Loading...
HomeMy WebLinkAbout25SITE2 Site Plan Revised 2024-04-16_Part1Uncasville C-0 COVER SHEET MADISON PLACE LUXURY TOWNHOUSE DEVELOPMENT 18 POWERHOUSE ROAD & 145 CONNECTICUT ROUTE 32) MONTVILLE, CONNECTICUT DRAWING LIST SHEET NAME COVER SHEET IMPROVEMENT LOCATION & TOPOGRAPHIC PLAN PROPOSED SITE PLAN PHASING PLAN & FIRE ACCESS GRADING AND DRAINAGE PLAN PROPOSED UTILITY PLAN SOIL EROSION & SEDIMENT CONTROL PLAN SOIL EROSION & SEDIMENT CONTROL NOTES & DETAILS LANDSCAPE & LIGHTING PLAN DETAIL SHEET DETAIL SHEET DETAIL SHEET SHEET NO. C-0 PLAN DATE LATEST REVISION SITE/CIVIL DRAWINGS C-2.1 C-3.1 C-4.1 C-4.2 C-5.1 C-6.1 C-6.2 OWNER / APPLICANT ARCHITECTURAL DRAWINGSFOUNDATION & FIRST FLOOR PLAN1 4 OVERVIEWS C-6.3 Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 3/20/24 FE24-1889 THIS DRAWING IS THE PROPERTY OFTHE ENGINEER. IT HAS BEENSPECIFICALLY PREPARED FOR THEOWNER FOR THIS PROJECT AT THIS SITEAND IS NOT TO BE USED FOR ANYOTHER PURPOSE, LOCATION OR OWNERWITHOUT WRITTEN CONSENT OF THEENGINEER.PREPARED FOR18 POWERHOUSE ROAD LUXURY TOWNHOUSE DEVELOPMENTD.R.R.J.E.Q.JNE HOLDINGS, LLC525 JOHN STREET BRIDGEPORT, CT. 06604Office (203) 333-9465fax (203) 336-1769e-mail Info@FullerSurveyors MONTVILLE, CONNECTICUTAPPROVED BY THE MONTVILLE PLANNING AND ZONING COMMISSION CHAIRMAN DATE MADISON PLACEO:\Fuller CAD Files\CT\Bridgeport\Benson Terrace\#26 - FE13-1101 - Fox\Survey Data\2013 09 10 FE 13-1100 FOX 26BENSON TERR\LOCATION.crd4/17/2025 9:29 AMStaff Review 01/15/25 APPROVED BY THE MONTVILLE INLAND WETLAND COMMISSION CHAIRMAN DATE EXPIRATION DATE SEC PLAN APPROVAL DATE Submission 02/11/25 Staff Comments 02/21/25 Staff Comments 03/07/25 Staff Comments 03/18/25 Staff Comments 03/31/25 Staff Comments 04/16/25 JNE HOLDINGS, LLC 338 Westport Road Wilton, CT 02/11/25SECOND FLOOR AND THIRD FLOOR PLAN2 3 ELEVATIONS R-20 / RT 32 OZ DISTRICT C-3.2 02/11/25 02/11/25 02/11/25 02/11/25 02/11/25 02/11/25 02/11/25 02/11/25 02/11/25 02/11/25 MAP 70 LOT 034-000MAP 70 LOT 030-000 SITE 03/10/22 02/11/2503/10/22 02/11/2503/10/22 02/11/2503/10/22 02/02/22 04/16/25 04/16/25 04/16/25 04/16/25 04/16/25 04/16/25 04/16/25 04/16/25 04/16/25 04/16/25 04/16/25 C-2.2 02/11/25 04/16/25 R20 LI R-20-M I LI C1 R20 C1 R-20-M 1.THIS PLAN IS FOR THE PROPOSED CONDOMINIUM BUILDINGS WITH PARKING CONSTRUCTION, SITEUTILITIES, AND MISCELLANEOUS LANDSCAPING. THIS PLAN IS NOT TO BE USED AS A SITE ORCONSTRUCTION PLAN. ADDITIONAL DESIGN AND DETAILS REQUIRED FOR BIDDING AND CONSTRUCTION. 2. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OFCONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 3. THE CONTRACTOR SHALL LOCATE AND VERIFY THE SIZE, LOCATION, DEPTH AND INVERTS OF ANY AND ALLEXISTING UTILITIES PRIOR TO COMMENCING OPERATIONS. THE CONTRACTOR SHALL ALSO BE REQUIREDTO CONTACT THE ZONING DEPARTMENT, FIRE MARSHALL, AND THE TOLL FREE "CALL-BEFORE-YOU-DIG"PHONE NUMBER AT 1-800-922-4455. 4. THE PROPOSED DEVELOPMENT SHOWN HEREON REQUIRE REVIEW AND APPROVAL BY THE PLANNING ANDZONING COMMISSION. 5. ALL WORK PERFORMED BY THE OWNER / DEVELOPER MUST INCLUDE IMPLEMENTATION OF ANAPPROVED SOIL EROSION AND SEDIMENTATION PLAN. SEE SHEET C-4.1 AND C-4.2. 6. RESTORE ALL DISTURBED AREAS WITH A MINIMUM OF FOUR (4") INCHES OF TOPSOIL, SEED, AND HAYMULCH UPON COMPLETION OF CONSTRUCTION. 7. LOT SERVED BY TOWN SEWER SYSTEM AND PUBLIC WATER SUPPLY. 8. THIS SITE IS NOT WITHIN A FEMA FLOOD HAZARD ZONE PER FEMA MAP 09011C0361J EFFECTIVE DATE 8/5/2013. 9. CLEARING LIMIT LINE SHALL BE ESTABLISHED PRIOR TO ANY SITE WORK ACTIVITIES. 