Loading...
HomeMy WebLinkAboutSite Improvement Plan dated 6-9-26 & rec'd 6-11-26· · 11'11'11'11'L4 L5C6 PC 16+95.4 PC 25+42.5 PT 14+06.1 PT 18+35.6 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 MAPLE AVE CONSTRUCTION BASELINE DATA NUMBER L1 C1 C2 C3 L2 C4 L3 C5 L4 C6 L5 STARTING STATION 0+00.00 2+11.09 3+33.62 5+15.45 6+20.25 9+21.93 10+48.04 11+64.54 14+06.08 16+95.42 18+35.56 NORTHING 727621.7059 727443.2075 727335.8470 727160.2347 727072.3565 726837.1233 726752.7527 726689.0084 726535.7919 726328.5177 726235.2974 EASTING 1166525.7004 1166413.0239 1166354.1198 1166356.5826 1166413.3313 1166602.2087 1166695.2381 1166792.7478 1166978.8509 1167180.7339 1167285.2141 CURVE DATA R=1000.00' Δ 7°01'15" L=122.53' T=61.34' R=200.00' Δ 52°05'23" L=181.83' T=97.74' R=500.00' Δ 12°00'33" L=104.80' T=52.59' R=400.00' Δ 18°03'51" L=126.11' T=63.58' R=1100.00' Δ 12°34'53" L=241.54' T=121.26' R=1000.00' Δ 8°01'45" L=140.14' T=70.18' LINE DATA S32°15'43"W 211.09' S38°45'44"E 301.68' S56°49'35"E 116.50' S44°14'42"E 289.34' S52°16'28"E 706.95' ENDING STATION 2+11.09 3+33.62 5+15.45 6+20.25 9+21.93 10+48.04 11+64.54 14+06.08 16+95.42 18+35.56 25+42.51 NORTHING 727443.2075 727335.8470 727160.2347 727072.3565 726837.1233 726752.7527 726689.0084 726535.7919 726328.5177 726235.2974 725802.7280 EASTING 1166413.0239 1166354.1198 1166356.5826 1166413.3313 1166602.2087 1166695.2381 1166792.7478 1166978.8509 1167180.7339 1167285.2141 1167844.3757 PROJECT BEGIN STA 0+30 N727596.3426 E1166509.6899 11' 11'L1 L2 L3 C4 C5 C1 C3 C2 PC 9+21 . 9 PC 1 1 + 6 4. 5 PC 2 + 1 1 . 1 PT 1 0 + 4 8. 0 PT 6+20 . 2 PCC 3+33.6 PCC 5+15.4 12'12'11'11'0 +0 0 1 +0 0 2+ 00 3 + 0 0 4+0 0 5+00 6+00 7+00 8+00 9+00 10+00 11+0 0 12+0 0 13+00 CUT & MATCH PAVEMENT (TYP.)MATCHLINE (SEE BELOW )MATCHLINE (SEE ABOVE)MATCHLINE (SEE SHEET )MILL & OVERLAY 2" DEPTH FULL-DEPTH PAVEMENT REPAIR (SEE DETAIL) REPLACE EXIST. CB TOP WITH NEW TYPE "C-L" CB TOP CUT AND MATCH EXISTING DRIVEWAY (TYP.) INSTALL INLET SEDIMENT CONTROL DEVICE (TYP.) INSTALL INLET SEDIMENT CONTROL DEVICE (TYP.) CUT & MATCH PAVEMENT (TYP.) INSTALL BIT. CONC. CURB AT BACK OF CB REPLACE EXIST. CB TOP WITH NEW TYPE "C-L" DOUBLE GRATE TYPE I TOP INSTALL BIT. CONC. CURB AT BACK OF CB WIDEN ROAD TO 22-FEET BETWEEN STN. 8+50 AND STN. 10+50 (SEE PAVEMENT WIDENING DETAIL) R-B END ANCHORAGE TYPE II PER CTDOT HW-911_01 PROVIDE 444 FT. ± TYPE R-B 350 METAL BEAM GUIDERAIL. USE MULTIPLE BLOCKOUTS TO AVOID OBSTRUCTIONS PER CTDOT HW-910_02 IF REQUIRED REPLACE EXIST. CB TOP WITH NEW TYPE "C" CB TOP APPROXIMATE WETLAND 50' WETLAND UPLAND REVIEW AREA PROVIDE AND MAINTAIN 