HomeMy WebLinkAbout26 SITE 3 - Control SheetCONTROL SHEET
Application Number: 26 SITE 3
Project Name: 061-002-000 Noble Hill Road – Mitigation of Unpermitted Removal of Earth
Products
Date Received in Office: 04/2/2026
Date Received by Commission (must be within 35 days of application receipt): 4/28/2026
Terminal Date for Decision 7/2/26
Extension Granted: ☐Yes ☒No
Inland Wetlands ☒Yes ☐No Date approved: 8-21-25
ZBA – N/A Date approved: __________
Public Hearing Information: Public Hearing Required: ☐Yes ☒No
Staff Referrals: 1st–Initial App/2nd–REV App Date Sent-1st: - Date Sent-2nd: Date Sent-3rd: Date Rec’d-1st: - Date Rec’d-2nd: Date Rec’d-3rd:
Town Engineer (CLA) 4-2-26 4-17-26
Building 4-2-26 4-20-16
Fire Marshal 4-2-26 4-6-26
Uncas Health 4-2-26 4-10-26
WPCA 4-2-26 4-6-26
PD 4-2-26 4-6-26
Public Works 4-2-26 4-20-26
Commission Actions: ☒ Approved ☐ Denied ☐ Modified
Commission Decision on 04/28/2026
Conditions of Approvals ☒Yes ☐No
CONDITIONS:
1. This approval is for the specific use identified in the application. Any change in the nature of use, site or addition of structure(s) will require new approvals from the Planning and Zoning Commission. 2. This project shall be constructed and maintained in accordance with the referenced plans. 3. Soil erosion and sediment controls shall be installed in accordance with the approved
plan set and inspected by the Zoning Officer prior to the start of any work. 4. An approved Zoning Permit is required prior to the start of any work. 5. By acceptance of this permit and conditions, the applicant and owner acknowledge the right of Town staff to periodically enter upon the subject property for the purpose of determining compliance with the terms of this approval.
6. No use under this permit/approval shall be initiated until a Certificate of Zoning Compliance is approved by the Zoning Officer. Site Specific Conditions:
7. All drainage structures proposed for the project shall be constructed and maintained post construction in accordance with the approved Plan Set.
8. All landscaping shall be maintained post construction. Conditions to be met prior to signing of plans:
CONTROL SHEET
9. Plans shall be revised to address the Town Engineer’s comments dated 4/17/26. The
revised plans shall be reviewed and approved by the Town Engineer. a. The proposed topsoil thickness should be specified for the disturbed non-wetland soil areas. b. Temporary erosion control blanket, hydroseed with bonded fiber matrix, or equal
should be provided on the finished slopes that are steeper than 3:1.
10. All plans submitted for signature shall bear the seal and live signature of the appropriate professional(s) responsible for the preparation of the plans. 11. The applicant shall also submit final plans as approved by the Commission in a digital format per ZR section 17.3.
12. A list outlining how the conditions of approval have been met shall be submitted along
with final plans submitted for signature. 13. A list outlining all changes to the plans shall be submitted along with final plans submitted for signature. The list should cite the sheet number where each change has been made.
Conditions to be met prior to the issuance of zoning permits:
14. Four (4) sets of paper plans with any required revisions incorporated, shall be submitted to the Land Use Department for signature of the Commission. 15. Any required certificates and/or approvals from State or Federal agencies (i.e. CT-DOT, DEEP, Army Corps of Engineers) shall be obtained by the applicant and submitted to the Land Use & Development Office. Any changes to the plans required by such entities may
require a plan modification from the Planning and Zoning Commission. 16. No bond, or portion thereof, shall be released without prior approval of the Zoning Officer and/or Director of Land Use & Development. 17. A pre-construction meeting between the applicant, site contractors, project engineer and Town Staff shall be held.
Conditions which must be met prior to Issuance of a Certificate of Zoning Compliance:
18. Complete as-built plans certified to Class A-2 accuracy shall be submitted prior to the issuance of any certificate of zoning compliance. The as-built plan shall also contain a certification by a Professional Engineer that they have inspected the site improvements
and that they have been installed in accordance with the approved plans. Any deviations
or omissions must be noted. 19. No Certificate of Occupancy or other final approval may be issued until the Zoning Officer has signed off on the final work. Note: The Conditions of Approval do not take the place of other requirements found in the Town
Codes, Regulations, and Application Instructions.
Notice of Decision
Legal Notice sent to The Day on _04/30/2026_ to be published on _05/01/2026_
Notice of Decision posted on the town website on _04/30/2026_
Notice of Decision sent to applicant: 04/30/2026
CLA Invoices Date: Invoice Number: Amount: Invoice Sent to App Payment Rec’d
05/01/26 CL-24-7873J $170 n/a n/a
CONTROL SHEET
Documents: 1. Application dated 3-30-26 rec’d 4-2-26 2. Authorization dated 3-30-26 rec’d 4-2-26
3. Narrative rec’d 4-2-26
4. Abutters rec’d 4-2-26 5. Checklist rec’d 4-2-26 6. Site Plans dated 5-12-25, revised 3-20-26 7. PD Comments 1 dated 4-3-26, rec’d 4-6-26
8. WPCA Comments 1 dated and rec’d 4-6-26
9. FM Comments 1 dated and rec’d 4-6-26 10. Referral Letter to the Town of Bozrah dated 4-6-26 11. UH Comments 1 dated and rec’d 4-10-26 12. TE Comments 1 dated and rec’d 4-17-26
13. BLDG Comments 1 dated and rec’d 4-20-26
14. PW Comments 1 dated and rec’d 04-20-26 15. Staff Report 1 dated and rec’d 04-22-26 16. NOD to be published in The Day 5-1-26 17. Certification Letter of NOD 4-30-26
18. The Day Proof for NOD 04-30-26
19. The Day Tear Sheet dated and rec’d 5-1-26