10. LOT IS CONSIDERED A "PASS-THRU" LOT WITH FRONTAGE DESIGNATED ON ROUTE 32. NOTES: MAP REFERENCES: A. "ZONING IMPROVEMENT LOCATION AND TOPOGRAPHIC SURVEY", DATED 7 JANUARY 2022, SCALE 1"=20', BYFULLER ENGINEERING AND LAND SURVEYING, LLC. C-2.1 Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 3/20/24 FE24-1889 THIS DRAWING IS THE PROPERTY OFTHE ENGINEER. IT HAS BEENSPECIFICALLY PREPARED FOR THEOWNER FOR THIS PROJECT AT THIS SITEAND IS NOT TO BE USED FOR ANYOTHER PURPOSE, LOCATION OR OWNERWITHOUT WRITTEN CONSENT OF THEENGINEER.PREPARED FOR18 POWERHOUSE ROAD LUXURY TOWNHOUSE DEVELOPMENTD.R.R.J.E.Q.JNE HOLDINGS, LLC525 JOHN STREET BRIDGEPORT, CT. 06604Office (203) 333-9465fax (203) 336-1769e-mail Info@FullerSurveyors MONTVILLE, CONNECTICUTAPPROVED BY THE MONTVILLE PLANNING AND ZONING COMMISSION CHAIRMAN DATE MADISON PLACE4/17/2025 10:09 AMStaff Review 01/15/25 APPROVED BY THE MONTVILLE INLAND WETLAND COMMISSION CHAIRMAN DATE EXPIRATION DATE SEC PLAN APPROVAL DATE Submission 02/11/25 Staff Comments 02/21/25 Staff Comments 03/07/25 Staff Comments 03/18/25 Staff Comments 03/31/25 Staff Comments 04/16/25 A CONNDOT #SIZES(IN)SUPPORTS 30"131-0552 CONNDOT #SIZES(IN)SUPPORTS SIGN LEGEND CONNDOT #SIZES(IN)SUPPORTS 12"x18"12"x6"1 C RESERVEDPARKING ACCESSIBLEVAN WILL BE FINEDVIOLATORS MININIMUM $150 B CONNDOT #SIZES(IN)SUPPORTS 1 CONNDOT #SIZES(IN)SUPPORTS DONOTENTER 18"x24'' ZONING COMPLIANCE TABLENORWICH NEW LONDON TNPK( ROUTE 32)POWERHOUSE ROAD TP-102-24 TP-103-24 TP-104-24 TP-105-24TP-101-24 SAN SAN W W 10'MinNORWICH NEW LONDON TNPK( ROUTE 32)POWERHOUSE ROAD TP-102-24 TP-103-24 TP-104-24 TP-105-24TP-101-24 S89° 19' 57"E209.60' N12° 39' 51"W26.05' N81° 25' 04"E22.02' N86° 44' 09"E77.11' N85° 46' 43"E133.88' S87° 08' 25"W318.77'N5° 19' 45"E181.60'S2° 42' 52"E290.04'S83° 45' 01"W189.00'N1° 59' 22"W102.57'N86° 51' 45"E43.13' EXISTING CURBCUT TO REMAIN 1 24' (Typ)2 3 5 6 7 8910 20'25.0'20.0'56.4'58.3'EMERGENCYENTRANCE ONLY 1 CARGARAGE (2) SPACES 1 CARGARAGE 1 CARGARAGE 1 CARGARAGE 1 CARGARAGE 1 CARGARAGE (2) SPACES24' (Typ) Proposed 12x12Patio Proposed 6'x6.5'Covered Porch Extg. Steps andWalk to be Removed PLANTINGAREA (TYP) 5' W CONC. COVEREDENTRANCE PAD (TYP) PROPOSED STOPSIGNAND 12" WHITE PAINTEDSTOP BAR PROPOSED WHITEPAINTED CROSS WALK A B BIT. CONC.PAVEMENT(TYP)SUBSURFACEINFILTRATIONSYSTEM REMOVABLE BARRIER- USE DURINGEMERGENCY ONLY PROPOSED METERBANK (TYP) CB (TYP) C PROPOSED VANACCESSIBLE SPACE B B 25.0' 12.0'20.0'4 40.0'14.0'20.0'28.1'12.0'12.0'25.0'40.0' 20.0'12.0'12.0'25.0'13.4'13.4'29.2' 38.8'20'20'40.0'11 73.2' 80.3' Proposed 6' HtStockade Fence Proposed 6' HtStockade Fence Proposed 6' HtStockade Fence 1 CARGARAGE (2) SPACES (2) SPACES (2) SPACES 1 CARGARAGE 1 CARGARAGE SUBSURFACEINFILTRATIONSYSTEM PROPOSED LEVELSPREADER PROPOSED TRANSFORMERw/PROTECTION BOLLARDS(TYP) PROPOSED 10x15REFUSE ENCLOSUREw/CONC. PAD ANDSTOCKADE FENCE 12.0' 1 CARGARAGE 1 CARGARAGE 1 CARGARAGE (3) SPACES(1)SPACE (1)SPACE (1)SPACE (1)SPACE 20'20' 10'22'22'18'9'8'8'18'(2) SPACES(2) SPACES1 CARGARAGE1 CARGARAGE1 CARGARAGE1 CARGARAGEProposed RemovableBarrier (EmergencyUse Only) DO NOT ENTERSIGN DO NOT ENTERSIGN HOUSE TYPE WITHFRONTGE TOROUTE 32 21.6'20.1'99.9' 94.7' Footprint = 3250 s.f. Footprint = 1,382 s.f. Footprint = 5,114 s.f. Footprint = 1,536 s.f. Footprint = 5,120 s.f. Extg . Well to beAbandoned PerHealth DistrictRequirements 1 8 ' ( T y p ) EXTG. WELL TO BEABANDONED PERHEALTH DISTRICTREQUIREMENTS EXTG. WELL TO BEABANDONED PERHEALTH DISTRICTREQUIREMENTS BIT. CONC.CURB (TYP) BIT. CONC.CURB (TYP) BIT. CONC.CURB (TYP) 9' AD CB CBCBCB CB CB T T T STONE ENTRANCEPILLARS C-2.2 PHASING PLAN&FIRE ACCESS Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 3/20/24 FE24-1889 THIS DRAWING IS THE PROPERTY OFTHE ENGINEER. IT HAS BEENSPECIFICALLY PREPARED FOR THEOWNER FOR THIS PROJECT AT THIS SITEAND IS NOT TO BE USED FOR ANYOTHER PURPOSE, LOCATION OR OWNERWITHOUT WRITTEN CONSENT OF THEENGINEER.PREPARED FOR18 POWERHOUSE ROAD LUXURY TOWNHOUSE DEVELOPMENTD.R.R.J.E.Q.JNE HOLDINGS, LLC525 JOHN STREET BRIDGEPORT, CT. 06604Office (203) 333-9465fax (203) 336-1769e-mail Info@FullerSurveyors MONTVILLE, CONNECTICUTAPPROVED BY THE MONTVILLE PLANNING AND ZONING COMMISSION CHAIRMAN DATE MADISON PLACE4/17/2025 10:13 AMStaff Review 01/15/25 APPROVED BY THE MONTVILLE INLAND WETLAND COMMISSION CHAIRMAN DATE EXPIRATION DATE SEC PLAN APPROVAL DATE Submission 02/11/25 Staff Comments 02/21/25 Staff Comments 03/07/25 Staff Comments 03/18/25 Staff Comments 03/31/25 Staff Comments 04/16/25 PHASE 1 PHASE 2 PHASE 3 FIRE ACCESS TURNING MOVEMENTS 1. INSTALL STOCKADE FENCING AROUND PHASE 2 PROJECT AREA AS REQUIRED TO PROTECT COMPLETED PHASE 1 UNITS. 2. RENOVATE EXTG. HOUSE (UNIT 1) FROM 4 FAMILY TO 1 FAMILY 3. CONSTRUCT SECONDARY DRAINAGE SYSTEM AND TIE INTO PHASE 1 SYSTEM 4. CONSTRUCT UNITS 2, 3, & 4 5. CONSTRUCT SUBSURFACE UTILITIES6. CONSTRUCT EMERGENCY ACCESS ENTRANCE AND PARKING AREA WITH 2 TOTAL PARKING SPACES 7. INSTALL TEMPORARY STOCKADE FENCE AND ACCESS GATES AROUND PERIMETER OF PHASE 3 AREA TO PROTECT COMPLETED PHASE 1 AND PHASE 2 DEVELOPMENT. NOTE: 1. UNIT 1 CANNOT BE OCCUPIED PRIOR TO RENOVATION AND ISSUANCE OF CZC AND CERTIFICATE OF OCCUPANCY FOR PHASE 2. 2. COORDINATE, MODIFY, AND ADJUST EROSION CONTROLS AS REQUIRED BY CONSTRUCTION ACTIVITIES WITH THE MEASURES ON SHEET C-4.1 AND PHASING AS INDICATED ON NOTE 1 OF THECONSTRUCTION SCHEDULE ON SHEET C-4.2.NORWICH NEW LONDON TNPK( ROUTE 32)POWERHOUSE ROAD TP-201-25 TP-202-25 PT-202-25 TP-203-25 PT-201-25 TP-102-24 TP-103-24 TP-104-24 TP-105-24TP-101-24 1 2 3 5 6 7 8910 4 11 1. RENOVATE EXTG. HOUSE (UNIT 7) FROM 2 FAMILY TO ONE FAMILY. 2. CONSTRUCT PRIMARY DRAINAGE SYSTEM 3. INSTALL DRAINAGE CONVEYANCE SYSTEM TO LEVEL SPREADER 4. CONSTRUCT UNITS 7, 6, and 5. 5. INSTALL SUBSURFACE UTILITIES 6. INSTALL ELECTRICAL CONDUIT TO ALL CURRENT AND FUTURE TRANSFORMER LOCATIONS 7. CONSTRUCT PARKING AREAS WITH 7 TOTAL PARKING SPACES. 8. INSTALL PHASE TWO STOCKADE FENCING AND ACCESS GATES ONCE UNITS ARE READY FOR OCCUPANCY. NOTE 1. COORDINATE, MODIFY, AND ADJUST EROSION CONTROLS AS REQUIRED BY CONSTRUCTION ACTIVITIES WITH THE MEASURES ON SHEET C-4.1 AND PHASING AS INDICATED ON NOTE 1 OF THE CONSTRUCTION SCHEDULE ONSHEET C-4.2. 2. PHASE 1 WILL BE OCCUPIED UPON COMPLETION. POWERHOUSE ROAD TP-201-25 TP-202-25 PT-202-25 TP-203-25 PT-201-25 TP-102-24 TP-103-24 TP-104-24 TP-105-24TP-101-24 1 2 3 5 6 7 8910 4 11 1.INSTALL TEMPORARY STOCKADE FENCE AND GATESAROUND THE CONSTRUCTION AREA.2.CONSTRUCT UNITS 8,9,10,113.TIE INTO SUBSURFACE DRAINAGE SYSTEM4.CONSTRUCT SUBSURFACE UTILITIES5.UPON COMPLETION, REMOVE STOCKADE FENCINGAND INSTALL PERMANENT PERIMETER FENCING. NOTECOORDINATE, MODIFY, AND ADJUST EROSION CONTROLSAS REQUIRED BY CONSTRUCTION ACTIVITIES WITH THEMEASURES ON SHEET C-4.1 AND PHASING AS INDICATEDON NOTE 1 OF THE CONSTRUCTION SCHEDULE ON SHEETC-4.2.POWERHOUSE ROAD TP-201-25 TP-202-25 PT-202-25 TP-203-25 PT-201-25 TP-102-24 TP-103-24 TP-104-24 TP-105-24TP-101-24 1 2 3 5 6 7 8910 4 11 NORWICH NEW LONDON TNPK( ROUTE 32)POWERHOUSE ROAD TP-201-25 TP-202-25 