506 LF± COMPOST/WOODCHIP EROSION AND SEDIMENT CONTROL SOCK. CONSTRUCTION BASELINE MILL & OVERLAY 2" DEPTH 34" WHITE EPOXY RESIN EDGE LINE (SEE NOTE) NOTE: A 4" WIDE WHITE EPOXY RESIGN EDGE LINE SHALL BE INSTALLED ON BOTH SIDES ALONG THE LENGTH OF THE ROAD. LANE WIDTHS ARE AS INDICATED ON PLANS. EDGE LINES SHALL BE INSTALLED AT ROAD EDGE WHERE ROADWAY IS 22' WIDE. R-B END ANCHORAGE TYPE II PER CTDOT HW-911_01 24' 22' L6 C7 C8 C9 PC 25+42.5 PC 32+73.7 PT 26+47.0 PT 36+90.2 PRC 34+85.8 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 11' 12' L7 L8 L9 C10 C11 C12 PC 38+72.6 PC 4 2 + 4 4 . 4 PC 45+85.4 PT 36+90.2 PT 4 1 + 6 0 . 1 PT 44+38.0 PCC 39+72.6 36+0 0 37+0 0 38+0 0 39+0 0 40+00 41+00 42+ 0 0 43+00 44+00 45+00 46+00 188.29 MAPLE AVE CONSTRUCTION BASELINE DATA NUMBER STARTING STATION NORTHING EASTING CURVE DATA LINE DATA ENDING STATION NORTHING EASTING C7 L6 C8 C9 25+42.51 26+47.01 32+73.69 34+85.78 725802.7280 725743.2179 725413.5601 725335.8499 1167844.3757 1167930.2167 1168463.1808 1168659.3374 R=1000.00' Δ 5°59'14" L=104.50' T=52.30' R=600.00' Δ 20°15'12" L=212.09' T=107.16' R=1200.00' Δ 9°45'36" L=204.41' T=102.45' S58°15'42"E 626.68' 26+47.01 32+73.69 34+85.78 36+90.19 725743.2179 725413.5601 725335.8499 725278.3248 1167930.2167 1168463.1808 1168659.3374 1168855.2319 L7 C10 C11 L8 C12 L9 36+90.19 38+72.55 39+72.62 41+60.09 42+44.42 44+37.98 725278.3248 725212.2446 725166.9217 725014.9364 724931.8531 724759.6573 1168855.2319 1169025.2000 1169114.2327 1169214.5194 1169228.9605 1169311.8465 R=500.00' Δ 11°28'03" L=100.07' T=50.20' R=225.00' Δ 47°44'16" L=187.47' T=99.56' R=350.00' Δ 31°41'12" L=193.56' T=99.33' S68°45'18"E 182.36' S9°51'37"E 84.33' S41°32'50"E 147.40' 38+72.55 39+72.62 41+60.09 42+44.42 44+37.98 45+85.38 725212.2446 725166.9217 725014.9364 724931.8531 724759.6573 724649.3416 1169025.2000 1169114.2327 1169214.5194 1169228.9605 1169311.8465 1169409.6073 MAPLE AVE CONSTRUCTION BASELINE DATA NUMBER STARTING STATION NORTHING EASTING CURVE DATA LINE DATA ENDING STATION NORTHING EASTINGMATCHLINE (SEE SHEET )MATCHLINE (SEE SHEET BELOW)MATCHLINE (SEE ABOVE )MATCHLINE (SEE SHEET )2" MILL & OVERLAY EXISTING PAVEMENT REPLACE EXIST. CB TOP WITH NEW TYPE "C" CB TOP REPLACE EXIST. CB TOP WITH NEW TYPE "C-L" CB TOP REPLACE EXIST. CB TOP WITH NEW TYPE "C-L" CB TOP REPLACE EXIST. CB TOP WITH NEW TYPE "C" CB TOP R&D EX. 15" PIPE. INSTALL 23 L.F. NEW 15" HDPE PIPE. MATCH EXISTING INVERT ELEVATIONS. INSTALL BIT. CONC. CURB REPLACE EXIST. CB TOP WITH NEW TYPE "C" CB TOP REPLACE EXIST. CB TOP WITH NEW CAPE COD CB TOP REPLACE EXIST. CB TOP WITH NEW CAPE COD