HomeMy WebLinkAbout26 SITE 3 - Zoning Permit APP Rev 01-29-2024H:\APPLICATION FORMS\Zoning Permit APP Rev 01-29-2024.doc
Address: __Noble Hill Road__________________________________ Zoning Permit # _____________________
Parcel ID: _061-002-000__________ Zone: _R-120_____ Expiration date: _____________________
Setbacks: Front/Rear: __60'_______Sides: __25'_______
Town of Montville Zoning Permit
Proposed Project: __Mitigation of the unpermitted removal of earth products_________________________________
Property Owner: __Jeffrey Phillips and Jennifer Michaels_______________________________________________
Applicant: _______________________________________________________________________________________
Applicant Address: __193 Noble Hill Road, Oakdale, Connecticut 06370_____________________________________
Phone #_860-608-3827__________________________ Cell # ____________________________________________
Email: ___jeff.phillips8733@icloud.com______________________________________________________________
Provide the following: Copy of plans drawn to scale of at least 1" = 40’ showing: dimensions of lot, size and location of existing, proposed structures, driveways, sanitary facilities and water supply, parking facilities, and adjacent streets; distances of proposed structures from property lines and wetlands. (A copy of plan prepared by a Connecticut Registered Land Surveyor may be required).
The Owner/Agent is responsible for and agrees to: 1.Notify the Zoning Officer of any alteration in the plans.2.An E&S cash bond of $2000 may be required and must be posted prior to approval of Zoning Permit. This bond may be heldfor up to one (1) year after Compliance Sign-off.3.Prior to start of construction all E&S measures must be inspected by the Zoning Officer.4.Contact the Zoning Officer (860-848-6779) upon completion of project.
I hereby certify that the information provided is true and correct and further attest the proposed project is authorized by the owner in fee and I am authorized to make application for a permit for such described work. The undersigned hereby authorizes the Montville Planning & Zoning Commission or its agents to enter the subject property for the purposes of inspection and/or enforcement.
Owner/Agent Signature: __________________________________________Date:____________________________
Applicant Signature: _____________________________________________Date:___________________________
OFFICE USE ONLY Fee: __N/A__________ Cash / Check # _Included w/26 SITE 3___________
______________ ___________________________________ _______________ Commission Agent Date Certificate of Zoning Compliance (CZC) Date
□As Built required prior to issuance of CZC. Received on:_______________________________________________□Bond # & Date ______________________________________Released:____________________________________ Site/Special Permit #_26 SITE 3 (Approved 4/28/2026)___________________________________________________ Wetlands Permit #_25 IWC 14 (Approved 8/21/2025)____________________________________________________ Conditions & Notes: Applicant shall notify ZEO once required E&S Controls have been installed for an inspection prior
to the start of any work. All E&S Controls shall be maintained throughout the duration of the project. ZEO is to be
notified when construction is scheduled to begin for inspections throughout. Any changes must be discussed with ZEO prior to implementation. A final inspection for the issuance of a CZC will be completed by ZEO upon presentation of an As-Built certified to Class A-2 accuracy, pursuant to the Conditions of Approval, and a certification from the Engineer of Record shall also be presented certifying that the work has been completed in accordance with the approved Plan. All
outstanding invoices for reimbursement to the Town of Montville shall be paid in full prior to the issuance of a final CZC.