PT-202-25 TP-203-25 PT-201-25 TP-102-24 TP-103-24 TP-104-24 TP-105-24TP-101-24 1 2 3 5 6 7 8910 4 11 REFUSE AREA EMERGENCYVEHICLE ACCESSONLY TURN-AROUNDAREA Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 3/20/24 FE24-1889 THIS DRAWING IS THE PROPERTY OFTHE ENGINEER. IT HAS BEENSPECIFICALLY PREPARED FOR THEOWNER FOR THIS PROJECT AT THIS SITEAND IS NOT TO BE USED FOR ANYOTHER PURPOSE, LOCATION OR OWNERWITHOUT WRITTEN CONSENT OF THEENGINEER.PREPARED FOR18 POWERHOUSE ROAD LUXURY TOWNHOUSE DEVELOPMENTD.R.R.J.E.Q.JNE HOLDINGS, LLC525 JOHN STREET BRIDGEPORT, CT. 06604Office (203) 333-9465fax (203) 336-1769e-mail Info@FullerSurveyors MONTVILLE, CONNECTICUTAPPROVED BY THE MONTVILLE PLANNING AND ZONING COMMISSION CHAIRMAN DATE MADISON PLACEO:\Fuller CAD Files\CT\Bridgeport\Benson Terrace\#26 - FE13-1101 - Fox\Survey Data\2013 09 10 FE 13-1100 FOX 26BENSON TERR\LOCATION.crd4/17/2025 10:37 AMStaff Review 01/15/25 APPROVED BY THE MONTVILLE INLAND WETLAND COMMISSION CHAIRMAN DATE EXPIRATION DATE SEC PLAN APPROVAL DATE Submission 02/11/25 Staff Comments 02/21/25 Staff Comments 03/07/25 Staff Comments 03/18/25 Staff Comments 03/31/25 Staff Comments 04/16/25 NOTES: 1.THIS PLAN IS FOR THE PROPOSED GRADING AND DRAINAGE FOR THE CONSTRUCTION OF A RESIDENTIALDEVELOPMENT WITH PARKING, AND MISCELLANEOUS LANDSCAPING ALONG THE CT ROUTE 32. THIS PLAN IS NOT TOBE USED AS A SITE OR CONSTRUCTION PLAN. ADDITIONAL DESIGN AND DETAILS REQUIRED FOR BIDDING ANDCONSTRUCTION. 2. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION ANDFOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 3. THE CONTRACTOR SHALL LOCATE AND VERIFY THE SIZE, LOCATION, DEPTH AND INVERTS OF ANY AND ALL EXISTINGUTILITIES PRIOR TO COMMENCING OPERATIONS. THE CONTRACTOR SHALL ALSO BE REQUIRED TO CONTACT THETOLL FREE "CALL-BEFORE-YOU-DIG" PHONE NUMBER AT 1-800-922-4455. 4. THE PROPOSED DEVELOPMENT SHOWN HEREON WILL REQUIRE REVIEW AND APPROVAL BY THE MONTVILLEBUILDING DEPARTMENT. 5. ALL ROOF LEADERS SHALL BE PIPED AND CONNECTED TO THE SUBSURFACE DRAINAGE SYSTEM. PIPE ROUTING ANDGUTTER CONNECTIONS SHALL BE DETERMINED BY CONTRACTOR. 6. ALL WORK PERFORMED BY THE OWNER / DEVELOPER MUST INCLUDE IMPLEMENTATION OF AN APPROVED SOILEROSION AND SEDIMENTATION PLAN. SEE SHEET C-4.1 AND C-4.2. 7. RESTORE ALL DISTURBED AREAS WITH A MINIMUM OF FOUR (4") INCHES OF TOPSOIL, SEED, AND HAY MULCH UPONCOMPLETION OF CONSTRUCTION. 8. LOT SERVED BY TOWN SEWER SYSTEM AND PUBLIC WATER SUPPLY. 9. ALL EXISTING UTILITY LINES THAT WILL BE DISCONNECTED MUST BE CAPPED OR TERMINATED ACCORDING TO THETOWN OF MONTVILLE AND UTILITY COMPANY STANDARDS. 10. SEE DETAILS FOR TEMPORARY AND PERMANENT TRENCHING WITHIN THE POWERHOUSE ROAD. 11. SEE ENGINEERING REPORT FOR OPERATION AND MAINTENANCE PLAN. TEST PIT AND PERCOLATION DATA MAP REFERENCES: A. "ZONING IMPROVEMENT LOCATION AND TOPOGRAPHIC SURVEY", DATED 7 JANUARY 2022, SCALE 1"=20', BYFULLER ENGINEERING AND LAND SURVEYING, LLC. EARTHWORK Cut/Fill Summary Name Surface2 Totals Cut Factor 1.000 Fill Factor 1.000 2d Area 59758.81 Sq. Ft. 59758.81 Sq. Ft. Cut 1938.12 Cu. Yd. 1938.12 Cu. Yd. Fill 803.40 Cu. Yd. 803.40 Cu. Yd. Net 1134.72 Cu. Yd.<Cut> 1134.72 Cu. Yd.