CB TOP REPLACE EXIST. CB TOP WITH NEW TYPE "C" CB TOP INSTALL BIT. CONC. CAPE COD BERM REMOVE AND DISPOSE EXISTING DRAINAGE PIPE. INSTALL 275 L.F. NEW 15" HDPE PIPE. MATCH EXISTING INVERT ELEVATIONS. REPLACE EXIST. CB TOP WITH NEW TYPE "C" CB TOP APPROXIMATE WETLAND 50' WETLAND UPLAND REVIEW AREA CONSTRUCTION BASELINE FULL-DEPTH RECLAMATION2 4PROVIDE AND MAINTAIN 280LF± COMPOST/WOODCHIP EROSION AND SEDIMENT CONTROL SOCK. FULL DEPTH RECLAMATION (MATCH EXISTING ELEVATIONS) 2" MILL & OVERLAY EXISTING PAVEMENT PROVIDE 200 FT. ± TYPE R-B 350 METAL BEAM GUIDERAIL. R-B END ANCHORAGE TYPE II PER CTDOT HW-911_01 (PARALLEL) R-B END ANCHORAGE TYPE II PER CTDOT HW-911_01 (PARALLEL) RECLAMATION NOTES: FULL-DEPTH RECLAMATION BETWEEN STATION 32+50 AND STATION 46+00 SHALL BE PERFORMED AND NEW PAVEMENT INSTALLED TO EXISTING GRADES AND ELEVATIONS. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING EXISTING GRADES AND ELEVATIONS ARE STAKED AND RECORDED PRIOR TO THE RECLAMATION PROCESS. ADJUST CB TOP TO NEW LINE AND LEVEL TF=187.3± REPLACE EXIST. CB TOP WITH NEW CB TOP TYPE 'C-L' TF=187.3± REPLACE EXIST. DOUBLE CB TOP WITH NEW TYPE 'C-L' CB DOUBLE TYPE 'I TOP' TF=186.7± REPLACE EXIST. CB TOP WITH NEW CB TOP TYPE 'C' TF=186.5± REPLACE EXIST. CB TOP WITH NEW CB TOP TYPE 'C' TF=186.0± L10 C13 C14 PC 49+92.4 PT 48+24.3 PT 51+89.6 46+00 47+00 48+00 49+00 50+00 51+00 52+00 186.45 186.18 186.29 186.41 186.63 186.86 187.08 187.30 187.60 187.69 187.37 185.57 185.82 186.07 186.32 187.07 187.08 187.17 187.83 187.87 187.16 186.78 186.82 187.66 188.29 186.89 187.45 187.14186.75 187.31 187.53 187.37 187.03GRADE BREAK 186.15 GRADE BREAK 186.98 187.45 PROJECT END STA 58+70 N723638.4928 E1170188.6026 REPLACE EXIST. CB TOP WITH NEW CB TOP TYPE 'C-L' TF=188.5± ADJUST CB TOP TO NEW LINE AND LEVEL TF=187.8± REPLACE EXIST. CB TOP WITH NEW CB TOP TYPE 'C' TF=187.8± REPLACE EXIST. CB TOP WITH NEW CB TOP TYPE 'C' TF=187.5± REPLACE EXIST. CB TOP WITH NEW CB TOP TYPE 'C' TF=187.1± REPLACE EXIST. CB TOP WITH NEW CB TOP TYPE 'C' TF=186.9± ADJUST CB TOP TO NEW LINE AND LEVEL TF=186.8± REPLACE EXIST. CB TOP WITH NEW CB TOP TYPE 'C' TF=186.7±REPLACE EXIST. CB TOP WITH NEW CB TOP TYPE 'C-M' TF=186.1± ADJUST CB TOP TO NEW LINE & LEVEL TF=185.9± L11 L12 C15 PC 54+31.0 PT 56+2 3 . 