2009
Date received by Commission 3-19-09
Terminal Date:
H:\APPLICATIONS\IN PROCESS\WETLANDS ONLY\Other business\37 Cove Road\37 cove road staff report 4-16-09 .docx
Assessor’s Map
Wetlands
Map
H:\APPLICATIONS\IN PROCESS\WETLANDS ONLY\Other business\37 Cove Road\37 cove road staff report 4-16-09 .docx
H:\APPLICATIONS\IN PROCESS\WETLANDS ONLY\Other business\37 Cove Road\37 cove road staff report 4-16-09 .docx
Cease and Desist Order
- Construction of a residence within the upland review area
Background Information
- Applicant was instructed by the DEP to perform a soils test in the area
o Soils test has been completed
o Staff has not had a response from DEP regarding the soil test
- Staff has been corresponding with both the applicant and the DEP regarding this
matter.
- An email from Jim Bernardo, applicant’s engineer has been provided indicating
that the soil study has been completed and it is tidal wetlands in Richard Snarski’s
opinion, therefore not under local jurisdiction.
March
- Site plan was submitted to the office – no activities proposed within 80 feet of the
high tide line and outside of the flood zone area
- Building Department made inspection of foundation and it appeared to them that
it was too close to the water
- Staff went out and inspected the property and found that the foundation was
within the review area
o Applicant explained that the engineer had set the markers for the location
of the foundation per the plan
o Engineer was sent out to the property to access the situation and it was
determined that the site plan was wrong- the house would have to be
within the flood zone and would require a wetlands permit
- In addition because the property is located next to a tidal wetland the DEP is also
involved. Depending on the outcome of their review, the Inland Wetlands
Commission will be able to make a determination as to what falls under our
review and what will be handled by the state
- At this time erosion and sediment control measures are in place and no further
activity has taken place on the property.
- The applicant’s engineer is working on new plans to be submitted to both the DEP
and the Wetlands Commission for review
-
file:///H|/APPLICATIONS/IN%20PROCESS/WETLANDS%20ONLY/Other%20business/37%20Cove%20Road/staff%20to%20dep%203-31-09.txt
From: Colleen Bezanson
Sent: Tuesday, March 31, 2009 9:40 AM
To: 'deava.lambert@ct.gov'
Subject: 37 Cove Road
Miss Lambert:
I am writing in regards to 37 Cove Road. I last received a fax from you on 3/18/09
indicating that you had received the site plan for 37 Cove Road and were in the process
of reviewing it. The letter indicated that you were awaiting a soil study to determine
jurisdiction. Have you received any new information that you requested. The item is on
the 4/16/09 Agenda of the Inland Wetlands Commission and I was hoping to have a
report from you to provide to the Commission. Thanks for your assistance in this matter.
Colleen Bezanson
Planner II
Town of Montville Planning Department
310 Norwich New London Tpke
Uncasville, CT. 06382
(860) 848-8549 Ext 379 Fax (860) 848-2354
file:///H|/APPLICATIONS/IN%20PROCESS/WETLANDS%20ON...ss/37%20Cove%20Road/staff%20to%20dep%203-31-09.txt [4/14/2009 4:00:29 PM]
file:///H|/APPLICATIONS/IN%20PROCESS/WETLANDS%20ONLY/Other%2...ss/37%20Cove%20Road/dep%20response%20to%20staff%204-1-09.txt
From: Lambert, DeAva [DeAva.Lambert@ct.gov]
Sent: Wednesday, April 01, 2009 9:18 AM
To: Colleen Bezanson
Subject: RE: 37 Cove Road
Importance: Low
Dear Ms. Bezanson:
Thank you for contacting me. No, I have not received anything, but Mr. Petrowski’s engineer
indicated he would be arranging to have the soil survey completed. Here is the contact info I
have for him: james.bernardo@sbcglobal.net 860-447-02366 (w), 860-460-5871 (cell).
Until I receive the survey, I am in “wait mode.” I do know that soil surveys typically take several
weeks to months to complete and report.
I would appreciate hearing the conclusions of the IWC discussion(s), if you would not mind keeping
me apprised. If I can be of any further assistance, please let me know.
Sincerely,
DeAva Lambert, Environmental Analyst
Office of Long Island Sound Programs
Bureau of Water Protection & Land Reuse
CT Dept. of Environmental Protection
From: Colleen Bezanson [mailto:CBezanson@montville-ct.org]
Sent: Tuesday, March 31, 2009 9:40 AM
To: Lambert, DeAva
Subject: 37 Cove Road
Miss Lambert:
I am writing in regards to 37 Cove Road. I last received a fax from you on 3/18/09
indicating that you had received the site plan for 37 Cove Road and were in the process
of reviewing it. The letter indicated that you were awaiting a soil study to determine
jurisdiction. Have you received any new information that you requested. The item is on
the 4/16/09 Agenda of the Inland Wetlands Commission and I was hoping to have a
report from you to provide to the Commission. Thanks for your assistance in this matter.
Colleen Bezanson
Planner II
file:///H|/APPLICATIONS/IN%20PROCESS/WETLANDS%2...20Road/dep%20response%20to%20staff%204-1-09.txt (1 of 2) [4/14/2009 4:00:29 PM]
file:///H|/APPLICATIONS/IN%20PROCESS/WETLANDS%20ONLY/Other%2...%20Cove%20Road/jim%20bernardo%20status%20report%204-2-09.txt
From: James Bernardo [james.bernardo@sbcglobal.net]
Sent: Thursday, April 02, 2009 11:07 AM
To: 'Colleen Bezanson'
Cc: 'Lambert, DeAva'
Subject: 33 & 37 Cove Road
I just wanted to provide you with a status update for the properties at 33 & 37 Cove Road. Andy
has hired Rich Snarski to perform a tidal/inland wetlands evaluation on the site. Rich said that he
should get to that next week. Once the delineation is complete I will field locate the flags and
provide an updated survey to both the town and DEP.
Also, we had a meeting last with Keith Neilson, PE at Docko, Inc. Andy has expressed an
interest in retaining them to address the outstanding 2006 N.O.V.
James Bernardo, PLS
James Bernardo Land Surveying, LLC
www.jbsurvey.com
102A Spithead Road
Waterford, CT 06385
Phone 860-447-0236
Fax 860-447-2092
file:///H|/APPLICATIONS/IN%20PROCESS/WETLANDS%20ONL...0Road/jim%20bernardo%20status%20report%204-2-09.txt [4/14/2009 4:00:28 PM]
file:///H|/APPLICATIONS/IN%20PROCESS/WETLANDS%20ONLY/Other%2...om%20bernardo%20to%20staff%20re%20soil%20study%204-15-09.txt
From: James Bernardo [james.bernardo@sbcglobal.net]
Sent: Wednesday, April 15, 2009 7:41 AM
To: 'Colleen Bezanson'
Subject: RE: IWC 4-16-09 agenda
Rich Snarski has completed his delineation of the wetlands on the site. The only wetlands on the
site are tidal wetlands. No inland wetlands were present. Although portions of the property are
within the 100-year flood plain there is no flood plain soils present on the site. It is Rich’s opinion
that this site is NOT within the IWC jurisdiction.
From: Colleen Bezanson [mailto:CBezanson@montville-ct.org]
Sent: Tuesday, April 14, 2009 2:15 PM
To: jkdiamantini@sbcglobal.net; james.bernardo@sbcglobal.net; hellermccoy@sbcglobal.net;
lenj48@sbcglobal.net; Len Johnson; Thomas Fenton, P.E.
Subject: IWC 4-16-09 agenda
Please find attached the agenda for the 4-16-09 meeting of the Inland Wetlands
Commisison.
Colleen Bezanson
Planner II
Town of Montville Planning Department
310 Norwich New London Tpke
Uncasville, CT. 06382
(860) 848-8549 Ext 379 Fax (860) 848-2354
file:///H|/APPLICATIONS/IN%20PROCESS/WETLANDS%20ON...rdo%20to%20staff%20re%20soil%20study%204-15-09.txt [4/15/2009 8:47:46 AM]