<Cut> OHW OHW OHW OHW OHWOHWOHWOHWOHWOHWOHWBIT. CONC. PAVEMENT 2 1/2 STORYWOOD FRAMEHOUSE NORWICH NEW LONDON TNPK( ROUTE 32)STEELHATCH GRAVEL WELL OILFILL MAILBOXOHWOHW EM UTLBOX LAWN AREA LAWN AREA SNET 2741 S UP 7702 FRONT 2742 FRONT 2741 BIT. CONC. CURBBARBED WIRE FENCE BARBED WIRE FENCE STOCKADE FENCE STOCKADE FENCESTOCKADE FENCE1 STORYCONC. WALK CONC. WALKCONC. LANDING CONC. LANDING CURB CUTCONC.STEPSI PIN FNDI PIPE FND I PIN FND CONC.STEPS CONC. WALK PLANTINGAREAOHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW CLP 2445 HETL CO 2426 HELT CO 2506 POWERHOUSE ROAD WELL WELL CHAINLINK FENCEREMAINS OF CONC. FLOOR CONC. CURBCONC. CURBBIT. CONC. PAVEMENT CONC. WALKCONC. WALKCONC. WALK E.O.P. E.O.P. E.O.P.E.O.P.GRAVELDRIVEWAY 2 1/2 STORYWOOD FRAMEHOUSEFP. 1,382 S.F. FP. 1,536 S.F. MERESTONEHELD MON FND /HELD FIRE HYD D.H. FND TP-201-25 TP-202-25 PT-202-25 TP-203-25 PT-201-25 TP-102-24 TP-103-24 TP-104-24 TP-105-24TP-101-24 32 LF 6" Ø SDR-35 @ 0.11 85 LF 6" Ø SDR-35 @0.08 MIN6 LF 8" Ø SDR-35 @ 0. 0 4 MIN 95 L.F. LEVEL SPREADER (PHASE 1)TOP = 92.1INV. = 91.1 21 L F 1 0 " Ø SD R - 3 5 @0 . 0 1 5 M I N 95 L.F. LEVEL SPREADER (PHASE 2)TOP = 90.5INV. = 89.5 OVERFLOW DISTRIBUTION BOX (PHASE 2) 27 - 4 x 4 x 4' PRE-CAST CONCRETE GALLEY'SEMBEDDED IN 1" BROKEN / CLEAN STONE14' x 38'' x 4' DEEP (Stone)BOTTOM ELEV. (GALLEYS)=93.9BOTTOM STONE ELEV. = 93.4INV. 10" W. IN. = 95.9 (Phase 2)INV 8" S. IN =95.9INV 8" E. IN = 95.9INV 6" NE OUT = 93.9 40 - 4 x 4 x 4' PRE-CAST CONCRETE GALLEY'SEMBEDDED IN 1" BROKEN / CLEAN STONE18' x 42' x 4' DEEP (Stone)BOTOM ELEV. (GALLEYS)= 98.6BOTTOM STONE ELEV. = 98.1INV 8" N IN = 100.6INV 8" NE IN = 100.6INV 6" E OUT = 98.6 CB 6 (PHASE 2) GRATE 104.8 8" ADS INV. OUT = 102.0 CB 4GRATE 101.88" ADS INV OUT = 97.0 CB 3GRATE 101.8 10" ADS INV IN / OUT = 96.3 CB 5 (PHASE 2) GRATE 102.8 8" ADS INV OUT. = 100.9 CB 2 GRATE 100.5 8" ADS INV. IN = 97.3510" ADS INV OUT = 97.30 102 LF 10" Ø SDR-35 @0.01 MIN32 LF 8" Ø SDR-35 @0.01 MINCB 1GRATE 100.3 8" ADS INV OUT. = 97.7 2x2 PARTICLE SEPARATORWITH 2' SUMP 2x2 PARTICLE SEPARATOR WITH 2'SUMP 2x2 PARTICLE SEPARATORWITH 2' SUMP 2x2 PARTICLESEPARATORWITH 2' SUMP 2x2 PARTICLESEPARATORWITH 2' SUMP CLEAN-OUT (TYP) EROSION CONTROL MATS (SEE DETAIL ON SHEETC-4.2) 28LF 8" Ø SDR-35 @ 0.01 19 LF 8" Ø SDR-35 @ 0.06 ROUTE ALL ROOF LEADERS FROM UNITS 1,2, 3, & 4 ARE ROUTED TOTHE GALLEYS (V.I.F.) 2x2 PARTICLESEPARATOR WITH 2' SUMP TF - 101.8Inv. In/Out 98.28 70 LF 6" Ø SDR-35@0.027 MIN1.67' Pipe Separation 0.50' Pipe Separation 25 LF 8" Ø SDR-35 @ 0.086 EROSION CONTROL MATS (SEE DETAIL ON SHEET C-4.2) AD 1 GRATE 103.5 8" ADS INV OUT = 100.2 OUTLET CONTROLSTRUCTURE INV IN = 98.6INV OUT = 102.6 OUTLET CONTROLSTRUCTUREINV IN = 93.9 INV OUT = 97.9 SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN W W W W W W W W W W W W W WWWWW W W W W W W W W W W W W W SANSANSANSAN SANWWWWWW W WETCETCETCETCETCETCETCETCETCW SAN SAN SAN SAN SAN SAN SANSANSANSANSANSANSANSANSANSAN10' Min SAN SAN F.F. El. = 108.8 F.F. El. = 103.6 F.F. El. = 107.1 F.F. El. = 104.1 F.F. El. = 102.1 F.F. El. = 105.6 F.F. El. = 104.0 F.F. El. = 102.1 F.F. El. = 102.3 F.F. El. = 102.4 F.F. El. = 102.3 Gar. Fl. El. =103.1 F.F. El. = 105.1F.F. El. = 106.6 Gar. Fl. El. =104.6Gar. Fl. El. =106.1Gar. Fl. El. =106.6 Gar. Fl. El. =105.5 Gar. Fl. El. =105.1 Gar. Fl. El. =103.5 Gar. Fl. El. =102.6 HP HP 1 2 3 5 6 7 8910 4 11 Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 3/20/24 FE24-1889 THIS DRAWING IS THE PROPERTY OFTHE ENGINEER. IT HAS BEENSPECIFICALLY PREPARED FOR THEOWNER FOR THIS PROJECT AT THIS SITEAND IS NOT TO BE USED FOR ANYOTHER PURPOSE, LOCATION OR OWNERWITHOUT WRITTEN CONSENT OF THEENGINEER.PREPARED FOR18 POWERHOUSE ROAD LUXURY TOWNHOUSE DEVELOPMENTD.R.R.J.E.Q.JNE HOLDINGS, LLC525 JOHN STREET BRIDGEPORT, CT. 06604Office (203) 333-9465fax (203) 336-1769e-mail Info@FullerSurveyors MONTVILLE, CONNECTICUTAPPROVED BY