6 52+00 53+00 54+00 55+00 56+00 57+00 58+00 187.37 187.16 187.03 186.99 186.60 186.27 186.50 186.73 186.98 187.23 187.48 187.72 186.75 186.34 186.19 186.33 186.26 186.65 187.12 186.69 186.94 187.19 187.76 187.26 187.51 187.44 188.11 187.96 187.68 188.20 187.93 187.86 187.93 188.49 188.18 188.45 188.77 188.53 C13 L10 C14 L11 C15 L12 45+85.38 48+24.28 49+92.36 51+89.64 54+31.00 56+23.56 724649.3416 724459.4074 724318.4321 724151.9105 723946.9220 723800.6997 1169409.6073 1169554.1398 1169645.6633 1169751.4518 1169878.8571 1170003.0783 R=1600.00' Δ 8°33'17" L=238.89' T=119.67' R=10000.00' Δ 1°07'49" L=197.29' T=98.65' R=650.00' Δ 16°58'28" L=192.57' T=96.99' S32°59'32"E 168.08' S31°51'43"E 241.36' S48°50'11"E 276.33' 48+24.28 49+92.36 51+89.64 54+31.00 56+23.56 58+99.89 724459.4074 724318.4321 724151.9105 723946.9220 723800.6997 723618.8183 1169554.1398 1169645.6633 1169751.4518 1169878.8571 1170003.0783 1170211.1053 MAPLE AVE CONSTRUCTION BASELINE DATA NUMBER STARTING STATION NORTHING EASTING CURVE DATA LINE DATA ENDING STATION NORTHING EASTING 4" EPOXY RESIN DOUBLE YELLOW LINE (TYP.)MATCHLINE (SEE SHEET )MATCHLINE (SEE BELOW)3MATCHLINE (SEE ABOVE) PROVIDE 4' BIT. CONC. SIDEWALK TO LOWER LEVEL PARKING AREA PARALLEL RAMP (TYPE 9) PARALLEL RAMP (TYPE 9) SINGLE DIRECTION RAMP (TYPE 15) SINGLE DIRECTION RAMP (TYPE 14) REMOVE UTILITY POLE & ANCHOR (BY OTHERS) REMOVE WALK TO LOWER LEVEL PARKING AREA. LOAM & SEED DISTURBED AREA EXISTING CURB AND SIDEWALK TO REMAIN CUT AND MATCH PAVEMENT FULL DEPTH RECLAMATION (SEE PROPOSED ELEVATIONS) INSTALL 60' ± 12" HIGH CONCRETE CURBWALL AT BACK OF SIDEWALK TO RETAIN EMBANKMENT (SEE DETAIL) INSTALL BIT. CONC. DESCENDING DRIVEWAY APRON INSTALL BIT. CONC. DESCENDING DRIVEWAY APRON RELOCATE SIGN 18" WIDE WHITE EPOXY RESIN CROSSWALK MARKINGS (6-FT. LONG) INSTALL BIT. CONC. DESCENDING DRIVEWAY APRON INSTALL BIT. CONC. DESCENDING DRIVEWAY APRON SINGLE DIRECTION RAMP (TYPE 14) MONOLITHICALLY POURED CONCRETE CURB AT BACK OF SIDEWALK 18" WIDE WHITE EPOXY RESIN CROSSWALK MARKINGS (6-FT. LONG) 12" WIDE WHITE EPOXY RESIN STOP BAR 12" WIDE WHITE EPOXY RESIN STOP BAR 12" WIDE WHITE EPOXY RESIN STOP BAR 12" WIDE WHITE EPOXY RESIN STOP BARNEW CONCRETE WALK TO EXISTING STEPS FULL DEPTH RECLAMATION (MATCH EXISTING ELEVATIONS) INSTALL BIT. CONC. CURB INSTALL BIT. CONC. CURB & SIDEWALK REMOVE UTILITY POLE & ANCHOR (BY OTHERS) LEFT TRAVEL LANE BL CONSTRUCTION TYPICAL CROWNED SECTION SEE ROAD REHABILITATION NOTE FOR LIMITS (FULL-DEPTH RECLAMATION) SCALE: 1" = 2' VARIES (11' MIN.) PGL & CROWN LINE EXISTING SUB GRADE 2" BITUMINOUS CONCRETE HMA S0.375 SURFACE COURSE 2" BITUMINOUS CONCRETE HMA S0.5 BINDER COURSE COLD RECLAIM EXISTING PAVEMENT TO A MINIMUM DEPTH OF 12". RECLAIMED MATERIAL SHALL MEET THE REQUIREMENTS OF ARTICLE M.05.01 OF DOT 819 SPECIFICATION. REGRADE & COMPACT REMAINING MATERIAL. RIGHT TRAVEL LANE VARIES (11' MIN.) VARIES (SEE PLANS)VARIES (SEE PLANS) LEFT TRAVEL LANE