Loading...
HomeMy WebLinkAboutNarrDeck Build – July 8, 2008 Revised – August 16, 2008 Leah and Russell Sheikowitz 291 Black Ash Road Oakdale, CT 06370 We will be building a deck on the back of our house. The deck will be constructed of a pressure treated foundation with a Trexx floor and railings. The railings will be 42” high with a maximum banister spacing of 4”. The stairs will be put in once the deck platform is finished. The material framing for the stairs will be 2x12 pt to concrete landing. The concrete landing will be 6’ x 8’. The machinery that we will use will be a post-hole digger to dig the 42” holes for the concrete. The deck will be 12’ x 24’. No material will be brought in. The material that is removed for the post-holes will be used to fill in the holes of the existing deck that we are removing. We are asking to build this deck because the deck that is there now is not big enough for our family to enjoy. We would like a bigger deck for our personal use. The deck build will take approximately 2 weeks.