THE MONTVILLE PLANNING AND ZONING COMMISSION CHAIRMAN DATE MADISON PLACEO:\Fuller CAD Files\CT\Bridgeport\Benson Terrace\#26 - FE13-1101 - Fox\Survey Data\2013 09 10 FE 13-1100 FOX 26BENSON TERR\LOCATION.crd4/17/2025 10:38 AMStaff Review 01/15/25 APPROVED BY THE MONTVILLE INLAND WETLAND COMMISSION CHAIRMAN DATE EXPIRATION DATE SEC PLAN APPROVAL DATE Submission 02/11/25 Staff Comments 02/21/25 Staff Comments 03/07/25 Staff Comments 03/18/25 Staff Comments 03/31/25 Staff Comments 04/16/25 NOTES: 1.THIS PLAN IS FOR THE PROPOSED UTILITIES OF THE PROPOSED RESIDENTIAL DEVELOPMENT WITH PARKING CONSTRUCTION, ANDMISCELLANEOUS LANDSCAPING. THIS PLAN IS NOT TO BE USED AS A SITE OR CONSTRUCTION PLAN. ADDITIONAL DESIGN ANDDETAILS REQUIRED FOR BIDDING AND CONSTRUCTION. 2. UNLESS OTHERWISE NOTED, ALL UTILITIES ARE UNDERGROUND. 3. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THESAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 4. THE CONTRACTOR SHALL LOCATE AND VERIFY THE SIZE, LOCATION, DEPTH AND INVERTS OF ANY AND ALL EXISTING UTILITIESPRIOR TO COMMENCING OPERATIONS. THE CONTRACTOR SHALL ALSO BE REQUIRED TO CONTACT THE TOLL FREE"CALL-BEFORE-YOU-DIG" PHONE NUMBER AT 1-800-922-4455. 5. THE PROPOSED DEVELOPMENT SHOWN HEREON WILL REQUIRE REVIEW AND APPROVAL BY THE LOCAL BUILDING DEPARTMENT. 6. ALL WORK PERFORMED BY THE OWNER / DEVELOPER MUST INCLUDE IMPLEMENTATION OF AN APPROVED SOIL EROSION ANDSEDIMENTATION PLAN. SEE SHEET C-4.1 AND C-4.2. 7. RESTORE ALL DISTURBED AREAS WITH A MINIMUM OF FOUR (4") INCHES OF TOPSOIL, SEED, AND HAY MULCH UPONCOMPLETION OF CONSTRUCTION. 8. SEE DETAILS FOR TEMPORARY AND PERMANENT TRENCHING WITHIN THE POWERHOUSE ROAD. 9. LOT SERVED BY TOWN SEWER SYSTEM AND PUBLIC WATER SUPPLY. APPLICATION WILL BE MADE TO THE WATER POLLUTIONCONTROL AUTHORITY FOR A PERMIT TO CONSTRUCT AND CONNECT WATER AND SEWER LINES TO THE MONTVILLE SEWERSYSTEM. 10. EXISTING UNDERGROUND UTILITY LOCATION TAKEN FROM MAPS PROVIDED BY UTILITY COMPANY AND SEWER DEPARTMENT,PRIOR SURVEYS, AND FIELD MARKINGS. 11. ALL EXISTING UTILITY LINES THAT WILL BE DISCONNECTED MUST BE CAPPED OR TERMINATED ACCORDING TO THE TOWN OFMONTVILLE AND UTILITY COMPANY STANDARDS. 12. IF REQUIRED, ALL EXISTING SANITARY SEWER LINES SHALL BE CAPPED WITHIN 2 FEET OF THE EXISTING SEWER MAIN. 13. ALL ROOF LEADERS SHALL BE PIPED AND CONNECTED TO THE SUBSURFACE DRAINAGE SYSTEM. PIPE ROUTING AND GUTTERCONNECTIONS SHALL BE DETERMINED BY CONTRACTOR. 14. ALL UNITS ARE DESIGNED TO HAVE SANITARY CONNECTIONS IN EACH BASEMENT AND WILL PUMP UP TO THE MAIN LATERAL ATTHE FRONT OF THE BUILDINGS. SANITARY LIFT SYSTEMS ARE REQUIRED TO FACILITATE ALL SEWAGE DISCHARGE TO THE TOWNSEWER SYSTEM IN THE STREET. 15. ALL WORK SHALL COMPLY WITH THE FOLLOWING TOWN STANDARDS: 15.1. TOWN OF MONTVILLE SEWER USE RULES AND REGULATIONS. 15.2. TOWN OF MONTVILLE SANITARY SEWER MATERIALS AND CONSTRUCTION STANDARDS. 15.3. TOWN OF MONTVILLE SPECIFICATIONS OF WATER MAINS AND APPURTENANCES. 16. SEWER PIPE TO BE PLASTIC PVC-SDR35. 17. WATER LINES TO BE TYPE K COPPER TUBING. 