HomeMy WebLinkAboutDraft motionAfter giving due consideration to all relevant factors including those in Section 10 and or Section 4 of the Montville Inland Wetland Regulation and Section 22a-41 of the Connecticut
General Statutes, I move to approve application
206 IWC 31 Fred & Therese Barning: An application for the construction of a deck in a regulated area on the property located at 44 Birch Terrace, Oakdale, Ct. As shown on Assessor’s
Map 16 Lot 11. as depicted on the map titled “Detailed Plan of Property at 44 Birch Terrace, Surrounding Property Owners, Proposed Replacement Deck and Proximity to a Watercourse Dated
10/30/06” and the application and narrative dated 10/31/06
Reasons for approval are
1. The environmental impact of the proposed project does not have a significant effect on the inland wetland's and watercourse's capacity to support fish and wildlife, to prevent flooding,
to supply and protect surface and groundwater, to control sediment, to facilitate drainage, to control pollution, to support recreational activities, and to promote public health and
safety
2. The applicant has presented alternatives to the proposed action
c. The Commission has determined that the relationship between the short-term uses of the environment and the maintenance and enhancement of long-term productivity will have no impact
on the surrounding wetland system
d. The proposed activity will not have irreversible and irretrievable commitments of resources.
e. The proposed project will not change the character and or add degree of injury to, or interference with, safety, health, or the reasonable use of property, including abutting or downstream
property.
f. The proposed activity use is suitable to the area.
g. The applicant has taken all feasible measures to mitigate the impact of any aspect of the proposed regulated activity.
This is a conditional approval. Each and every condition is an integral part of the Commission decision. Should any of the conditions, on appeal from this decision, be found to be void
or of no legal effect then this conditional approval is likewise void. Should any of the conditions not be implemented by the applicant or his successors within the specified permit
time period, then this conditional approval is void.
Conditions of Approval are: