Loading...
HomeMy WebLinkAbout23SITE5 - 2040 Rte 32 E&S Bond dated 6-22-23 and rec'd 7-10-23Proposed Gas Station and Convenience Store 6/22/2023 2040 New London Turnpike, Uncasville Erosion and Sedimentation Control Bond Unit Unit Cost Quantity Cost Silt Fence/ Haybale L.F.$6.00 740 $4,440.00 Coir Wattle Check Dam Each $750.00 2 $1,500.00 Dewatering Settling Basin Each $2,000.00 1 $2,000.00 Stockpile Protection Each $750.00 1 $750.00Anti-tracking pad Lump Sum $1,500.00 1 $1,500.00 Subtotal $10,190.00 15%Contingency $1,528.50 Total $11,718.50