HomeMy WebLinkAbout25SITE2 - Applicant Response to Comments 03-31-2025FULLER ENGINEERING & LAND SURVEYING, LLC
525 John Street – Second Floor – Bridgeport, CT 06604
Phone: (203) 333-9465 Fax: (203) 336-1769
The Quill Group
Fuller Engineering & Land Surveying, LLC Civil Engineering, Landscape Architecture, Surveying
Atlantic Consulting & Engineering, LLC Geotechnical, Structural, Mechanical, Electrical, & Plumbing
Fairfield Testing Laboratories, LLC Materials Testing, Inspection, & Certifications, Special Inspections
P a g e | 1
27 March 2025
Mrs. Meredith Badalucca
Assistant Planner
Town of Montville
RE: Response to Comments
Madison Place, Luxury Townhouse Development
145 Route 32 & 18 Powerhouse Road
Montville, Connecticut
The following are our responses to comments from the Wright-Pierce. Our responses are designated in
bold and italics. Engineers, Inc.
Technical Review by Wright-Pierce dated 3/24/2025
Plans
1. The site grading overall doesn’t appear to account for curbing and may need to be adjusted.
Response: Adjustments for curbing have been added to the grading plan.
2. The 104 and 103 contour east of Unit 8 and the 102 contour at the Powerhouse Road driveway
don’t connect to existing contours. The 102 contour ends off the property. The grading should
be revised.
Response: Grading has been revised.
3. Call-outs for the subsurface stormwater retention systems sizing and inverts don’t correspond
to what is depicted on the plans or in the calculations and should be coordinated.
Response: The revised stormwater system has been coordinated between the report and
plans.
4. Clean-outs are recommended at each end of each row of the subsurface stormwater retention
systems.
Response: Cleanouts have been added.
The Quill Group
Fuller Engineering & Land Surveying, LLC Civil Engineering, Landscape Architecture, Surveying
Atlantic Consulting & Engineering, LLC Geotechnical, Structural, Mechanical, Electrical, & Plumbing
Fairfield Testing Laboratories, LLC Materials Testing, Inspection, & Certifications, Special Inspections
P a g e | 2
5. The grading and drainage plan should note that all roof leaders shall be piped to the subsurface
drainage system (similar to note 15 on the utility plan.
Response: The design of the stormwater system does not include (or require) all of the
roof areas to be routed to the infiltration system. Those roof areas routed to the
infiltration system have been noted on Sheet C-3.1 and is graphically depicted on the DA-
PR sketch included with the drainage report materials.
6. A photometric plan showing that light from the development won’t impact neighboring
properties should be provided.
Response: A photometric plan has been generated on Sheet C-5.1. The sheet has been
renamed Landscape & Lighting Plan.
Off-site light levels are minimal since the proposed building units directly shield the light
source from the neighboring properties.
Additionally, the 6’ht stockade fence and southern buffer plantings provide further
screening of the low-level patio and front entrance light fixtures.
Engineering Report
1. The watershed map provided does not appear to be accurate. The existing condition mapping
depicts one watershed; there appears to be at least two watersheds for the properties (one
flowing west toward Route 32 and one flowing east toward the neighboring properties.) The
watershed mapping should be revised to accurately reflect the existing condition.
Response: Both DA-EX and DA-PR have been modified to reflect the additional watersheds.
Additional references have been added to reflect the drainage calculations in the
Engineering Report.
2. The post development calculations are split into two phases, watershed mapping for the two
phases should be provided.
Response: The drainage report has been revised to analyze the site based on the two
drainage basins. As such, Phase 1 and Phase 2 has been modeled as a combined system
with each galley system (Ponds 1P and 2P). The watershed mapping has been modified to
indicate Drainage Basins ‘A’ and ‘B’ .
3. The existing condition watershed area used in the calculations does not correspond to the
watershed mapping.
The watershed maps and analysis have been revised:
4. The existing condition (pre-development) stormwater flow rates and volumes leaving each
watershed should be the basis for comparison for the post development stormwater flow rates
and volumes. These existing condition baseline rates and volumes should not change with each
phase of the development.
See response 2 above.
The Quill Group
Fuller Engineering & Land Surveying, LLC Civil Engineering, Landscape Architecture, Surveying
Atlantic Consulting & Engineering, LLC Geotechnical, Structural, Mechanical, Electrical, & Plumbing
Fairfield Testing Laboratories, LLC Materials Testing, Inspection, & Certifications, Special Inspections
P a g e | 3
5. A comparison between the existing and post development runoff volume should be provided. A
comparison of rates has been included, but not the volume. The Engineer should address if
there is an increase in runoff volume from the development and potential impacts to
downstream properties.
Please see the revised Engineering Report.
6. The post development Phase 2 & 3 calculations don’t appear to include or account for Phase 1
of the development.
Please see the revised Engineering Report.
7. A direct comparison between the pre-development and post-development (full buildout) peak
flow rates and runoff volumes should be provided for each watershed.
Please see the revised Engineering Report.
8. The Engineer should demonstrate that the CTDEEP Water Quality Volume requirements are met
with the reduced subsurface stormwater retention system.
Please see the revised Engineering Report.
9. Pipe capacities were stated for the drainage piping at less than the 1% slop in the calculations.
The 8” and 10” diameter piping may be prone to clogging; larger diameter piping should be
considered if feasible.
Pipe pitches have been increased throughout are anticipated to function as designed.