Loading...
HomeMy WebLinkAbout23SITE5 - 2040 Rte 32 Revised Site Plan dated 2-7-23 and rec'd 5-21-2650 50 50 50 50 50 50 50 50 50 34.0' 80 . 0 ' 4.0' 9.3'18.7' p p p p p pp p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p pppp p p p p p p p p p p p p p p p p p p p p p p p p p p pp p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p ppp NORWICH - NE W L O N D O N T U R N P I K E ( C O N N . R O U T E # 3 2 ) OC C U M L A N E PO D U R G I E L L A N E 76 . 0 ' 36.0' p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p 50 50 50 50 50 50 50 50 50 50 50 pppp p p p p p p p p 5 0 50 HY A T T P L A C E D R I V E AC C E S S D R I V E W A Y (M O N T V I L L E C O M M O N S / H O M E D E P O T ) D R I V E T H R U Scale: 1"=1000' Location Map 21-001048 NCFJOB NO.DRAWN BY:OFSHEET NO. 0DRAWING SCALE: 1"=30'15 30 60 Prepared For: Uncasville, Connecticut 2040 New London Turnpike of Cover Sheet AMER CHOUDREY DATE REVISIONSNO. 2040 Route 32 Montville, Connecticut Office: (860) 536-7390 Fax: (860) 536-1644 Mailing Address: 70 Essex Street Mystic, Connecticut 06355 FEDUS ENGINEERINGCIVIL ENGINEERS LLC P: \ 2 0 2 1 \ 2 1 - 0 0 1 0 4 8 - U N C A S V I L L E - 2 0 4 0 R O U T E 3 2 - A M E R C H O U D R E Y - G A S S T A T I O N - S I T E P L A N A P P R O V A L \ A C A D \ 2 1 - 0 0 1 0 4 8 - U N C A S V I L L E - 2 0 4 0 R O U T E 3 2 - A M E R C H O U D R E Y - G A S S T A T I O N - P L A N N I N G A N D Z O N I N G - R E V . 1 5 . D W G Subject Parcel Information OWNER: HASSAN HUSSAIN, LLC PARCEL ADDRESS: 2040 NEW ROUTE 32, UNCASVILLE, CT MAILING ADDRESS: 4 BOSTON POST RD, WATERFORD, CT 06385 MBL 103/1/1A DEED: VOLUME 663 PAGE 612 AREA: 116,639 SF = 2.68 ACRES FLOOD ZONE: ZONE X PER FIRM MAP # 09011C0351G EFFECTIVE DATE: JULY 18, 2011 Note: 1.ALL WORK WITHIN THE STATE HIGHWAY SHALL CONFORM TO THE CTDOT SPECIFICATIONS FOR ROADS, BRIDGES, FACILITIES AND INCIDENTAL CONSTRUCTION; FORM 818. UTILITY POLE W/ LIGHT OVERHEAD WIRES PROPERTY LINE INDEX CONTOUR STONEWALL NOW OR FORMERLY CONTOUR FENCE LINE WATER VALVE TYPICAL DRILL HOLE POINT OF BEGINNING Legend PROPOSED TEST PIT SYMBOL EXISTING DESCRIPTION p p ADJACENT PROPERTY LINE CATCH BASIN SPOT ELEVATION MEAN HIGH WATER LINE HIGH TIDE LINE COASTAL JURISDICTIONAL LINE WETLANDS BOUNDARY/FLAG MEAN LOW WATER LINE UTILITY POLE DRAINAGE MANHOLE EASEMENT LINE ZONE LINE EXISTING WATER LINE EXISTING SEWER LINE BUILDING SETBACK LINE SEWER MANHOLE PERCOLATION TEST HYDRANT WATER SHUTOFF DRILL HOLE EX. IP / REBAR MONUMENT IRON PIN TO BE SET 91 (AKA CT RT 32) 16 PODURGIEL LN UNCASVILLE, CT 06382 N/F V571/495 MAILING ADDRESS 16 PODURGIEL LN BETH SCIARRONI PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS HOME DEPOT USA INC M/B/L: 099/049/000 PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS HOME DEPOT USA INC M/B/L: 099/049/000 Gregg T. Fedus P.E. PLANNING AND ZONING SUBMISSION 2040 ROUTE 32 2040 ROUTE 32, UNCASVILLE, CONNECTICUT APPLICANT: AMER CHOUDREY PROPOSED CONVENIENCE STORE/GAS STATION SHEET LIST TABLE 1 OF 9 COVER SHEET 2 OF 9 EXISTING CONDITIONS 3 OF 9 SITE PLAN 4 OF 9 SIGNING & PAVEMENT PLAN 5 OF 9 GRADING PLAN 6 OF 9 SOIL & EROSION CONTROL PLAN 7 OF 9 LANDSCAPING & LIGHTING PLAN 8 OF 9 DETAILS I 9 OF 9 DETAILS II CT. License No. 21231 Gregg T. Fedus P.E. UPLANDSUPLANDS UPLANDS February 7, 2023 05/19/202615 REVISION CLOUDS 07/03/20233 WATER & SEWER CONNECTION 07/12/20234 TOWN PLANNER COMMENTS 07/20/20235 STAFF COMMENTS 11/21/20236 DOT COMMENTS 04/29/20247 DOT COMMENTS 06/05/20248 DOT COMMENTS 09/05/20249 DOT COMMENTS 11/04/202410 DOT COMMENTS 11/08/202411 DOT COMMENTS 12/09/202412 WATER/SEWER - DOT 03/07/202613 ADDED GREASE INTERCEPTOR 05/10/202614 COURT YARD MODIFICATION 15.1 2030 ROUTE 32 2030 ROUTE 32 M/B/L: 103/001/00B 50 50 50 50 50 50 50 50 50 50 p p p p p pp p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p pppp p p p p p p p p p p p p p p p p p p p p p p p p p p pp p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p ppp NORWICH - NE W L O N D O N T U R N P I K E ( C O N N . R O U T E # 3 2 ) OC C U M L A N E PO D U R G I E L L A N E p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p 50 50 50 50 50 50 50 50 50 50 50 pppp p p p p p p X X X p p 5 0 50 HY A T T P L A C E D R I V E 30' REAR YARD SETBACK 50' FRONT YARD SETB A C K 50 ' R E A R Y A R D S E T B A C K 30' S I D E Y A R D S E T B A C K 30 ' S I D E Y A R D S E T B A C K 4' WIDE CHANNEL AC C E S S D R I V E W A Y (M O N T V I L L E C O M M O N S / H O M E D E P O T ) Scale: 1"=1000' Location Map 21-001048 NCFJOB NO.DRAWN BY:OFSHEET NO. 0DRAWING SCALE: 1"=30'15 30 60 Prepared For: Uncasville, Connecticut 2040 New London Turnpike of AMER CHOUDREY DATE REVISIONSNO. 2040 Route 32 Montville, Connecticut Office: (860) 536-7390 Fax: (860) 536-1644 Mailing Address: 70 Essex Street Mystic, Connecticut 06355 FEDUS ENGINEERINGCIVIL ENGINEERS LLC P: \ 2 0 2 1 \ 2 1 - 0 0 1 0 4 8 - U N C A S V I L L E - 2 0 4 0 R O U T E 3 2 - A M E R C H O U D R E Y - G A S S T A T I O N - S I T E P L A N A P P R O V A L \ A C A D \ 2 1 - 0 0 1 0 4 8 - U N C A S V I L L E - 2 0 4 0 R O U T E 3 2 - A M E R C H O U D R E Y - G A S S T A T I O N - P L A N N I N G A N D Z O N I N G - R E V . 1 5 . D W G UTILITY POLE W/ LIGHT OVERHEAD WIRES PROPERTY LINE INDEX CONTOUR STONEWALL NOW OR FORMERLY CONTOUR FENCE LINE WATER VALVE TYPICAL DRILL HOLE POINT OF BEGINNING Legend TEST PIT SYMBOL EXISTING DESCRIPTION p p ADJACENT PROPERTY LINE CATCH BASIN SPOT ELEVATION MEAN HIGH WATER LINE HIGH TIDE LINE COASTAL JURISDICTIONAL LINE WETLANDS BOUNDARY/FLAG MEAN LOW WATER LINE UTILITY POLE DRAINAGE MANHOLE EASEMENT LINE ZONE LINE EXISTING WATER LINE EXISTING SEWER LINE BUILDING SETBACK LINE SEWER MANHOLE PERCOLATION TEST HYDRANT WATER SHUTOFF DRILL HOLE EX. IP / REBAR MONUMENT 92 Reference Maps: 1."BOUNDARY SURVEY PROPERTY OF NDKLP MONTVILLE ASSOCIATES, LLC 2040 ROUTE 32, UNCASVILLE, CONNECTICUT " DATED: SEPTEMBER 28, 2011, BY: JAMES BERNARDO LAND SURVEYING. LLC, LS #70121. 2."PROPERTY SURVEY MAP DEPICTING EXISTING CONDITIONS OF 2040 NEW LONDON TURNPIKE (AKA CT 32) UNCASVILLE, CONNECTICUT PREPARED FOR: AMER CHOUDREY" DATED: APRIL 18, 2023, REVISED TO 7/6/202, BY: ANTHONY HENDRIKS, LS #10834, FEDUS ENGINEERING,LLC. (AKA CT RT 32) 16 PODURGIEL LN UNCASVILLE, CT 06382 N/F V571/495 MAILING ADDRESS 16 PODURGIEL LN BETH SCIARRONI M/B/L: 103/001/00B PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 Gregg T. Fedus P.E. CT. License No. 21231 Gregg T. Fedus P.E. UPLANDSUPLANDS UPLANDS WETLAND AREA DELINEATED BY FUSS & O'NEILL AND CONFIRMED BY DAVID LORD, SOIL SCIENTIST Existing Conditions UPLANDS UPLANDS UPLANDS UPLANDS February 7, 2023 PROPOSED IRON PIN TO BE SET EXISTING EASEMNT 7.1 05/19/202615 REVISION CLOUDS 07/03/20233 WATER & SEWER CONNECTION 07/12/20234 TOWN PLANNER COMMENTS 07/20/20235 STAFF COMMENTS 11/21/20236 DOT COMMENTS 04/29/20247 DOT COMMENTS 06/05/20248 DOT COMMENTS 09/05/20249 DOT COMMENTS 11/04/202410 DOT COMMENTS 11/08/202411 DOT COMMENTS 12/09/202412 WATER/SEWER - DOT 03/07/202613 ADDED GREASE INTERCEPTOR 05/10/202614 COURT YARD MODIFICATION 50 50 50 50 50 50 50 50 50 50 34.0' 80 . 0 ' 4.0' 9.3'18.7' p p p p p pp p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p pppp p p p p p p p p p p p p p p p p p p p p p p p p p p pp p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p ppp NORWICH - NE W L O N D O N T U R N P I K E ( C O N N . R O U T E # 3 2 ) OC C U M L A N E PO D U R G I E L L A N E PROPOSED GAS PUMP CANOPY (36x76) (SEE NOTE #6) PROPOSED GAS PUMP (6 TYP.) 8 PROPOSED CONCRETE WALKWAYPROPOSED TRASH ENCLOSURE 8'X20' 76 . 