HomeMy WebLinkAbout23SITE5 - 2040 Rte 32 E&S Bond dated 6-22-23 and rec'd 7-10-23Proposed Gas Station and Convenience Store 6/22/2023
2040 New London Turnpike, Uncasville
Erosion and Sedimentation
Control Bond Unit Unit Cost Quantity Cost
Silt Fence/ Haybale L.F.$6.00 740 $4,440.00
Coir Wattle Check Dam Each $750.00 2 $1,500.00
Dewatering Settling Basin Each $2,000.00 1 $2,000.00
Stockpile Protection Each $750.00 1 $750.00Anti-tracking pad Lump Sum $1,500.00 1 $1,500.00
Subtotal $10,190.00
15%Contingency $1,528.50
Total $11,718.50