18. GRINDER PUMPS SHALL BE INSTALLED IN ALL UNITS. MAP REFERENCES: A. "ZONING IMPROVEMENT LOCATION AND TOPOGRAPHIC SURVEY", DATED 7 JANUARY 2022,SCALE 1"=20', BY FULLER ENGINEERING AND LAND SURVEYING, LLC. 1 2 3 5 6 7 8910 4 11 OHW OHW OHW OHW OHWOHWOHWOHWOHWOHWOHWNORWICH NEW LONDON TNPK( ROUTE 32)OHWOHWOHWOHWOHWOHWOHWOHWOHWOHWOHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHWPOWERHOUSE ROAD TP-201-25 TP-202-25 PT-202-25 TP-203-25 PT-201-25 TP-102-24 TP-103-24 TP-104-24 TP-105-24 TP-101-24 PROPOSED WATER UTILITY GATEVALVE AND SERVICE LINE FINALLOCATION BY UTILITY COMPANY NEW 12"x2" TAP w/2" VALVE ELECTRIC METERBANK CLUSTER ELECTRIC METERBANK CLUSTER ELECTRICMETER BANKCLUSTERSANSANSANSANSANSANSANSANSANSAN Inv = 98.2 SanOut=98.5 EXTG SAN MHINV IN = 93.4(VERIFY IN FIELD) W W W W W W W W W W W W W WWWWW W W W W W W W W W W W W W PROPOSED 167KVA TRANSFORMERPAD #202 w/ (2) PROTECTION BOLLARDS PROPOSED 167KVA TRANSFORMERPAD #202 w/ (2) PROTECTION BOLLARDS PROPOSED 167KVA TRANSFORMERPAD #202 w/ (2) PROTECTION BOLLARDS EXTG. FIREHYDRANT EXTG. WELL TO BEABANDONED PERHEALTH DISTRICTREQUIREMENTS 34" K SERVICEAND VALVE(TYP) EXTG. SANITARYLINE (TBD)SANSANSANSAN SANWWWWWW W W EXTG. WATERSERVICE(EXTG LOCATION TBD)ETCETCETCETCETCETCETCETCETCW SAN SAN SAN SAN SAN SAN SANSANSANSANSANSANSANSANSANSANInv = 97.7 Inv = 97.4 Inv =96.4 San Out = 96.6 San Out = 96.0 San Out = 97.6San Out = 97.9San Out = 98.4 San Out = 99.4 SanOut=99.0 SanOut = 98.0 SanOut =97.4 Inv = 98.8 Inv = 98.3 Inv = 97.8 Inv = 97.2 C.O. C.O.C.O.C.O. C.O. C.O. C.O. Extg Overhead Wire Service tobe Abandoned (PotentialElectrical Service ConnectionPer Eversource if Required) PROPOSED 2"ISOLATION VALVE (TYP) PROPOSED 2"ISOLATION VALVE (TYP) PROPOSED 2" BLOWOFF HYDRANT PROPOSED 2" BLOWOFF HYDRANT New 2" Water L i n e New 2" Water Line New 2" Water LineNe w 2 " W a t e r L i n e 34" K SERVICEAND VALVE(TYP) 34" K SERVICEAND VALVE(TYP) 34" K SERVICE AND VALVE (TYP) PROPOSED 34" ISOLATION VALVE ATEACH UNIT (TYP) PROPOSED 34"ISOLATION VALVE ATEACH UNIT (TYP) PROPOSED 34"ISOLATION VALVE ATEACH UNIT (TYP) EXTG. WELL TO BEABANDONED PERHEALTH DISTRICTREQUIREMENTS PROPOSED SAN MHT.F. = 101.7INV IN = 96.5INV OUT = 96.5 EXTG. WELL TO BEABANDONED PERHEALTH DISTRICTREQUIREMENTS 10'Min EXISTING SAN LINESERVING EXTG.HOUSE TO REMAIN EXISTING SAN LINESERVING EXTG.HOUSE TO REMAIN SAN SAN SAN / WATER CROSSINGFINISH GRADE = 101.9EL WATER LINE 97.9INV SAN = 96.1(VERT SEP = 1.8') PROPOSED WATER METER (TYP)PROPOSED SAN MHT.F. = 101.49INV IN/OUT = 96.5INV OUT = 96.7 C.O. C.O. PROPOSED SANITARYCLEANOUT AT 75' MIN. PROPOSED SANITARYCLEANOUT AT 75' MIN. C.O. PROPOSED 6" SANMAIN (TYP) PROPOSED 6" SANMAIN (TYP) PROPOSED 6" SANMAIN (TYP) PROPOSED 4" SANLATERAL (TYP) PROPOSED 4"SAN LATERAL(TYP) NOTES: MAP REFERENCES: Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 3/20/24 FE24-1889 THIS DRAWING IS THE PROPERTY OFTHE ENGINEER. IT HAS BEENSPECIFICALLY PREPARED FOR THEOWNER FOR THIS PROJECT AT THIS SITEAND IS NOT TO BE USED FOR ANYOTHER PURPOSE, LOCATION OR OWNERWITHOUT WRITTEN CONSENT OF THEENGINEER.PREPARED FOR18 POWERHOUSE ROAD LUXURY TOWNHOUSE DEVELOPMENTD.R.R.J.E.Q.JNE HOLDINGS, LLC525 JOHN STREET BRIDGEPORT, CT. 06604Office (203) 333-9465fax (203) 336-1769e-mail Info@FullerSurveyors MONTVILLE, CONNECTICUTAPPROVED BY THE MONTVILLE PLANNING AND ZONING COMMISSION CHAIRMAN DATE MADISON PLACEO:\Fuller CAD Files\CT\Bridgeport\Benson Terrace\#26 - FE13-1101 - Fox\Survey Data\2013 09 10 FE 13-1100 FOX 26BENSON TERR\LOCATION.crd4/17/2025 10:41 AMStaff Review 01/15/25 APPROVED BY THE MONTVILLE INLAND WETLAND COMMISSION CHAIRMAN DATE EXPIRATION DATE SEC PLAN APPROVAL DATE Submission 02/11/25 Staff Comments 02/21/25 Staff Comments 03/07/25 Staff Comments 03/18/25 Staff Comments 03/31/25 Staff Comments 04/16/25 TEMPORARY SOIL EROSION & SEDIMENT CONTROL PLAN 1.THIS PLAN IS FOR THE PROPOSED SOIL EROSION AND SEDIMENT CONTROL FOR THE CONSTRUCTION OF ARESIDENTIAL DEVELOPMENT WITH PARKING, AND MISCELLANEOUS LANDSCAPING ALONG THE CT ROUTE 32.THIS PLAN IS NOT TO BE USED AS A SITE OR CONSTRUCTION PLAN. ADDITIONAL DESIGN AND DETAILSREQUIRED FOR BIDDING AND CONSTRUCTION. 2. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTIONAND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 3. THE PROPOSED DEVELOPMENT SHOWN HEREON HAS BEEN DESIGNED IN ACCORDANCE WITH SECTION 15.1 OFTHE ZONING REGULATIONS. 5. ALL WORK PERFORMED BY THE OWNER / DEVELOPER MUST INCLUDE IMPLEMENTATION OF AN APPROVEDSOIL EROSION AND SEDIMENTATION PLAN. SEE SHEET C-4.2 FOR EROSION CONTROL NOTES AND DETAILS. 6. RESTORE ALL DISTURBED AREAS WITH A MINIMUM OF FOUR (4") INCHES OF TOPSOIL, SEED, AND HAY MULCHUPON COMPLETION OF CONSTRUCTION. SEDIMENT TRAP CALCULATIONS A. "ZONING IMPROVEMENT LOCATION AND TOPOGRAPHIC SURVEY", DATED 7 JANUARY 2022, SCALE 1"=20', BYFULLER ENGINEERING AND LAND SURVEYING, LLC. OHW OHW OHW OHW OHWOHWOHWOHWOHWOHWOHWBIT. CONC. PAVEMENT 2 1/2 STORYWOOD FRAMEHOUSE NORWICH NEW LONDON TNPK( ROUTE 32)STEELHATCH GRAVEL WELL OILFILL MAILBOX OHWOHWOHWOHWOHWOHWOHWOHWOHWEM UTLBOX LAWN AREA LAWN AREA SNET 2741 S UP 7702 FRONT 2742 FRONT 2741 FRONT 2740 BIT. CONC. CURBBARBED WIRE FENCE BARBED WIRE FENCE STOCKADE FENCE STOCKADE FENCESTOCKADE FENCE1 STORYCONC. WALK CONC. WALKCONC. LANDING CONC.LANDING CURB CUTCONC.STEPSI PIN FNDI PIPE FND I PIN FND CONC.STEPS 20' SIDE BUILDING SETBACK 20' SIDE BUILDING SETBACK40' FRONT BUILDING SETBACKGUTTER LINECONC. WALK PLANTINGAREAOHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW CLP 2445 HETL CO 2426 HELT CO 2506 POWERHOUSE ROAD WELL WELL CHAINLINK FENCEREMAINS OF CONC. FLOOR CONC. CURBCONC. CURBBIT. CONC. PAVEMENT CONC. WALKCONC. WALKCONC. WALK E.O.P. E.O.P. E.O.P.E.O.P.GRAVEL DRIVEWAY 1 STORY WOOD FRAME SHED 2 1/2 STORYWOOD FRAMEHOUSE1 STORY WOODFRAME GARAGE 6.4'60.9'4.0'4.6'57.5'58.3'21.6'184.6'40' REAR BUILDING SETBACK20' SIDE BUILDING SETBACK 20' S IDE BUILDING SETBACK 40' REAR BUILDING SETBACK 20' SIDE BUILDING SETBACK40' FRONT BUILDING SETBACK FP. 1,382 S.F.FP. 760 S.F. FP. 373 S.F. FP. 1,536 S.F. MERESTONEHELD MON FND /HELD FIRE HYD D.H. FND TP-201-25 TP-202-25 PT-202-25 TP-203-25 PT-201-25 TP-102-24 TP-103-24 TP-104-24 TP-105-24 TP-101-24 PROPOSED SILTFENCE (TYP) PROPOSED 15'x50'MINANTI TRACKINGAPRON OR EXTG.PAVEMENT ASREQUIRED PROPOSED SILT SACKAND SEDIMENT TRAP(TYP) - LEAVE FRAMESAND GRATES HIGHDURING CONSTRUCTION BASIN 2TEMPORARY SEDIMENT BASIN - ELEVATION IS SUBJECT TOCHANGE THROUGHOUT CONSTRUCTOIN - MINIMUM CAPACITY = 90 CY (2,423 CF MIN) - STABILIZE & RESTORE TO EXTG. GRADEAFTER PHASE 2 LEVEL SPREADER HAS BEEN INSTALLED SF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF PROPOSED 24'x50'MIN ANTI TRACKINGAPRON PROPOSED SILTFENCE (TYP) PROPOSED DOUBLE ROW SILTFENCE (TYP)SFSFSFSF SFSFSFSFPROPOSED STOCKPILE AREA RINGEDWITH SILT FENCE AND HAYBALEBACKING. COORD. RELOCATE AS REQDDURING PROJECT PHASING. (TYP) TEMPORARY DIVERSION BERMw/STONE CHECK DAMS AT 50' O.C.(TYP) - RELOCATE AS REQUIREDDURING CONSTRUCTION- MAINTAIN SWALE DURING PHASE 1AND PHASE 2 TEMPORARY DIVERSION BERMw/STONE CHECK DAMS AT 50' O.C.(TYP) - RELOCATE AS REQUIREDDURING CONSTRUCTION- REMOVE AFTER PHASE 1 HAS BEENSTABILIZED BASIN 1TEMPORARY SEDIMENT BASIN - ELEVATION ISSUBJECT TO CHANGE THROUGHOUTCONSTRUCTION - MINIMUM CAPACITY = 90 CY(2,423 CF MIN) - STABILIZE & RESTORE TO EXTG.GRADE AFTER PHASE 1 DIVERSION BERM HASBEEN REOVED AND STABILIZED TEMPORARY SILT FENCE DURING TOREMAIN THROUGHOUT THE DURATION OFSEDIMENT BASIN OPERATION - REMOVEAFTER PHASE 2 DIVERSION BERM HASBEEN REMOVED AND STABILIZED. SF SF SF SF SF SF SF