0 ' 36.0' 8 PROPOSED DIESEL PUMP p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p 50 50 50 50 50 50 50 50 50 50 50 pppp p p p p p p X X X p p 24 . 0 ' PROPOSED PLUNGE POOL PROPOSED RETAINING WALL PROPOSED DRIVE-THRU WINDOW PROPOSED RIP RAP5 0 50 WETLAND FLAGS 1 - 46 DELINEATED BY DAVID LORD (MARCH,2022) 50' WETLAND REVIEW LINE PROPOSED LOADING AREA PROPOSED SITE MONUMENT SIGN (100 SF) PROPOSED F.E.U. (TYP.)PROPOSED OUTLET STRUCTURE PROPOSED AC CONDENSER (3 TYP.) PROPOSED CATCH BASIN TYPE-C (TYP.) HY A T T P L A C E D R I V E 30.0' 30' REAR YARD SETBACK 50' FRONT YARD SETB A C K 50 ' R E A R Y A R D S E T B A C K 30' S I D E Y A R D S E T B A C K 30 ' S I D E Y A R D S E T B A C K 61 . 5 ' 66 . 8 ' 48.5' 10 3 . 4 ' 11 6 . 3 ' PROPOSED DETENTION BASIN TO BE REMOVED /RELOCATED PROPOSED BITUMINOUS CONCRETE CURB (TYP.) PROPOSED 8" RETAINING WALL PROPOSED 80'x62' BUILDING 4,960 SF FF = 176.5' PROPOSED PARKING STRIPING (TYP.) 20.0' PROPOSED GRASS SWALE 4' WIDE CHANNEL 31.6' PROPOSED LIMITS OF DISTURBANCE PROPOSED HANDICAP SIGN PROPOSED FRONT DOORS PROPOSED WHEEL STOP (TYP. 8) PROPOSED 42" HIGH WOOD RAILING -PLACED IN FRONT OF RETAINING WALL PROPOSED SIDEWALK RAMP TYPE 4e -(SEE SHEET NO. 8) (TYP.) 30.0' AC C E S S D R I V E W A Y (M O N T V I L L E C O M M O N S / H O M E D E P O T ) 74 . 3 ' PROPOSED DRIVE-THRU MENU BOARD D R I V E T H R U PROPOSED AIR & VACUUM STATION PROPOSED 42" HIGH WOOD RAILING -PLACED ON RETAINING WALLPROPOSED 42" HIGH WOOD RAILING -PLACED ON RETAINING WALL PROPOSED DRAINAGE MANHOLE 18 . 0 ' PROPOSED GUY POLE FOR UTILITY POLE ON PODURGIEL - APPROVAL BY UTILITY COMPANY PROPOSED GUY WIRE AS REQUIRED BY UTILITY COMPANY PROPOSED FUTURE PROPANE/STORAGE AREA R15.0' R18.0' R 5 . 0 ' PROPOSED UNDERGROUND FUEL STORAGE TANKS (TWO 15,000 GAL.) WITH CONCRETE PAD (28' X 46') PROPOSED CONCRETE LANDING FLUSH WITH ASPHALT PROPOSED CONCRETE STAIRS & LANDING 6 RISERS @ 7" 5 TREADS @ 12" PROPOSED AC CONDENSER (2 TYP.) PROPOSED CRUSHED STONE PROPOSED CRUSHED STONE PROPOSED REAR DOOR (3 TYP.) 46" CLEAR CONCRETE TO CONCRETE Scale: 1"=1000' Location Map 21-001048JOB NO.DRAWN BY:OFSHEET NO. 0DRAWING SCALE: 1"=30'15 30 60 Prepared For: Uncasville, Connecticut 2040 New London Turnpike of Site Plan AMER CHOUDREY DATE REVISIONSNO. 2040 Route 32 Montville, Connecticut Office: (860) 536-7390 Fax: (860) 536-1644 Mailing Address: 70 Essex Street Mystic, Connecticut 06355 FEDUS ENGINEERINGCIVIL ENGINEERS LLC P: \ 2 0 2 1 \ 2 1 - 0 0 1 0 4 8 - U N C A S V I L L E - 2 0 4 0 R O U T E 3 2 - A M E R C H O U D R E Y - G A S S T A T I O N - S I T E P L A N A P P R O V A L \ A C A D \ 2 1 - 0 0 1 0 4 8 - U N C A S V I L L E - 2 0 4 0 R O U T E 3 2 - A M E R C H O U D R E Y - G A S S T A T I O N - P L A N N I N G A N D Z O N I N G - R E V . 1 5 . D W G NOTES: 1.AREA OF WETLAND ON SITE IS 21,832 SF/0.50 ACRES. 2.PROPOSED AREA DISTURBED IN THE 50' REVIEW ZONE IS 21,484 SF/0.49 ACRES. 3.ALL SIGNAGE SHALL COMPLY WITH SECTION 19 OF THE MONTVILLE ZONING REGULATIONS. 4.ALL SITE SIGNAGE SHALL REQUIRE AN APPROVED ZONING PERMIT PRIOR TO INSTALLATION. SIGNAGE LOCATIONS SHALL BE IDENTIFIED IN THE FIELD BY A LICENSED LAND SURVEYOR PRIOR TO INSTALLATION. 5.FUEL ISLAND CANOPY FOUNDATION DESIGN TO BE PROFESSIONALLY ENGINEERED TO APPLICABLE WIND AND SNOW LOADS, CANOPY LIGHTING MUST ALSO BE FULL CUT OFF AND SUBJECT THE LUMENS RESTRICTIONS IN THE ENERGY CONSERVATION CODE. UTILITY POLE W/ LIGHT OVERHEAD WIRES PROPERTY LINE INDEX CONTOUR STONEWALL NOW OR FORMERLY CONTOUR FENCE LINE WATER VALVE TYPICAL DRILL HOLE POINT OF BEGINNING Legend PROPOSED TEST PIT SYMBOL EXISTING DESCRIPTION p p ADJACENT PROPERTY LINE CATCH BASIN SPOT ELEVATION MEAN HIGH WATER LINE HIGH TIDE LINE COASTAL JURISDICTIONAL LINE WETLANDS BOUNDARY/FLAG MEAN LOW WATER LINE UTILITY POLE DRAINAGE MANHOLE EASEMENT LINE ZONE LINE EXISTING WATER LINE EXISTING SEWER LINE BUILDING SETBACK LINE SEWER MANHOLE PERCOLATION TEST HYDRANT WATER SHUTOFF DRILL HOLE EX. IP / REBAR MONUMENT IRON PIN TO BE SET 93 (AKA CT RT 32) 16 PODURGIEL LN UNCASVILLE, CT 06382 N/F V571/495 MAILING ADDRESS 16 PODURGIEL LN BETH SCIARRONI M/B/L: 103/001/00B PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 Gregg T. Fedus P.E. CT. License No. 21231 Gregg T. Fedus P.E. UPLANDSUPLANDS UPLANDS C-2 ZONING REQUIREMENTS TABLE SECTION REGULATION REQUIREMENTS EXISTING PROPOSED 11.4 MINIMUM LOT SIZE 40,000 SF 116,639 SF 116,639 SF 11.5 MINIMUM LOT FRONTAGE 80'480'480' 11.6.1 MINIMUM FRONT YARD 50'---BUILDING 66.8' CANOPY 61.5' 11.6.2 MINIMUM SIDE YARD 30'---BUILDING 48.5' (S) CANOPY 168.5' (S) 11.6.3 MINIMUM REAR YARD 30'---BUILDING 103.4' CANOPY 116.3' 11.7 MAXIMUM BUILDING HEIGHT NONE ---25.7' 4.11.10.3 MINIMUM FUEL PUMP FROM STREET 25'---74.3' PARKING REQUIREMENTS SECTION REGULATION MINIMUM REQ.PROPOSED 18.3.6 FREE STANDING RETAIL 5 SPACES *(4,960 SF /1000SF) = 24.8 SPACES 24.8 SPACES - 12 SPACES = 12.8 SPACES + 1 SPACE FOR TWO EMPLOYEES + 1 SPACE PER VACUUM FACILITY + 1 SPACE PER AIR FACILITY + 0 SPACE PER 3 INTERIOR TABLES TOTAL: 15.8 ≈16 16 SPACES 18 VAN-ACCESSIBLE PARKING 1 SPACE REQUIRED 168.5' WETLAND AREA DELINEATED BY FUSS & O'NEILL AND CONFIRMED BY DAVID LORD, SOIL SCIENTIST PROPOSED POSITIVE LIMITING BARRIER (TYP.) February 7, 2023 1.ALL PAVEMENT MARKINGS TO BE EPOXY RESIN. 2.ALL PAVEMENT MARKINGS TO BE INSTALLED IN ACCORDANCE WITH STANDARD SHEET TR-1210_04 AND TR-1210_08. 3.ERADICATE EXISTING CONFLICTING PAVEMENT MARKINGS. PAVEMENT MARKING NOTES: EXISTING EASEMNT Reference Maps: 1."BOUNDARY SURVEY PROPERTY OF NDKLP MONTVILLE ASSOCIATES, LLC 2040 ROUTE 32, UNCASVILLE, CONNECTICUT " DATED: SEPTEMBER 28, 2011, BY: JAMES BERNARDO LAND SURVEYING. LLC, LS #70121. 2."PROPERTY SURVEY MAP DEPICTING EXISTING CONDITIONS OF 2040 NEW LONDON TURNPIKE (AKA CT 32) UNCASVILLE, CONNECTICUT PREPARED FOR: AMER CHOUDREY" DATED: APRIL 18, 2023, REVISED TO 7/6/202, BY: ANTHONY HENDRIKS, LS #10834, FEDUS ENGINEERING,LLC. BASE POLE FINIAL POLE: SP4X12 - 4" x 12' FLUTED POLEEXTRUDED ALUMINUM ALLOY 6005-T5 WALL THICKNESS - .125" FINIAL:FIN-A4 - ACORN FINIAL FOR 4" ROUND POLE. CAST ALUMINUM ALLOY #356 TRIM: TS2424N - TRIM FOR 24" X 24" SIGN CAST ALUMINUM ALLOY #356 SIGN: R5 -1/24 REFLECTIVE 30X3O DO NOT ENTER SIGN CT DOT CATALOG 31-1119 BASE: SB-94 - SLIP-OVER BASE FOR 4" OD POLECAST ALUMINUM ALLOY #356 (ALSO AVAILABLE IN TWO-PIECE OPTION 2PC8) SIDE A TRIM SIGN BASE POLE FINIAL POLE: SP4X12 - 4" x 12' FLUTED POLEEXTRUDED ALUMINUM ALLOY 6005-T5 WALL THICKNESS - .125" FINIAL:FIN-A4 - ACORN FINIAL FOR 4" ROUND POLE. CAST ALUMINUM ALLOY #356 TRIM: TS2424N - TRIM FOR 24" X 24" SIGN CAST ALUMINUM ALLOY #356 SIGN:R5 -1/24 REFLECTIVE 24X24 ENTER SIGN SPECIFY VINYL TYPE BASE: SB-94 - SLIP-OVER BASE FOR 4" OD POLECAST ALUMINUM ALLOY #356 (ALSO AVAILABLE IN TWO-PIECE OPTION 2PC8) SHOWN WITH 2' BELOW GRADE POLE BURIAL SIGN SHOWN WITH 2' BELOW GRADE POLE BURIAL SIDE B N.T.S. PROPOSED NORTHERLY PARKING AREA PROPOSED RETAINING WALL PROPOSED42" HIGH WOOD RAILING -PLACED IN FRONT OF RETAINING WALL 1.ALL EXISTING SIGN ASSEMBLIES WITHIN THE PROJECT LIMITS NOT CALLED OUT FOR REPLACEMENT ARE TO REMAIN. 2.INSTALL SIGNS AND METAL SIGNS POSTS IN ACCORDANCE WITH TRAFFIC STANDARD SHEETS TR-1208_01 AND TR-1208_02. 3.EXACT LOCATIONS OF SIGNS TO BE VERIFIED BY ENGINEER. 4.SIGNS SHALL BE AT LEAST 10-FEET FROM ALL UTILITY POLES. 