Loading...
HomeMy WebLinkAbout25SITE2 - WPCA comments 03-21-2025Memorandum Date: 3/21/2025 Project No.: 13848C To: Ronald McDaniel, Montville WPCA Administrator Derek Albertson, Montville WPCA Superintendent From: Mariusz Jedrychowski, PE Joe Hausman, PE Tim Henry Subject: Water and Sewer Utility Plans Review for 145 Route 32 The Montville WPCA has requested that Wright-Pierce assist in the review of the updated water and sewer utility components of a proposed development. We received the following response documents for “Madison Place Luxury Townhouse” development (Madison Place development) at 145 Route 32 in Montville prepared by Fuller Engineering & Land Surveying, LLC for JNE Holdings, LLC:  Utility Plan (C-3.2) dated 3/20/2024  Utility Details (C-6.2 and C-6.3) both dated 3/20/2024  Sanitary Sewer & Water System Calculations dated 3/18/2025  Response to Comments Document dated 3/18/2025 This memorandum is a summary of our updated review and comments. Water System Comments The proposed 12”x2” water service connection includes a connection to the exiting water main on Powerhouse Road with a tapping sleeve, gate valve and valve box. The proposed 2” water service line runs north from the proposed Powerhouse Road connection, then branches off in two different directions to serve each side of the development complex without looping. There is a single proposed service connection to each of the 11 townhouses on site, each with its own isolation valve and water meter. Our review checked for adherence to the Town of Montville Water Pollution Control Authority Specifications for the Installation of Watermains and Appurtenances (WPCA Specifications). Based on this review we have the following comments: 1. Response: All comments from the current Fire Marshal have been addressed under previous comment responses. – Please provide responses from Fire Marshal. We do not have record of this. Sanitary Sewer Comments The proposed sewer connection includes a PVC at a 3.4% slope from the connecting sanitary sewer manhole located on Powerhouse Road. It is assumed that the sewers located on the developed parcel will be privately owned and maintained. 1. Response: Sanitary sewer pipe sizes have been added to Sheet C-3.2 indicating 4” PVC laterals and a 6” PVC main. – Please provide sanitary pipe sizes on plan sheet C-3.2. They have not been added on sheet C- 3.2. Memo: Water and Sewer Utility Plans Review for 145 Route 32 2 of 2 2. Response: No ground water was identified to 14 feet within the additional test pit areas within the infiltrations system. It is our opinion the proximity of the sanitary main should not be of concern. a. We agree that long term infiltration will not cause issues for the sewer main, as the main will be at higher elevation than the infiltration basins, according to the provided plans. b. However, this poses the reverse issue: in the event of sewer main leaks, water from the main can enter and interact with the infiltration basins. We recommend a liner be placed around the infiltration basins to mitigate this issue, but defer to Montville WPCA to make this decision.