BL CONSTRUCTION VARIES (11' MIN.) PGL & CROWN LINE EXISTING SUB GRADE 2" BITUMINOUS CONCRETE HMA S0.375 SURFACE COURSE 2" BITUMINOUS CONCRETE HMA S0.5 BINDER COURSE COLD RECLAIM EXISTING PAVEMENT TO A MINIMUM DEPTH OF 12". RECLAIMED MATERIAL SHALL MEET THE REQUIREMENTS OF ARTICLE M.05.01 OF DOT 819 SPECIFICATION. REGRADE & COMPACT REMAINING MATERIAL. RIGHT TRAVEL LANE VARIES (11' MIN.) VARIES (SEE PLANS)VARIES (SEE PLANS) TYPICAL SUPER-ELEVATED SECTION SEE ROAD REHABILITATION NOTE FOR LIMITS (FULL-DEPTH RECLAMATION) SCALE: 1" = 2' BITUMINOUS CONCRETE BERM HMA S0.375 WHERE DIRECTED RESIDENTIAL MAILBOX 6"3.5'3.0'2.0'4" x 4" SQUARE TREATED TIMBER POST RECLAIMED BASE MATERIAL GRADATION Square Mesh Sieve Size % Passing by Mass 2½ inches (63 mm)100 2 inches (50 mm)95 - 100 ¾ inch (19 mm)50 - 75 ¼ inch (6.3 mm)25 - 45 #40 (425 µm)5 - 20 #100 (150 µm)2 - 12 NOTES: 1. PROVIDE CONTINUOUS TACK COAT ALONG EDGE WHEN MATCHING EXISTING PAVEMENT. 1.0'3.0' (MIN)3.0'3.0'6"1.5' RESIDENTIAL MAILBOX FACE OF CURB BACK OF CURB4.5' (NOMINAL)3.0'1.5' NOTE: 1.CONTRACTOR SHALL PROTECT EXCAVATIONS BY SHORING, BRACING, SHEET PILING, UNDERPINNING OR OTHER METHODS TO PREVENT CAVE-IN OR LOOSE SOIL FROM FALLING INTO THE EXCAVATION AND DAMAGING THE WORK OR ADJACENT STRUCTURES AND UTILITIES. ROAD REHABILITATION NOTES: ·STN. 0+30 TO STN. 32+50 - 2" MILL AND OVERLAY. ·STN. 32+50 TO STN. 47+00 - FULL-DEPTH RECLAMATION (MATCH EXISTING ELEVATIONS). ·STN. 47+00 TO STN. 50+50 - FULL-DEPTH RECLAMATION (SUPER-ELEVATED SECTION TO ELEVATIONS ON PLAN) ·STN. 50+50 TO STN. 51+00 - FULL-DEPTH RECLAMATION (TRANSITION FROM SUPER-ELEVATED SECTION TO CROWNED SECTION TO ELEVATIONS ON PLAN) ·STN. 51+00 TO STN. 53+50 - FULL-DEPTH RECLAMATION (CROWNED SECTION TO ELEVATIONS ON PLAN) ·STN. 53+50 TO STN. 54+25 - FULL-DEPTH RECLAMATION (TRANSITION FROM CROWNED SECTION TO SUPER-ELEVATED SECTION TO ELEVATIONS ON PLAN) ·STN. 54+25 TO STN. 56+50 - FULL DEPTH RECLAMATION (SUPER-ELEVATED SECTION TO ELEVATIONS ON PLAN) ·STN. 56+50 TO STN. 57+25 - FULL-DEPTH RECLAMATION (TRANSITION FROM SUPER-ELEVATED SECTION TO CROWNED SECTION TO ELEVATIONS ON PLAN) ·STN. 57+25 TO STN. 58+70 - FULL-DEPTH RECLAMATION (CROWNED SECTION TO ELEVATIONS ON PLAN) CATCH BASIN REPLACEMENT NOTES: 1.CATCH BASIN TYPE 'C' AND 'C-L' TOPS SHALL BE IN ACCORDANCE WITH CTDOT STANDARD DETAIL HW-0586-07A FOR SINGLE CATCH BASINS AND HW-0586-07B FOR DOUBLE CATCH BASINS. 2.CATCH BASIN TYPE 'C-M' TOPS SHALL BE IN ACCORDANCE WITH CTDOT STANDARD DETAIL HW-586_07D. 3.FRAMES AND GRATES SHALL BE GALVANIZED STEEL TYPE 'A' IN ACCORDANCE WITH CTDOT STANDARD DETAIL HW-586-08.