5.ALL SIGNS SHOULD BE REFERENCED ACCORDING TO THE CONNECTICUT DEPARTMENT OF TRANSPORTATION SIGN CATALOG SIGNING NOTES: SIGN BASE POLE FINIAL POLE:SP4X12 - 4" x 12' FLUTED POLE EXTRUDED ALUMINUM ALLOY 6005-T5WALL THICKNESS - .125" FINIAL: FIN-A4 - ACORN FINIAL FOR 4" ROUND POLE. CAST ALUMINUM ALLOY #356 TRIM: TS2424N - TRIM FOR 24" X 24" SIGNCAST ALUMINUM ALLOY #356 SIGN: R5 -1/24 REFLECTIVE 24X24 LEFT TURN ONLY SPECIFY VINYL TYPE BASE: SB-94 - SLIP-OVER BASE FOR4" OD POLE CAST ALUMINUM ALLOY #356 (ALSO AVAILABLE INTWO-PIECE OPTION 2PC8) SHOWN WITH 2' BELOW GRADE POLE BURIAL SIGN SIDE B LEFT TURN ONLY LEFTTURN ONLY SIGN:R5 -1/24 REFLECTIVE 24X24 NO LEFT TURNS SPECIFY VINYL TYPE CT DOT CATALOG 31-1603 NCF SIGN: R5 -1/24 REFLECTIVE 24X24 NO LEFT TURNS (FOR NEW SPANS)SPECIFY VINYL TYPE CT DOT CATALOG 31-1629 Sign Legend TO REMAIN/ NOT BE IMPACTED DURING CONSTRUCTION OR PROPOSED SIGNS SIGN:R5 -1/24 REFLECTIVE 24X24 ENTER SIGN SPECIFY VINYL TYPE EXITONLY 05/19/202615 REVISION CLOUDS 07/03/20233 WATER & SEWER CONNECTION 07/12/20234 TOWN PLANNER COMMENTS 07/20/20235 STAFF COMMENTS 11/21/20236 DOT COMMENTS 04/29/20247 DOT COMMENTS 06/05/20248 DOT COMMENTS 09/05/20249 DOT COMMENTS 11/04/202410 DOT COMMENTS 11/08/202411 DOT COMMENTS 12/09/202412 WATER/SEWER - DOT 03/07/202613 ADDED GREASE INTERCEPTOR 05/10/202614 COURT YARD MODIFICATION 5.1 14.1 14.1 14.2 14.3 14.4 14.5 5.3 5.4 5.5 14.6 5.6 10.1 5.7 5.86.1 6.1 14.7 5.9 5.11 5.12 10.2 7.1 5.3 5.13 7.2 5.85.2 5.5 5.5 5.10 5.10 50 50 50 50 50 50 50 50 50 50 34.0' 80 . 0 ' 4.0' 9.3'18.7' p p p p p pp p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p pppp p p p p p p p p p p p p p p p p p p p p p p p p p p pp p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p ppp NORWICH - NE W L O N D O N T U R N P I K E ( C O N N . R O U T E # 3 2 ) OC C U M L A N E PO D U R G I E L L A N E 76 . 0 ' 36.0' p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p 50 50 50 50 50 50 50 50 50 50 50 pppp p p p p p p X X X p p 5 0 50 HY A T T P L A C E D R I V E TO BE REPLACED IN KIND 4' WIDE CHANNEL PROPOSED DO NOT ENTER SIGN RIGHT OF WAY LINE AC C E S S D R I V E W A Y (M O N T V I L L E C O M M O N S / H O M E D E P O T ) D R I V E T H R U PROPOSED PARKING STRIPING (TYP.) PROPOSED "LEFT TURN ONLY" SIGN CT DOT CATALOG 31-1609 DRIVE WAY LOCATED IN CTDOT R.O.W. WILL BE PAVED WITH HOT MIX BITUMINOUS ASPHALT (TYP.) PROPOSED "NO LEFT TURN" SIGN CT DOT CATALOG 31-1629 PROPOSED LANE LINE PROPOSED DOTTED EXTENSION LINE (2' LINES AT 4' SPACING) - PER CTDOT STANDARD SHEET "TR-1210_08" PROPOSED "LEFT TURN ONLY" LANE EXTENDED -REMOVE EXISTING PAVEMENT MARKINGS PROPOSED PAVEMENT ARROW PROPOSED STOP SIGN (CTDOT 31-0552) 52' 139' 89' PROPOSED LANE LINE PROPOSED PAVEMENT ARROW PROPOSED PAVEMENT ARROW REPAINT EXISTING ARROW SIDEWALK TO BE REPLACED PROPOSED PAVEMENT ARROW (TYP.) PROPOSED BACK-TO-BACK "EXIT ONLY/DO NOT ENTER" & "NO LEFT TURN" SIGN CTDOT CATALOG 31-1119 & 31-1603 PROPOSED DOUBLE YELLOW CENTERLINE (DYCL) -PER CTDOT STANDARD SHEET "TR-1210_04" 95' FIRE TRUCK TRACKING PATH LINES AERIAL FIRE TRUCK AERIAL FIRE TRUCK SIDEWALK TO BE REPLACED PROPOSED BACK-TO-BACK ENTER SIGN PROPOSED DO NOT ENTER SIGNSTOP BAR (TYP.) Scale: 1"=1000' Location Map 21-001048JOB NO.DRAWN BY:OFSHEET NO. 0DRAWING SCALE: 1"=30'15 30 60 Prepared For: Uncasville, Connecticut 2040 New London Turnpike of Signing & Pavement Plan AMER CHOUDREY DATE REVISIONSNO. 2040 Route 32 Montville, Connecticut Office: (860) 536-7390 Fax: (860) 536-1644 Mailing Address: 70 Essex Street Mystic, Connecticut 06355 FEDUS ENGINEERINGCIVIL ENGINEERS LLC P: \ 2 0 2 1 \ 2 1 - 0 0 1 0 4 8 - U N C A S V I L L E - 2 0 4 0 R O U T E 3 2 - A M E R C H O U D R E Y - G A S S T A T I O N - S I T E P L A N A P P R O V A L \ A C A D \ 2 1 - 0 0 1 0 4 8 - U N C A S V I L L E - 2 0 4 0 R O U T E 3 2 - A M E R C H O U D R E Y - G A S S T A T I O N - P L A N N I N G A N D Z O N I N G - R E V . 1 5 . D W G UTILITY POLE W/ LIGHT OVERHEAD WIRES PROPERTY LINE INDEX CONTOUR STONEWALL NOW OR FORMERLY CONTOUR FENCE LINE WATER VALVE TYPICAL DRILL HOLE POINT OF BEGINNING Legend PROPOSED TEST PIT SYMBOL EXISTING DESCRIPTION p p ADJACENT PROPERTY LINE CATCH BASIN SPOT ELEVATION MEAN HIGH WATER LINE HIGH TIDE LINE COASTAL JURISDICTIONAL LINE WETLANDS BOUNDARY/FLAG MEAN LOW WATER LINE UTILITY POLE DRAINAGE MANHOLE EASEMENT LINE ZONE LINE EXISTING WATER LINE EXISTING SEWER LINE BUILDING SETBACK LINE SEWER MANHOLE PERCOLATION TEST HYDRANT WATER SHUTOFF DRILL HOLE EX. IP / REBAR MONUMENT IRON PIN TO BE SET 94 (AKA CT RT 32) 16 PODURGIEL LN UNCASVILLE, CT 06382 N/F V571/495 MAILING ADDRESS 16 PODURGIEL LN BETH SCIARRONI M/B/L: 103/001/00B PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 Gregg T. Fedus P.E. CT. License No. 21231 Gregg T. Fedus P.E. UPLANDSUPLANDS UPLANDS February 7, 2023 1.ALL PAVEMENT MARKINGS TO BE EPOXY RESIN. 2.ALL PAVEMENT MARKINGS TO BE INSTALLED IN ACCORDANCE WITH STANDARD SHEET TR-1210_04 AND TR-1210_08. 3.ERADICATE EXISTING CONFLICTING PAVEMENT MARKINGS. PAVEMENT MARKING NOTES: EXISTING EASEMNT Reference Maps: 1."BOUNDARY SURVEY PROPERTY OF NDKLP MONTVILLE ASSOCIATES, LLC 2040 ROUTE 32, UNCASVILLE, CONNECTICUT " DATED: SEPTEMBER 28, 2011, BY: JAMES BERNARDO LAND SURVEYING. LLC, LS #70121. 2."PROPERTY SURVEY MAP DEPICTING EXISTING CONDITIONS OF 2040 NEW LONDON TURNPIKE (AKA CT 32) UNCASVILLE, CONNECTICUT PREPARED FOR: AMER CHOUDREY" DATED: APRIL 18, 2023, REVISED TO 7/6/202, BY: ANTHONY HENDRIKS, LS #10834, FEDUS ENGINEERING,LLC. BASE POLE FINIALPOLE: SP4X12 - 4" x 12' FLUTED POLE EXTRUDED ALUMINUM ALLOY 6005-T5 WALL THICKNESS - .125" FINIAL: FIN-A4 - ACORN FINIAL FOR 4" ROUND POLE. CAST ALUMINUM ALLOY #356 TRIM: TS2424N - TRIM FOR 24" X 24" SIGN CAST ALUMINUM ALLOY #356 SIGN: R5 -1/24 REFLECTIVE 30X3O DO NOT ENTER SIGN CT DOT CATALOG 31-1119 BASE: SB-94 - SLIP-OVER BASE FOR 4" OD POLE CAST ALUMINUM ALLOY #356 (ALSO AVAILABLE IN TWO-PIECE OPTION 2PC8) SIDE A TRIM SIGN BASE POLE FINIALPOLE: SP4X12 - 4" x 12' FLUTED POLE EXTRUDED ALUMINUM ALLOY 6005-T5 WALL THICKNESS - .125" FINIAL: FIN-A4 - ACORN FINIAL FOR 4" ROUND POLE. CAST ALUMINUM ALLOY #356 TRIM: TS2424N - TRIM FOR 24" X 24" SIGN CAST ALUMINUM ALLOY #356 SIGN: R5 -1/24 REFLECTIVE 24X24 ENTER SIGN SPECIFY VINYL TYPE BASE: SB-94 - SLIP-OVER BASE FOR 4" OD POLE CAST ALUMINUM ALLOY #356 (ALSO AVAILABLE IN TWO-PIECE OPTION 2PC8) SHOWN WITH 2' BELOW GRADE POLE BURIAL SIGN SHOWN WITH 2' BELOW GRADE POLE BURIAL SIDE B TO REMAIN/ NOT BE IMPACTED DURING CONSTRUCTION OR PROPOSED SIGNS 1.ALL EXISTING SIGN ASSEMBLIES WITHIN THE PROJECT LIMITS NOT CALLED OUT FOR REPLACEMENT ARE TO REMAIN. 2.INSTALL SIGNS AND METAL SIGNS POSTS IN ACCORDANCE WITH TRAFFIC STANDARD SHEETS TR-1208_01 AND TR-1208_02. 3.EXACT LOCATIONS OF SIGNS TO BE VERIFIED BY ENGINEER. 4.SIGNS SHALL BE AT LEAST 10-FEET FROM ALL UTILITY POLES. 5.ALL SIGNS SHOULD BE REFERENCED ACCORDING TO THE CONNECTICUT DEPARTMENT OF TRANSPORTATION SIGN CATALOG SIGNING NOTES: SIGN BASE POLE FINIALPOLE: SP4X12 - 4" x 12' FLUTED POLE EXTRUDED ALUMINUM ALLOY 6005-T5 WALL THICKNESS - .125" FINIAL: FIN-A4 - ACORN FINIAL FOR 4" ROUND POLE. CAST ALUMINUM ALLOY #356 TRIM: TS2424N - TRIM FOR 24" X 24" SIGN CAST ALUMINUM ALLOY #356 SIGN: R5 -1/24 REFLECTIVE 24X24 LEFT TURN ONLY SPECIFY VINYL TYPE BASE: SB-94 - SLIP-OVER BASE FOR 4" OD POLE CAST ALUMINUM ALLOY #356 (ALSO AVAILABLE IN TWO-PIECE OPTION 2PC8) SHOWN WITH 2' BELOW GRADE POLE BURIAL SIGN SIDE B LEFT TURN ONLY LEFT TURNONLY SIGN: R5 -1/24 REFLECTIVE 24X24 NO LEFT TURNS SPECIFY VINYL TYPE CT DOT CATALOG 31-1603 NCF SIGN: R5 -1/24 REFLECTIVE 24X24 NO LEFT TURNS (FOR NEW SPANS) SPECIFY VINYL TYPE CT DOT CATALOG 31-1629 Sign Legend TO REMAIN/ NOT BE IMPACTED DURING CONSTRUCTION OR PROPOSED SIGNS SIGN: R5 -1/24 REFLECTIVE 24X24 ENTER SIGN SPECIFY VINYL TYPE EXIT ONLY SIGN: R1 -1 REFLECTIVE 30" (750) STOP SIGN SPECIFY VINYL TYPE CT DOT CATALOG 31-0552 INFERNO 107' AERIAL LADDER TRUCK 05/19/202615 REVISION CLOUDS 07/03/20233 WATER & SEWER CONNECTION 07/12/20234 TOWN PLANNER COMMENTS 07/20/20235 STAFF COMMENTS 11/21/20236 DOT COMMENTS 04/29/20247 DOT COMMENTS 06/05/20248 DOT COMMENTS 09/05/20249 DOT COMMENTS 11/04/202410 DOT COMMENTS 11/08/202411 DOT COMMENTS 12/09/202412 WATER/SEWER - DOT 03/07/202613 ADDED GREASE INTERCEPTOR 05/10/202614 COURT YARD MODIFICATION 10.1 14.1 14.1 14.1 172.82 50 50 50 50 50 50 50 50 50 50 34.0' 80 . 0 ' 4.0' 9.3'18.7' p p p p p pp p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p pppp p p p p p p p p p p p p p p p p p p p p p p p p p p pp p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p ppp NORWICH - NE W L O N D O N T U R N P I K E ( C O N N . R O U T E # 3 2 ) OC C U M L A N E PO D U R G I E L L A N E 76 . 0 ' 36.0' p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p 5 0 50 50 50 50 50 50 50 50 5 0 50 ppp p p p p p p p X X X p p 1 8 6 18 8 178 177.0 1 8 0 1 7 8 1 7 4 17 4 158.0 PROPOSED TYPE C CATCH BASIN #1 TF = 172.00' INV. OUT = 165.11' PROPOSED TYPE C CATCH BASIN #2 TF=171.43' INV. IN = 164.42' INV. OUT= 164.32' PROPOSED 69 LF 15" HDPE S= 1.0% PROPOSED 86 LF 15" HDPE S= 5.0% PROPOSED 41 LF 15" HDPE S= 0.8% PROPOSED 17 LF 15" HDPE S= 1.5% SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF PROPOSED F.E.U INV. 158.10' PROPOSED CONTROL STRUCTURE 1 TF = 163.5' INV. OUT = 158.00' 3" INV. OUT = 161.00' 4" INV. OUT = 163.50' GRATE PROPOSED F.E.U. INV. = 157.75' PROPOSED RETAINING WALL (DETENTION BASIN) T.O.W = 164.00' 5 0 50 PROPOSED PLUNGE POOL PROPOSED RIP RAP PROPOSED TRASH ENCLOSURE FF = 181.0' HY A T T P L A C E D R I V E PROPOSED HYDRO-DYNAMIC SEPARATOR 1 TF = 163.00' INV. IN = 158.26' INV. OUT = 158.16' 170 16 8 166 164 16 4 162 180 PROPOSED RETAINING WALL TOW = 186.00' 166 PROPOSED 8" RETAINING WALL TOW = 174.5' TO BE REMOVED /RELOCATED PROPOSED 80'x62' BUILDING 4,960 SF FF = 176.5' PROPOSED DETENTION BASIN BOTTOM ELEVATION = 158.00' 4' WIDE CHANNEL PROPOSED LIMITS OF DISTURBANCE FOLLOWS THE PROPOSED SILT FENCE PROPOSED WATER CONNECTION (RUN BESIDE SIDEWALK TO CONNECT AT PODURGIEL LANE) PROPOSED SEWER CONNECTION (RUN BESIDE SIDEWALK TO CONNECT AT PODURGIEL LANE)17 6 UE UE UE PROPOSED UNDERGROUND ELECTRIC CONNECTION A A PROPOSED ROOF LEADERS PIPED DOWN COLUMNS TO CATCH BASIN #2 PROPOSED TYPE C CATCH BASIN #3 TF=164.25' INV. IN = 160.02' INV. OUT = 159.77' 1 6 4 1 6 8 1 6 6 17 0 17 2 1 7 6 180 18 2 AC C E S S D R I V E W A Y (M O N T V I L L E C O M M O N S / H O M E D E P O T ) D R I V E T H R U 176.00 PROPOSED RETAINING WALL TOW = 180.50' PROPOSED ROOF LEADERS PIPED TO CATCH BASIN #2 PROPOSED YARD DRAIN TF = 175.75 PROPOSED YARD DRAIN TF = 175.75 B B PROPOSED EMERGENCY SPILL WAY ELEVATION =163.75' PROPOSED RIP RAP 180 176.36 PROPOSED GRASS SWALE 172.68 172 172.46 172.36 PROPOSED H-20 1000 GALLON GREASE INTERCEPTOR - 2 MANHOLES TO GRADE - INVERTS TO BE DETERMINED IN THE FIELD 1 8 4 172.82 p p p pp p p p p p p p p p p p p p pp PARCEL #1 p p p p 50 50 50 17 4 172.68 172.46 172.36 172.82 Scale: 1"=1000' Location Map 21-001048JOB NO.DRAWN BY:OFSHEET NO. 0DRAWING SCALE: 1"=30'15 30 60 Prepared For: Uncasville, Connecticut 2040 New London Turnpike of Grading Plan AMER CHOUDREY DATE REVISIONSNO. 2040 Route 32 Montville, Connecticut Office: (860) 536-7390 Fax: (860) 536-1644 Mailing Address: 70 Essex Street Mystic, Connecticut 06355 FEDUS ENGINEERINGCIVIL ENGINEERS LLC P: \ 2 0 2 1 \ 2 1 - 0 0 1 0 4 8 - U N C A S V I L L E - 2 0 4 0 R O U T E 3 2 - A M E R C H O U D R E Y - G A S S T A T I O N - S I T E P L A N A P P R O V A L \ A C A D \ 2 1 - 0 0 1 0 4 8 - U N C A S V I L L E - 2 0 4 0 R O U T E 3 2 - A M E R C H O U D R E Y - G A S S T A T I O N - P L A N N I N G A N D Z O N I N G - R E V . 1 5 . D W G NOTES: 1.AREA OF WETLAND ON SITE IS 21,832 SF/0.50 ACRES. 2.PROPOSED AREA DISTURBED IN THE 50' REVIEW ZONE IS 21,484 SF/0.49 ACRES UTILITY POLE W/ LIGHT OVERHEAD WIRES PROPERTY LINE INDEX CONTOUR STONEWALL NOW OR FORMERLY CONTOUR FENCE LINE WATER VALVE TYPICAL DRILL HOLE POINT OF BEGINNING Legend TEST PIT SYMBOL EXISTING DESCRIPTION p p ADJACENT PROPERTY LINE CATCH BASIN SPOT ELEVATION MEAN HIGH WATER LINE HIGH TIDE LINE COASTAL JURISDICTIONAL LINE WETLANDS BOUNDARY/FLAG MEAN LOW WATER LINE UTILITY POLE DRAINAGE MANHOLE EASEMENT LINE ZONE LINE EXISTING WATER LINE EXISTING SEWER LINE BUILDING SETBACK LINE SEWER MANHOLE PERCOLATION TEST HYDRANT WATER SHUTOFF DRILL HOLE EX. IP / REBAR MONUMENT 95 (AKA CT RT 32) 16 PODURGIEL LN UNCASVILLE, CT 06382 N/F V571/495 MAILING ADDRESS 16 PODURGIEL LN BETH SCIARRONI M/B/L: 103/001/00B PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 Gregg T. Fedus P.E. CT. License No. 21231 Gregg T. Fedus P.E. UPLANDSUPLANDS UPLANDS WETLAND AREA DELINEATED BY FUSS & O'NEILL AND CONFIRMED BY DAVID LORD, SOIL SCIENTIST PROPOSED BASIN PLANTS SEEDED WITH WOOL - SEDGE 2" PLUG (SCIRPUS CYPERINUS) (155), -SOFT RUSH 2" PLUG (JUNUCS EFFUSUS) (58), -HOT SEDGE (CAREX LUPULINA)(58) (BASIN TO BE SEEDED BETWEEN APRIL 1 AND JUNE 1) PROPOSED 4" UNDERDRAIN February 7, 2023 PROPOSED IRON PIN TO BE SET EXISTING EASEMNT Reference Maps: 1."BOUNDARY SURVEY PROPERTY OF NDKLP MONTVILLE ASSOCIATES, LLC 2040 ROUTE 32, UNCASVILLE, CONNECTICUT " DATED: SEPTEMBER 28, 2011, BY: JAMES BERNARDO LAND SURVEYING. LLC, LS #70121. 2."PROPERTY SURVEY MAP DEPICTING EXISTING CONDITIONS OF 2040 NEW LONDON TURNPIKE (AKA CT 32) UNCASVILLE, CONNECTICUT PREPARED FOR: AMER CHOUDREY" DATED: APRIL 18, 2023, REVISED TO 7/6/202, BY: ANTHONY HENDRIKS, LS #10834, FEDUS ENGINEERING,LLC. N.T.S. PROPOSED NORTHERLY PARKING AREA 2.50% 1.00% 4.00% 1.40% 172.68 172.46 172.36 4.00% PROPOSED TYPE C CATCH BASIN #1 TF = 172.00' INV.OUT = 165.11' 2.00% 2.00% NCF 05/19/202615 REVISION CLOUDS 07/03/20233 WATER & SEWER CONNECTION 07/12/20234 TOWN PLANNER COMMENTS 07/20/20235 STAFF COMMENTS 11/21/20236 DOT COMMENTS 04/29/20247 DOT COMMENTS 06/05/20248 DOT COMMENTS 09/05/20249 DOT COMMENTS 11/04/202410 DOT COMMENTS 11/08/202411 DOT COMMENTS 12/09/202412 WATER/SEWER - DOT 03/07/202613 ADDED GREASE INTERCEPTOR 05/10/202614 COURT YARD MODIFICATION 13.1 13.1 5.4 5.7 5.7 5.6 5.3 5.1 5.2 5.9 5.10 5.8 5.5 5.2 5.12 5.11 5.6 5.8 5.9 172.82 50 50 50 50 50 50 50 50 50 50 34.0' 80 . 0 ' 4.0' 9.3'18.7' p p p p p pp p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p pppp p p p p p p p p p p p p p p p p p p p p p p p p p p pp p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p ppp NORWICH - NE W L O N D O N T U R N P I K E ( C O N N . R O U T E # 3 2 ) OC C U M L A N E PO D U R G I E L L A N E 76 . 0 ' 36.0' p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p 50 50 50 50 50 50 50 50 50 50 50 pppp p p p p p p X X X p p 1 8 6 18 8 178 177.0 1 8 0 1 7 8 1 7 4 17 4 158.0 SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF PROPOSED HAY BALE PROPOSED SILT FENCE IN FRONT OF HAY BALES (PROPOSED LIMITS OF DISTURBANCE FOLLOWS THE PROPOSED SILT FENCE) 5 0 50 HY A T T P L A C E D R I V E 17 0 168 166 16 4 16 4 162 180 166 30' REAR YARD SETBACK 50' FRONT YARD SETB A C K 50 ' R E A R Y A R D S E T B A C K 30' S I D E Y A R D S E T B A C K 30 ' S I D E Y A R D S E T B A C K TO BE REMOVED /RELOCATED PROPOSED 80'x62' BUILDING 4,960 SF FF = 176.5' PROPOSED STOCKPILE LOCATION 4' WIDE CHANNEL PROPOSED COIR WATTLE CHECK DAM PROPOSED COIR WATTLE CHECK DAM PROPOSED DEWATERING BASIN -WITH 15' X 15' DEWATERING BAG 51 5 10 51 2 5 10 51 5 10 51 2 5 10 17 6 UE UE UE 1 6 4 1 6 8 1 6 6 170 17 2 1 7 6 180 18 2 AC C E S S D R I V E W A Y (M O N T V I L L E C O M M O N S / H O M E D E P O T ) D R I V E T H R U 176.00 180 176.36 172.68 17 2 172.46 172.36 1 8 4 pp p p p p p p p p p p p p p p 76 . 0 ' 50 50 50 SF SF 5 1 5 10 5 1 2 5 10 Scale: 1"=1000' Location Map 21-001048JOB NO.DRAWN BY:OFSHEET NO. 0DRAWING SCALE: 1"=30'15 30 60 Prepared For: Uncasville, Connecticut 2040 New London Turnpike of Soil & Erosion Control Plan AMER CHOUDREY DATE REVISIONSNO. 2040 Route 32 Montville, Connecticut Office: (860) 536-7390 Fax: (860) 536-1644 Mailing Address: 70 Essex Street Mystic, Connecticut 06355 FEDUS ENGINEERINGCIVIL ENGINEERS LLC P: \ 2 0 2 1 \ 2 1 - 0 0 1 0 4 8 - U N C A S V I L L E - 2 0 4 0 R O U T E 3 2 - A M E R C H O U D R E Y - G A S S T A T I O N - S I T E P L A N A P P R O V A L \ A C A D \ 2 1 - 0 0 1 0 4 8 - U N C A S V I L L E - 2 0 4 0 R O U T E 3 2 - A M E R C H O U D R E Y - G A S S T A T I O N - P L A N N I N G A N D Z O N I N G - R E V . 1 5 . D W G UTILITY POLE W/ LIGHT OVERHEAD WIRES PROPERTY LINE INDEX CONTOUR STONEWALL NOW OR FORMERLY CONTOUR FENCE LINE WATER VALVE TYPICAL DRILL HOLE POINT OF BEGINNING Legend PROPOSED TEST PIT SYMBOL EXISTING DESCRIPTION p p ADJACENT PROPERTY LINE CATCH BASIN SPOT ELEVATION MEAN HIGH WATER LINE HIGH TIDE LINE COASTAL JURISDICTIONAL LINE WETLANDS BOUNDARY/FLAG MEAN LOW WATER LINE UTILITY POLE DRAINAGE MANHOLE EASEMENT LINE ZONE LINE EXISTING WATER LINE EXISTING SEWER LINE BUILDING SETBACK LINE SEWER MANHOLE PERCOLATION TEST HYDRANT WATER SHUTOFF DRILL HOLE EX. IP / REBAR MONUMENT IRON PIN TO BE SET 96 (AKA CT RT 32) 16 PODURGIEL LN UNCASVILLE, CT 06382 N/F V571/495 MAILING ADDRESS 16 PODURGIEL LN BETH SCIARRONI M/B/L: 103/001/00B PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 Gregg T. Fedus P.E. TWO STAKES PER BALE HAY BALE BARRIER DETAIL NOT TO SCALE FLOW DIRECTION SF SF NOT TO SCALE SILT FENCE DETAIL STEP 1 2"x4"x4' POSTS SET 8' - 10' APART EXISTING GRADE SET POSTS AND EXCAVATE A 6"x6" TRENCH. SET POSTS DOWNSLOPE. STEP 2 STEP 3 STEP 4 ANGLE 10° UPSLOPE FOR STABILITY AND SELF CLEANING 12" MIN. DEPTH 100° WIRE FENCING STAPLE THE WIRE MESH FENCING TO END POSTS. FILTER FABRIC ATTACH FILTER FABRIC TO THE WIRE FENCING AND EXTEND IT TO THE TRENCH. COMPACTED BACKFILL BACKFILL THE TRENCH AND COMPACT THE EXCAVATED SOIL. PROPOSED ANTI-TRACKING PAD N.T.S. ANTI-TRACKING PAD CT. License No. 21231 Gregg T. Fedus P.E. UPLANDSUPLANDS UPLANDS VEGETATIVE TURF ESTABLISHMENT PROCEDURE SCARIFY ALL AREAS TO BE TOPSOILED AND SEEDED. APPLY A MINIMUM OF 4 INCHES OF TOPSOIL ON ALL AREAS TO BE SEEDED. APPLY GRASS SEED, LIME, FERTILIZER AND MULCH ACCORDING TO THE FOLLOWING SCHEDULE: PERMANENT SEED MIXTURE: CREEPING RED FESCUE 2.4 LBS. PER 1,000 SQ. FT. REDTOP 0.2 TALL FESCUE 2.4 TOTAL 5.0 FERTILIZER: 10-10-10 APPLY AT 7.5 LBS. PER 1,000 SQ. FT. LIMESTONE: APPLY AT 150 LBS. PER 1,000 SQ. FT. MULCHING: SPREAD HAY OR STRAW OVER ALL AREAS AFTER SEEDING. USE 1 1/2 TO 2 BALES PER 1,000 SQ. FT. TARGET FOR 100% COVERAGE. ANCHOR BY USING NETTING OR TRACKING AS NECESSARY. SEEDING DATES: SEEDING DATES IN CONNECTICUT ARE NORMALLY APRIL 1 THROUGH JUNE 15 AND AUGUST 15 THROUGH OCTOBER 1. SEED GERMINATION NORMALLY CANNOT BE EXPECTED FROM NOVEMBER THROUGH FEBRUARY. IF ADEQUATE SEED GERMINATION IS NOT POSSIBLE DUE TO TIME OF YEAR CONSTRAINTS, MULCHING SHALL BE ADEQUATELY PROVIDED TO PROTECT THE SEED FROM WIND AND SURFACE EROSION UNTIL THE WEATHER IMPROVES AND THE SEEDING BECOMES WELL ESTABLISHED. CONSTRUCTION SEQUENCE 1.INSTALL ALL EROSION AND SEDIMENT CONTROL AS SHOWN ON APPROVED PLANS. 2.INSPECTION OF EROSION CONTROL INSTALLATION BY TOWN STAFF & DESIGN ENGINEER. 3.CLEAR AND GRUB SITE TO LIMITS OF DISTURBANCE. 4.ROUGH GRADE SITE. 5.CONSTRUCT OF RETAINING WALL. 6.CONSTRUCT BUILDING. A.EXCAVATE FOUNDATION OF BUILDING B.FORM AND POUR FOOTINGS AND WALLS C.STRIP FORMS, WATERPROOF FOUNDATIONS AND BACKFILL D.COMPACT LOWER LEVEL FLOOR AND POUR CONCRETE FLOORS E.FRAME BUILDING AND ROOFING F.INSTALL WINDOWS AND DOORS G.INSTALL SIDING H.ROUGH MECHANICALS I.INSULATE J.SHEETROCK K.INTERIOR TRIM AND DOORS L.FLOORING M.FINISH MECHANICALS N.PAINT 7.CONSTRUCT TANKS 8.CONSTRUCT CANOPY & PUMPS 9.REMOVE UTILITY POLE 10.CONSTRUCT BASIN. 11.INSTALL SEWER LINE. 12.INSTALL WATER LINE. 13.INSTALL DRAINAGE SYSTEM. 14.INSTALL UNDERGROUND ELECTRIC. 15.INSTALL SUBGRADE AND COMPACT IN PAVED AREAS. 16.INSTALL SIDEWALKS. 17.PLACE BINDER COURSE. 18.INSTALL SURFACE COURSE. 19.LOAM AND SEED DISTURBED AREAS. 20.LANDSCAPE FINISHED AREAS. 21.FINAL STABILIZATION OF SITE. 22.FINAL CLEANING OF STORMWATER SYSTEM AND GENERAL SITE CLEANUP. 23.OBTAIN FINAL INSPECTIONS. 24.REMOVE EROSION AND SEDIMENTATION CONTROL DEVICES. SOIL EROSION AND SEDIMENT CONTROL PLAN NARRATIVE THE SITE CONTRACTOR MUST FOLLOW ALL GUIDELINES SET FORTH IN THE MANUAL ENTITLED "2002 CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL" PUBLISHED BY THE CONNECTICUT COUNCIL ON SOIL AND WATER CONSERVATION IN COOPERATION WITH THE CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION. THIS MANUAL IS ALSO KNOWN AS DEP BULLETIN 34. IN ADDITION THE SITE CONTRACTOR MUST FOLLOW THE TOWN'S ZONING AND SUBDIVISION REGULATIONS, TOWN EMERGENCY STANDARDS AND SPECIFICATIONS, CTDOT FORM 816 WHERE APPLICABLE. COIR WATTLE: CHECK DAMS IN SLOPES & WATERWAYS CONTROL BLANKET (ECB). MAT (TRM) OR EROSION TURF REINFORCEMENT WITH PERMANENT WOODY PLANTS. COIR WATTLE AND WILLOW FASCINES STABALIZING SLOPE WEDGE COIR WATTLEFIGURE2A FIGURE1 THAN POINT B POINT A SHOULD BE HIGHER COIR WATTLEWEDGEFIGURE2B PROPER PLACEMENT OF COIR WATTLE IN SLOPE WEDGE COIR WATTLE BA PROPER PLACEMENT OF COIR WATTLE IN DRAINAGE WAY WILLOW FASCINES NOTES: 1. ON DRAINAGE WAY LINED WITH TURF REINFORCEMENT MAT (TRM) OR EROSION CONTROL BLANKET (ECB), COIR WATTLE SHALL BE INSTALLED AS CHECK DAMS (FIG 1). 2. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 3. DO NOT SCALE DRAWING. 4. THIS DRAWING IS INTENDED FOR USE BY ARCHITECTS, ENGINEERS, CONTRACTORS, CONSULTANTS AND DESIGN PROFESSIONALS FOR PLANNING PURPOSES ONLY. THIS DRAWING MAY NOT BE USED FOR CONSTRUCTION. 5. ALL INFORMATION CONTAINED HEREIN WAS CURRENT AT THE TIME OF DEVELOPMENT BUT MUST BE REVIEWED AND APPROVED BY THE PRODUCT MANUFACTURER TO BE CONSIDERED ACCURATE. 6. CONTRACTOR'S NOTE: FOR PRODUCT AND COMPANY INFORMATION VISIT www.CADdetails.com/info AND ENTER REFERENCE NUMBER 084-015A. N.T.S. PROPOSED COFFER DAM AROUND FUEL TANKS PROPOSED COFFER DAM (SHEET PILLING) PROPOSED CONCRETE PAD PROPOSED FUEL TANKS February 7, 2023 NCF 05/19/202615 REVISION CLOUDS 07/03/20233 WATER & SEWER CONNECTION 07/12/20234 TOWN PLANNER COMMENTS 07/20/20235 STAFF COMMENTS 11/21/20236 DOT COMMENTS 04/29/20247 DOT COMMENTS 06/05/20248 DOT COMMENTS 09/05/20249 DOT COMMENTS 11/04/202410 DOT COMMENTS 11/08/202411 DOT COMMENTS 12/09/202412 WATER/SEWER - DOT 03/07/202613 ADDED GREASE INTERCEPTOR 05/10/202614 COURT YARD MODIFICATION 50 50 50 50 50 50 50 50 50 50 34.0' 80 . 0 ' 4.0' 9.3'18.7' p p p p p pp p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p pppp p p p p p p p p p p p p p p p p p p p p p p p p p p pp p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p ppp NORWICH - NE W L O N D O N T U R N P I K E ( C O N N . R O U T E # 3 2 ) OC C U M L A N E PO D U R G I E L L A N E 76 . 0 ' 36.0' p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p 50 50 50 50 50 50 50 50 50 50 50 pppp p p p p p p X X X p p 5 0 50 HY A T T P L A C E D R I V E 30' REAR YARD SETBACK 50' FRONT YARD SETB A C K 50 ' R E A R Y A R D S E T B A C K 30' S I D E Y A R D S E T B A C K 30 ' S I D E Y A R D S E T B A C K TO BE REMOVED /RELOCATED PROPOSED 80'x62' BUILDING 4,960 SF FF = 176.5' 4' WIDE CHANNEL 51 5 10 51 2 5 10 51 5 10 51 2 5 10 27 KL PROPOSED AREA LIGHT - CUT-OFF (9 TYPICAL) 1 BP PROPOSED CANOPY LIGHTS (8 TYP.) PROPOSED WALL PACK (2 TYP.) UE UE UE AC C E S S D R I V E W A Y (M O N T V I L L E C O M M O N S / H O M E D E P O T ) D R I V E T H R U PROPOSED MULCH AROUND PLANTING (TYP.) - BALANCE OF DISTURBED ARE TO BE PLANTED WITH GRASS GRASS GRASS GRASS GRASS GRASS ISLAND GRASS ISLAND GRASS ISLAND GRASS GR A S S GRASS GRASS Scale: 1"=1000' Location Map 21-001048JOB NO.DRAWN BY:OFSHEET NO. 0DRAWING SCALE: 1"=30'15 30 60 Prepared For: Uncasville, Connecticut 2040 New London Turnpike of Landscaping & Lighting Plan AMER CHOUDREY DATE REVISIONSNO. 2040 Route 32 Montville, Connecticut Office: (860) 536-7390 Fax: (860) 536-1644 Mailing Address: 70 Essex Street Mystic, Connecticut 06355 FEDUS ENGINEERINGCIVIL ENGINEERS LLC P: \ 2 0 2 1 \ 2 1 - 0 0 1 0 4 8 - U N C A S V I L L E - 2 0 4 0 R O U T E 3 2 - A M E R C H O U D R E Y - G A S S T A T I O N - S I T E P L A N A P P R O V A L \ A C A D \ 2 1 - 0 0 1 0 4 8 - U N C A S V I L L E - 2 0 4 0 R O U T E 3 2 - A M E R C H O U D R E Y - G A S S T A T I O N - P L A N N I N G A N D Z O N I N G - R E V . 1 5 . D W G NOTES: 1.AREA OF WETLAND ON SITE ARE 21,832 SF/0.50 ACRES. 2.PROPOSED AREA DISTURBED IN THE 50' REVIEW ZONE IS 21,484 SF/0.49 ACRES. 3.ALL PLANTED AND LANDSCAPED AREAS SHALL BE MAINTAINED CONTINUOUSLY BY THE OWNER OF THE PROPERTY. ALL TREES REQUIRED TO BE PLANTED IN LANDSCAPED AREAS SHALL BE AT LEAST SIX-FEET IN HEIGHT AT THE TIME OF THE PLANTING. 4.THE OWNER OF PROPERTY USED FOR PARKING AND / OR LOADING SHALL MAINTAIN SUCH AREA AND ALL REQUIRED SIDEWALKS AND BUFFER AREAS IN GOOD CONDITIONS WITHOUT HOLES AND FREE OF ALL DUST, TRASH, AND OTHER DEBRIS. 5.ALL SITE LIGHTING MUST BE OF THE "FULL CUT OFF" DESIGN, AND CONTROLLED FOR DAYLIGHT AND DIMMING AS DEFINED BY THE CT MODIFICATIONS TO THE INTERNATIONAL ENERGY CONSERVATION CODE. 6.LIGHT POLE BASES SHALL BE ENGINEERED FOR WIND LOADS ASSOCIATED WITH THE ACTUAL POST TO BE INSTALLED. MANUFACTURERS SPECIFICATIONS WHERE PRE-ENGINEERED ARE ACCEPTABLE. 7.POST SIGN WILL REQUIRE A SEPARATE PERMIT, AND REQUIRE ENGINEERED FOUNDATION FOR WIND LOAD DESIGN. UTILITY POLE W/ LIGHT OVERHEAD WIRES PROPERTY LINE INDEX CONTOUR STONEWALL NOW OR FORMERLY CONTOUR FENCE LINE WATER VALVE TYPICAL DRILL HOLE POINT OF BEGINNING Legend TEST PIT SYMBOL EXISTING DESCRIPTION p p ADJACENT PROPERTY LINE CATCH BASIN SPOT ELEVATION MEAN HIGH WATER LINE HIGH TIDE LINE COASTAL JURISDICTIONAL LINE WETLANDS BOUNDARY/FLAG MEAN LOW WATER LINE UTILITY POLE DRAINAGE MANHOLE EASEMENT LINE ZONE LINE EXISTING WATER LINE EXISTING SEWER LINE BUILDING SETBACK LINE SEWER MANHOLE PERCOLATION TEST HYDRANT WATER SHUTOFF DRILL HOLE EX. IP / REBAR MONUMENT 97 ·SOIL MANAGEMENT: ··THE TREATMENT BEGINS WITH SOIL TESTING TO DETERMINE ITS PH LEVEL, NUTRIENT COMPOSITION, AND TEXTURE. BASED ON THE RESULTS, THE SOIL MAY REQUIRE AMENDMENTS LIKE ORGANIC COMPOST OR SAND TO IMPROVE ITS FERTILITY AND DRAINAGE. REGULAR MULCHING HELPS TO RETAIN SOIL MOISTURE, REDUCE EROSION, AND SUPPRESS WEED GROWTH. ·PLANT SECTION: ··THE PLANTS CHOSEN FOR THESE LANDSCAPED ISLANDS WERE DONE TO INSURE VISUAL APPEAL AND SUSTAINABILITY. NATIVE PLANTS WERE CHOSEN TO ADAPTED TO THE LOCAL CLIMATE AND SOIL CONDITIONS. THESE PLANTS ARE MORE RESISTANT TO LOCAL PESTS AND DISEASES, AND SUPPORT LOCAL BIODIVERSITY. ·GROUND COVER: ··GRASS, MOSS, AND PLANTS WITH A LOW GROWTH PATTERN WILL BE INCLUDED IN THE LANDSCAPING. THESE SELECTIONS CONTRIBUTE TO SOIL EROSION PREVENTION WHILE ALSO DELIVERING A VISUALLY APPEALING AND DIVERSE SURFACE. ·INCORPORATING HARD SURFACES: ··WE HAVE MINIMIZED THE INCLUSION OF NON-ESSENTIAL PATHWAYS, BENCHES, OR OTHER HARDSCAPES INTENDED FOR HUMAN USE, IN AN EFFORT TO LESSEN THE IMPACT ON THE VEGETATION. ·WATER MANAGEMENT: ··A THOUGHTFUL DRAINAGE SYSTEM HAS BEEN CREATED TO MITIGATE THE RISKS OF WATERLOGGING AND PLANT DISEASE. THIS DESIGN IS ALSO ADEPT AT MINIMIZING THE NEED FOR AN EXTENSIVE IRRIGATION SYSTEM IN DRY AREAS. ·REGULAR MAINTENANCE: ··REGULAR PRUNING, WEEDING, FERTILIZING, AND WATERING ENSURES THE LANDSCAPED AREA STAYS HEALTHY AND ATTRACTIVE. REGULAR INSPECTION FOR PESTS AND DISEASES ALLOWS FOR EARLY DETECTION AND TREATMENT. Surface Landscaping Notes: (AKA CT RT 32) 16 PODURGIEL LN UNCASVILLE, CT 06382 N/F V571/495 MAILING ADDRESS 16 PODURGIEL LN BETH SCIARRONI M/B/L: 103/001/00B PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 Gregg T. Fedus P.E. CT. License No. 21231 Gregg T. Fedus P.E. UPLANDSUPLANDS UPLANDS WETLAND AREA DELINEATED BY FUSS & O'NEILL PLANT LIST KEY QUANTITY BOTANICAL NAME COMMON NAME SIZE, ROOTS, REMARKS BP 1 BETULA POPULIFOLIA GRAY BIRCH 10'-15' TALL KL 27 KALMIA LATIFOLIA MOUNTAIN LAUREL 6'-10' February 7, 2023 PROPOSED IRON PIN TO BE SET EXISTING EASEMNT Reference Maps: 1."BOUNDARY SURVEY PROPERTY OF NDKLP MONTVILLE ASSOCIATES, LLC 2040 ROUTE 32, UNCASVILLE, CONNECTICUT " DATED: SEPTEMBER 28, 2011, BY: JAMES BERNARDO LAND SURVEYING. LLC, LS #70121. 2."PROPERTY SURVEY MAP DEPICTING EXISTING CONDITIONS OF 2040 NEW LONDON TURNPIKE (AKA CT 32) UNCASVILLE, CONNECTICUT PREPARED FOR: AMER CHOUDREY" DATED: APRIL 18, 2023, REVISED TO 7/6/202, BY: ANTHONY HENDRIKS, LS #10834, FEDUS ENGINEERING,LLC. VEGETATIVE TURF ESTABLISHMENT PROCEDURE SCARIFY ALL AREAS TO BE TOPSOILED AND SEEDED. APPLY A MINIMUM OF 4 INCHES OF TOPSOIL ON ALL AREAS TO BE SEEDED. APPLY GRASS SEED, LIME, FERTILIZER AND MULCH ACCORDING TO THE FOLLOWING SCHEDULE: PERMANENT SEED MIXTURE: CREEPING RED FESCUE 2.4 LBS. PER 1,000 SQ. FT. REDTOP 0.2 TALL FESCUE 2.4 TOTAL 5.0 FERTILIZER: 10-10-10 APPLY AT 7.5 LBS. PER 1,000 SQ. FT. LIMESTONE: APPLY AT 150 LBS. PER 1,000 SQ. FT. MULCHING: SPREAD HAY OR STRAW OVER ALL AREAS AFTER SEEDING. USE 1 1/2 TO 2 BALES PER 1,000 SQ. FT. TARGET FOR 100% COVERAGE. ANCHOR BY USING NETTING OR TRACKING AS NECESSARY. SEEDING DATES: SEEDING DATES IN CONNECTICUT ARE NORMALLY APRIL 1 THROUGH JUNE 15 AND AUGUST 15 THROUGH OCTOBER 1. SEED GERMINATION NORMALLY CANNOT BE EXPECTED FROM NOVEMBER THROUGH FEBRUARY. IF ADEQUATE SEED GERMINATION IS NOT POSSIBLE DUE TO TIME OF YEAR CONSTRAINTS, MULCHING SHALL BE ADEQUATELY PROVIDED TO PROTECT THE SEED FROM WIND AND SURFACE EROSION UNTIL THE WEATHER IMPROVES AND THE SEEDING BECOMES WELL ESTABLISHED. NCF 05/19/202615 REVISION CLOUDS 07/03/20233 WATER & SEWER CONNECTION 07/12/20234 TOWN PLANNER COMMENTS 07/20/20235 STAFF COMMENTS 11/21/20236 DOT COMMENTS 04/29/20247 DOT COMMENTS 06/05/20248 DOT COMMENTS 09/05/20249 DOT COMMENTS 11/04/202410 DOT COMMENTS 11/08/202411 DOT COMMENTS 12/09/202412 WATER/SEWER - DOT 03/07/202613 ADDED GREASE INTERCEPTOR 05/10/202614 COURT YARD MODIFICATION 5.1 5.2 5.3 5.4 5.5 5.6 34.0' 80 . 0 ' 4.0' 9.3'18.7' NORWICH - NEW L O N D O N T U R N P I K E ( C O N N . R O U T E # 3 2 ) OC C U M L A N E PO D U R G I E L L A N E 76 . 