---------- Forwarded message ---------From: JOHN MARTUCCI, PE <john@lbmengineering.com>
Date: Tue, Jan 13, 2026 at 3:49 PMSubject: 428 Fire St - Trench detail
To: Mark Desrosier <mark@allfloorsdeco.com>
Good after noon, Mark,
Attached is a preliminary detail of the trench. I am showing a 36" wide x 12" deep
concrete
trench filled with 5" to 6" riprap. A layer of filter fabric will separate the riprap from
the
processed travel course (2"-minus). The riprap should have enough open space to
lower the water surface elevation soon after a large storm. Big storms will always over top the road.
I think 3 - 6" PVC pipes would do a better job. We can use the pipes as a feasible and
prudent alternative.
I think the wetlands meeting is this Thursday night.
Please call me when you have a chance
John R. Martucci, P.E.
LBM Engineering, LLC
11 Hally LaneColchester, CT 06415-2133
860-416-9809