Loading...
HomeMy WebLinkAboutCopy of Tilcon2007Page4 4C:\Users\twilliams\AppData\Local\Temp\Copy of Tilcon2007Page4 4_45429\Copy of Tilcon2007Page4 4.doc Staff Repot Page 4 Project: Tilcon Connecticut Stormwater Management Stormwater management structures have been installed in accordance with the approved plan. The Narrative description of construction sequencing and erosion and sedimentation control plan relative to an excavation and earth product processing operation on property located at 53 Coaroline Road, Montville, Connecticut is part of the application. Staff Recommendations I recommend approval of the application with the following conditions: 1. Continuation of the existing Erosion & Sediment Control Bond in the amount of $42,150. 2. The permit is valid for a period of 5 years. 3. The applicant is responsible for obtaining a State General Stormwater Quality Permit if required DRAFT MOTION Motion to approve, with conditions, an application for Tilcon Connecticut Inc. for special permit for earth products excavation and processing on property located at 53 Caroline Road, Montville, Ct., as shown on Assessors Map 59 Lot 7; and as shown on Site Development Plan Proposed Excavation Prepared For Tilcon Connecticut, Inc. Caroline Road Montville, Connecticut, Revised 4/6/2007; CME Associates, Inc. The Commission approves this special permit and finds that: The proposed use is in harmony with the appropriate and orderly development of the neighborhood and will not hinder or discourage the development of adjacent properties nor impair property values. The location and size of the proposed use, the nature and intensity of operations involved in connection therewith, its site layout and its relation to access streets will not be such that both pedestrian and vehicular traffic to and from the use and the assembly of persons C:\Users\twilliams\AppData\Local\Temp\Copy of Tilcon2007Page4 4_45429\Copy of Tilcon2007Page4 4.doc in connection therewith will not be hazardous or inconvenient, no incongruous with any residential district or conflict with the normal traffic of the neighborhood. The nature and intensity of the operations involved in connection with the proposed use and the site layout and development will not have a negative impact on the environment. The Commission finds that this application complies with the Town of Montville Zoning Regulations. This is a conditional approval. Each and every condition is an integral part of the Commissions decision. Should any of the conditions, on appeal from this decision, be found to be void or of no legal effect then this conditional approval is likewise void. Should any of the conditions not be implemented by the applicant or his successors within the specified permit time period, then this conditional approval is void. The applicant may re-file another application for review. This application is approved with the following conditions: 1. The Erosion and Sediment control bond (bond #14-014-547 Liberty Bond Services) in the amount of $42,150 remain in place. 2. This permit is valid for 5 years 3. The applicant is responsible for obtaining a State General Stormwater Quality Permit if required