0 ' 36.0' 30' REAR YARD SETBACK 50' FRONT YARD SETBACK 50 ' R E A R Y A R D S E T B A C K 30' S I D E Y A R D S E T B A C K 30 ' S I D E Y A R D S E T B A C K TO BE REMOVED /RELOCATED PROPOSED80'x62'BUILDING4,960 SFFF = 176.5' UE AC C E S S D R I V E W A Y (M O N T V I L L E C O M M O N S / H O M E D E P O T ) D R I V E T H R U PROPOSED RETAINING WALL (SEE DETAIL THIS SHEET). PROPOSED 15" FLARED END UNIT PROPOSED MODIFIED RIPRAP (12" THICK) EXISTING GRADE PROPOSED FEU INV=157.75' PROPOSED FILTER FABRIC PROPOSED 1-1/4" CLEAN CRUSHED STONE (BEDDING MATERIAL) PROPOSED LEVEL SPREADER LIP ELEVATION = 156.75' 15" HDPE 2 1 2.1' (1' MIN.) BOTTOM OF POOL ELEVATION = 155.61' 2:1 2: 1 2: 1 STORM DRAIN FLOWA A SET ELEVATION 1' LOWER THAN PIPE OUTLET INVERT 4.2'4.2'6.0' 14.4' 17778 5101516 DRAWN CHECKED QA MFG APPROVED toddbolzer 12/21/2020 NORWESCO, INC. SAINT BONIFACIUS, MN TITLE 15000 GALLON UNDERGROUND TANK SIZE B SCALE: 1/16 PN 41615 SHEET 1 OF 1 REV 21-001048JOB NO.DRAWN BY:OFSHEET NO. DRAWING SCALE: AS SHOWN Prepared For: Uncasville, Connecticut 2040 New London Turnpike of Details I AMER CHOUDREY DATE REVISIONSNO. Office: (860) 536-7390 Fax: (860) 536-1644 Mailing Address: 70 Essex Street Mystic, Connecticut 06355 FEDUS ENGINEERINGCIVIL ENGINEERS LLC P: \ 2 0 2 1 \ 2 1 - 0 0 1 0 4 8 - U N C A S V I L L E - 2 0 4 0 R O U T E 3 2 - A M E R C H O U D R E Y - G A S S T A T I O N - S I T E P L A N A P P R O V A L \ A C A D \ 2 1 - 0 0 1 0 4 8 - U N C A S V I L L E - 2 0 4 0 R O U T E 3 2 - A M E R C H O U D R E Y - G A S S T A T I O N - P L A N N I N G A N D Z O N I N G - R E V . 1 5 . D W G 98 (AKA CT RT 32) Gregg T. Fedus P.E. TRUCK TURNING TEMPLATE NOT TO SCALE CT. License No. 21231 Gregg T. Fedus P.E. PROPOSED FUEL TANKS TRUCK'S TURNING RADIUS NOTE: TRUCK USED WAS AASHTO WB-50 INTERSTATE SEMI-TRAILER 3 5/8"3 5/8" 15 1 5 / 1 6 " 15 1 5 / 1 6 " 11 1 / 2 " TYPE "C" CATCH BASIN DETAIL TYPE "C" CATCH BASIN DETAIL TYPE "C" CATCH BASIN.DWG NOT TO SCALE 12" 7 5/8" 8" 5'-4" 4'-0" SECTION A-A 12" 7 5/8" 2'-8 3/4" 2'- 0 " M I N . SECTION B-B 6"6" 8"8"3'-0" 4'-4" 2'- 0 " 2'- 0 " VA R I A B L E VA R I A B L E 12"2'-1 3/8" 2 13/16" 7 13/16" 8" 8" 1. REMOVE HAYBALE BARRIER AFTER PERMANENT GROUNDCOVER HAS BEEN ESTABLLISHED. 2. CLEAN SUMPS AFTER REMOVAL OF BARRIER. 3. CATCH BASINS SHALL BE PRECAST UNITS. 2'-2 3/8" A 2'-2 3/8" 5'-4" B PLAN B 10 3/16" A 4' - 4 " 10 3/16"10" NOTES: 10"2" 3 13/16" 2"2" 1"2 13/16"2" 2:1 M I N . VARIES VARIES 2:1 MI N . PROPOSED GRADE DENSE GRASS GROWTH GRASS DRAINAGE SWALE NOT TO SCALE PLUNGE POOL DETAIL (LOOKING NORTH) SCALE: 1"=5' DUMPSTER ENCLOSURE DETAIL NOT TO SCALE 6' HIGH WOODEN STOCKADE FENCE SUPPORT POST SECURED TO CONCRETE PAD (TYPICAL) CONCRETE PAD 6' WOODEN STOCKADE GATE (TYPICAL) 8- 0 " 20'-0" DUMPSTER Specifications Outlet 1. Must be independently tested to the 2013 NJDEP Laboratory Protocol and 2013 ETV Canada protocol (ISO 14024:2016). Separator must be sized based on this data. 2. Any testing performed by the manufacturer is unacceptableto demonstrate an alternate equal. 3. Field Testing is unreliable, site and storm specific, and subjectto compounding equipment and analytical errors and thereforeis unacceptable as verification of an alternate equal. TARP verfication as per NJDEP is testing consistent with the 2013 NJDEP laboratory protocol. 4. The separator must be designed based on the following criteria: Flow Criteria Water Quality FLow Rate cfs (L/s) Peak Design Flow Rate cfs TSS Removal Criteria Annual TSS Removal (%) NJDEP/ETV Canada TSS OK110 Sand City of Toronto Other Notes: 1. Headloss K factor of 1.04 for hydraulic gradeline calculations 2. Sump depths shown are typical. Additional depth can be added as required 3. Multiple inlet pipes allowed 4. Drops allowed 5. Inlet invert elevations should be the same or higher than the outlet invert elevation.Inlet can be up to 12" (300 mm) lower than outlet if pretreatment area is omitted but 12" (300 mm) must be added to sump depth to maintain overall treatment volume. 6. Solid Cover shown. HydroStorm can be desiged with an inlet grate if required. 7. Oil capacities given are spill capacities. 8. Sediment depths are maximum holding capacities and not recommended capacities forregular maintenance. 9. Capacities are rounded down to nearest 5 gal or ft3 (1L or 0.1 m3 for metric units) 10. Base Extensions not provided on standard units larger than the HS 6. Extensions can be provided if required due to groundwater/buoyancy concerns at the request of the engineer of record. 11. HS4 to HS6 models require one frame and cover. HS7 to HS12 models require two covers REVISION DATE: 12/5/2022 D H Plan Inlet HydroStorm Components A. Perforated Scour Plate B. Outlet DiskC. Pretreatment DiskD. Pretreatment GrateE. Inner Chamber F. By-Pass Weirs G. Frame and Cover (1-2)H. Inlet and Outlet PipesI. Structure Diameter J. Base Extension (HS4 - HS6)K. Sump Depth A Profile HydroStorm by Hydroworks, LLCUS Patent No. 10,710,907 www.hydroworks.com 888-290-7900 Model HS 3 HS 4 HS 5 HS 6 HS 7 HS 8 HS 10 HS 12 Diameter ft (m)(9) 3 (0.9) 4 (1.2) 5 (1.5) 6 (1.8) Sump Depth ft(m)(11) HydroStorm Dimensions / Capacities (8)Inner ChamberDiam. ft (m) (5)Max. Pipe in(mm)Oil Spill Volumegal (L)Sediment Volumeft3 (m3)Total Volume gal (L) 3 (0.9) 1.5 (0.45) 18 (450) 40 (155) 10 (0.35) 155 (600) 4 (1.2) 48" J G E Inlet B K F H I HF As Required 3 Inlet Elev. Outlet Elev. Inlet D 24"Outlet C H F 30" 2 (0.6) 24 (600) 95 (375) 30 (0.85) 375 (1420) 5 (1.5) 2.5 (0.8) 30 (750) 165 (635) 60 (1.8) 730 (2780) 6 (1.8) 7 (2.1) 3 (0.9) 36 (900) 270 (1030) 110 (3.2) 1265 (4800) 7 (2.1) 6.5 (2.0) 3.5 (1.0) 42 (1050) 410 (1560) 160 (4.6) 1870 (7080) 8 (2.4) 10 (3.0) 9 (2.7) 4 (1.2) 48 (1200) 615 (2330) 220 (6.2) 2630 (9960) 5 (1.5) 60 (1500) 1130 (4285) 465 (13.1) 5285 (20015) 12 (3.6) 11 (3.3) 6 (1.8) 72 (1800) 1875 (7100) 835 (23.7) 9305 (35225) Hydroworks HydroStorm PROJECT: LOCATION: NA 4.57 85 NA NA NA NA 2040 ROUTE 32, UNCASVILLE 2040 ROUTE 32 ·HYDROWORKS HYDROSTORM -THE HYDRODOME SEPARATOR SHOULD BE INSPECTED EVERY FOUR WEEKS AND AFTER EVERY LARGE STORM (OVER 0.5” (12.5 MM) OF RAIN) DURING THE CONSTRUCTION PERIOD. -INSPECT AT LEAST TWICE A YEAR. -THE MAINTENANCE FOR SEDIMENT ACCUMULATION IS REQUIRED IF THE DEPTH OF SEDIMENT IS 1FT OR GREATER IN SEPARATORS WITH STANDARD WATER (SUMP) DEPTHS. -LOOK FOR OBSTRUCTIONS IN INLETS. -CLEAN ANY FLOATING DEBRIS IN THE SEPARATOR DURING THE INSPECTION. -LOOK FOR ANY CRACKING OR DEFICIENCIES IN THE CONCRETE. ·DETENTION BASIN -MAKE SURE BASIN SURFACE IS CLEAR OF TRASH AND DEBRIS. -MOWING PERFORMED WHEN NECESSARY. -CHECK IF THERE IS EVIDENCE OF VEGETATION EROSION AND THAT VEGETATION COVERAGE IS ADEQUATE. IF NOT REPLACE VEGETATION. -MAKE SURE THAT DRAWDOWN TIMES DO NOT EXCEED 36 TO 48 HOURS. -FIRST FEW MONTHS AFTER CONSTRUCTION CHECK FOR EROSION AFTER MAJOR STORMS. -MAKE SURE OUTLET IS CLEAR OF DEBRIS. -MAKE SURE OVERFLOW SPILLWAY/EMERGENCY SPILLWAY IS CLEAR OF DEBRIS. -IF FILTER FABRIC IS EXPOSED/RIPPED REPLACE. -INSPECT AT LEAST TWICE A YEAR. -BASIN MOWED AND CLIPPINGS REMOVED. · CATCH BASIN -CLEAN AT LEAST ANNUALLY, AFTER THE SNOW AND ICE REMOVAL SEASON IS OVER AND AS SOON AS POSSIBLE BEFORE SPRING RAINFALL EVENTS. -IF A CATCH BASIN SIGNIFICANTLY EXCEEDS THIS ONE-HALF DEPTH STANDARD DURING THE ANNUAL INSPECTION, THEN IT SHOULD BE CLEANED MORE FREQUENTLY. #4 EACH WAY 1' O.C. RETAINING WALL #5 HORIZ. 1' O.C. #6 VERT. 1' O.C. #5 EACH WAY 1' O.C. FINISHED GRADE 158.0' BACKFILL W/ FREE DRAINING MATERIAL NOTE: PRIOR TO CONSTRUCTION, RETAINING WALL MUST BE DESIGNED BY A PROFESSIONAL ENGINEER AND SUBMITTED TO THE BUILDING INSPECTOR FOR HIS/HER APPROVAL. FINISHED GRADE NOT TO SCALE TOP OF WALL 164.00' SOIL EROSION AND SEDIMENT CONTROLS ALL ADJACENT PROPERTIES AND RECEIVING WATERCOURSES AND / OR WETLAND AREAS SHALL BE ADEQUATELY PROTECTED FROM SOIL EROSION AND SEDIMENTATION BOTH DURING AND AFTER CONSTRUCTION. ADDITIONAL EROSION AND SEDIMENT CONTROLS MAY BE REQUIRED BY THE TOWN AND SHALL BE INSTALLED AND MAINTAINED BY THE CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROLS BEFORE, DURING AND AFTER CONSTRUCTION. THE CONTRACTOR IS ALSO RESPONSIBLE FOR THE PROPER REMOVAL AND DISPOSAL OF ALL EROSION AND SEDIMENT CONTROLS ONCE THE SITE IS COMPLETELY STABILIZED. ALL ACCUMULATED SEDIMENTS AT ALL EROSION AND SEDIMENT CONTROLS SHALL BE PERIODICALLY REMOVED AND SPREAD IN AREAS THAT ARE NOT SUBJECT TO EROSION. ALL EROSION AND SEDIMENT CONTROLS SHALL BE INSPECTED WEEKLY AND AFTER ALL RAINFALL EVENTS. E & S CONTROLS SHALL BE REPAIRED OR REPLACED AS NECESSARY WITHIN 24 HOURS THROUGHOUT THE CONSTRUCTION DURATION. THE PERMITTEE SHALL EMPLOY BEST MANAGEMENT PRACTICES, CONSISTENT WITH THE TERMS AND CONDITIONS OF THE INLAND WETLANDS PERMIT, TO CONTROL STORMWATER DISCHARGES AND TO PREVENT EROSION AND SEDIMENTATION AND TO OTHERWISE PREVENT POLLUTION OF WETLANDS OR WATERCOURSES. THE PERMITTEE SHALL IMMEDIATELY INFORM THE TOWN WETLANDS OFFICER OF ANY PROBLEMS INVOLVING WETLANDS OR WATERCOURSES THAT HAVE DEVELOPED IN THE COURSE OF, OR THAT ARE CAUSED BY, THE AUTHORIZED WORK. THE RESPONSIBLE CONTACT PERSON FOR THE INSTALLATION AND MAINTENANCE OR EROSION AND SEDIMENTATION CONTROLS ON THIS PROJECT WILL BE THE SITE CONTRACTOR. THE CONTACT INFORMATION FOR THE CONTRACTOR WILL BE MADE AVAILABLE TO THE TOWN AS SOON AS IT IS AVAILABLE. ALL CONSTRUCTION SITE RUNOFF SHALL BE ROUTED INTERNALLY TO STORMWATER MANAGMENT AREA. SEDIMENT SHALL BE MONITORED, MAINTAINED AND REMOVED AFTER EACH STORM EVENT IN EXCESS OF 1" OF RAINFALL OR WHEN THE CAPACITY EXCEEDS 50% OF THE STORAGE VOLUME. EROSION AND SEDIMENT CONTROLS SHALL BE INSPECTED WEEKLY AND AFTER ALL RAINFALL EVENTS. E & S CONTROLS SHALL BE REPAIRED OR REPLACED AS NECESSARY WITHIN 24 HOURS THROUGHOUT THE CONSTRUCTION DURATION. TYPICAL STOCKPILE DETAIL SILT FENCE BARRIER AROUND STOCKPILE STOCKPILE EXISTING GRADE NOTE: ANY STOCKPILE THAT WILL REMAIN UNDISTURBED FOR A PERIOD LONGER THAN 30 DAYS SHALL BE SEEDED WITH A TEMPORARY GRASS SEED MIXTURE TO PREVENT EXCESSIVE EROSION AND SEDIMENTATION. SIZING WAS DONE USINGHYDROWORKS SOFTWARE. February 7, 2023 HOOD FREE STANDING SIGN NOT TO SCALE NCF 05/19/202615 REVISION CLOUDS 07/03/20233 WATER & SEWER CONNECTION 07/12/20234 TOWN PLANNER COMMENTS 07/20/20235 STAFF COMMENTS 11/21/20236 DOT COMMENTS 04/29/20247 DOT COMMENTS 06/05/20248 DOT COMMENTS 09/05/20249 DOT COMMENTS 11/04/202410 DOT COMMENTS 11/08/202411 DOT COMMENTS 12/09/202412 WATER/SEWER - DOT 03/07/202613 ADDED GREASE INTERCEPTOR 05/10/202614 COURT YARD MODIFICATION 15.1 156 160 165 156 160 165 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 PROPOSED GRADE PROPOSED FOREBAY AREA PROPOSED HYDRO-DYNAMIC SEPARATOR(SEE DETAIL ON SHEET 7 OF 8 AND SIZING REPORT) PROPOSED RIPRAP 4. 0 ' PROPOSED F.E.U. PROPOSED OUTLET STRUCTURE(SEE DETAIL AND DRAINAGE REPORT) 150 155 160 165 170 175 180 185 150 155 160 165 170 175 180 185 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 1+60 1+70 1+80 1+90 2+00 2+10 2+20 2+30 2+40 2+50 2+60 2+70 2+80 2+90 3+00 3+10 3+20 3+30 3+40 3+50 3+60 3+70 3+80 3+90 4+00 4+10 4+20 4+30 4+38 3.5' 3.5' MH STEPS RI S E R S E C T I O N CO N E S E C T I O N 12 " OUTLET STRUCTURE 15" HDPE ELEV. = 158.00' 3" ORIFICE ELEV. = 158.00' DEBRIS GRATE 4" ORIFICE ELEV. = 161.00' GRATE ELEV. = 163.50' 158 160 165 158 160 165 0+00 0+10 0+20 0+25 21-001048JOB NO.DRAWN BY:OFSHEET NO. DRAWING SCALE: AS SHOWN Prepared For: Uncasville, Connecticut 2040 New London Turnpike of Details II AMER CHOUDREY DATE REVISIONSNO. Office: (860) 536-7390 Fax: (860) 536-1644 Mailing Address: 70 Essex Street Mystic, Connecticut 06355 FEDUS ENGINEERINGCIVIL ENGINEERS LLC P: \ 2 0 2 1 \ 2 1 - 0 0 1 0 4 8 - U N C A S V I L L E - 2 0 4 0 R O U T E 3 2 - A M E R C H O U D R E Y - G A S S T A T I O N - S I T E P L A N A P P R O V A L \ A C A D \ 2 1 - 0 0 1 0 4 8 - U N C A S V I L L E - 2 0 4 0 R O U T E 3 2 - A M E R C H O U D R E Y - G A S S T A T I O N - P L A N N I N G A N D Z O N I N G - R E V . 1 5 . D W G 99 (AKA CT RT 32) Gregg T. Fedus P.E. CT. License No. 21231 Gregg T. Fedus P.E. February 7, 2023 SCALE: 1"=4' PARKING LIGHT POST DETAIL 15 . 0 ' PROPOSED FINISHED GRADE PROPOSED "RUUD" SHOEBOX LIGHTING OR EQUAL SCALE: 1"=2' PARKING LIGHT POST PIER DETAIL PROPOSED FINISHED GRADE PROPOSED LIGHTING POST PROPOSED 14" DIA. CONC. PEIR 42" BELOW FININSHED GRADE PROPOSED 14" DIA. CONC. PEIR 28" ABOVE FINISHED GRADE 3. 5 ' 4 - 12" GALVANIZED ANCHOR BOLTS (SEE MANUFACTERER'S DETAIL) 4 - VERTICAL #4 REBARS TIED WITH #2 STRAPS 18" O.C. MAXIMUMFINE $150 PARKING REQUIRED VIOLATORS WILL BE FINED STATE PERMIT HANDICAPPED 1 1/2" SQUARE POST 18 " 12" 5' - 0 " M I N I M U M 3'- 0 " FINISHED GRADE 8" ∅ CONCRETE FOOTING (SLOPE TOP OF CONCRETE) 1. EMBLEM AND LETTERING TO BE WHITE ON A BLUE BACKGROUND. 2. SIGN TO BE EMBOSSED GALVANIZED STEEL WITH BAKED ENAMEL FINISH. 3. INSTALL SIGNS IN ACCORDANCE WITH ALL APPLICABLE STATE AND LOCAL REQUIREMENTS (2001 MUTCD STANDARDS) 3. SHOP DRAWINGS REQUIRED. 4. SEE SITE DEVELOPMENT PLAN FOR LOCATION OF SIGNS. NOTES: NOT TO SCALE DETAIL OF INLET SEDIMENT CONTROL DEVICE WITH CURB DEFLECTOR BITUMINOUS CURBING DETAIL CONCRETE SIDEWALK DETAIL NOT TO SCALE ELEV.=158.10 EMERGENCY SPILL WAY ELEV.=163.75'TOP OF WALL ELEV.=164.00' T.O.W ELEV.=164.00'ELEV.=163.50' ELEV.=161.00' ELEV.=158.00' SCALE: 1"=5' CROSS SECTION A-A SCALE: 1"=20' SIGHT LINE (LOOKING NORTH FROM SITE EXIT) SCALE: 1"=2' 8.0' MIN 8.0' NOT TO SCALE VAN ACCESSIBLE HANDICAPPED PARKING STALL DETAIL 4" PAINT LINE (TYPICAL) 18 . 0 ' HANDICAP SYMBOL TO BE PAINTED IN EACH SPACE NOTE: 1.CULVERT END (FLARED END) SECTIONS SHALL CONFORM TO CONNECTICUT DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATION FORM 814A SECTION: M.08.01-22. DIMENSION TABLE DIA.A B C D E R 15"6"2'-3"3'-10"2'-6"2.25"11" 18"9"2'-3"3'-10"3'-0"2.5"12" 24"9.5"3'-7.5"2'-6"4'-0"3"14" 30"12"4'-6"1'-7.75"5'-0"3.5"15" 36"15"5'-3"2'-10.75 6'-0"4"20" 42"21"5'-3"2'-11"6'-6"4.5"22" 48"24"6'-0"2'-2"7'-0"5"22" 54"27"5'-5"2'-11"7'-6"5.5"24" 60"30"5'-0"3'-3"8'-0"6"24" PLAN ELEVATION SECTION C-C (DOUBLE SCALE) DRIVEWAY APRON & DRIVEWAY DETAIL N.T.S. 1 1/2" BITUMINOUS CONCRETE CLASS 2 (SURFACE COURSE) REMOVE BOULDERS AND LEDGE ROCK TO A DEPTH OF 12 INCHES BELOW SUBGRADE, AND REPLACE WITH ROLLED GRANULAR BASE MATERIAL. NOT TO SCALE 2 1/2" BITUMINOUS CONCRETE CLASS 1 (BINDER COURSE) 4" -1 1/4" PROCESSED AGGREGATE BASE 8" ROLLED GRANULAR (3" MINUS) BASE (GRADING A) BITUMINOUS PAVEMENT DETAIL AT PARKING LOT 9.0' MIN NOT TO SCALE PARKING STALL DETAIL 4" PAINT LINE (TYPICAL) 18 . 0 ' 3'-6" SCALE: 1"=5' CROSS SECTION B-B ELEV.=163.75 PROPOSED EMERGENCY SPILL WAY PROPOSED RIP RAP PROPOSED GRADE T.O.W. ELEV.=164.00 7% NCF 05/19/202615 REVISION CLOUDS 07/03/20233 WATER & SEWER CONNECTION 07/12/20234 TOWN PLANNER COMMENTS 07/20/20235 STAFF COMMENTS 11/21/20236 DOT COMMENTS 04/29/20247 DOT COMMENTS 06/05/20248 DOT COMMENTS 09/05/20249 DOT COMMENTS 11/04/202410 DOT COMMENTS 11/08/202411 DOT COMMENTS 12/09/202412 WATER/SEWER - DOT 03/07/202613 ADDED GREASE INTERCEPTOR 05/10/202614 COURT YARD MODIFICATION 5.1 5.2 15.1