Loading...
HomeMy WebLinkAbout25SITE2 - Bond EstimiateSedimentation and Erosion Controls Bond Estimate 145 CT Rt 32 & 18 Powerhouse Road Montville, Connecticut NO.DESCRIPTION UNIT QUANTITY UNIT PRICE COST 1 General Sedimentation and Erosion Control Measures (aprons, swales etc)L.S. 2 1,000 2,000 2 Silt Fence L.F.1,300 4.00 5,200 Haybales L.F.100 4.00 400 3 Topsoil, Seed, Fertilizing, and Mulch (Disturbed Area)S.F. 70,000 0.15 10,500 4 Landscaping (extent to provide for restoration and aesthetic considerations)L.S. 1 1,000 1,000 5 Grading for site restoration that will provide safe and stable conditions.L.S. 1 1,000 1,000 6 Other Subtotal 20,100 10% Contingency 2,010 TOTAL 22,110.00 NOTES: The Quill Group Fuller Engineering & Land Surveying, LLC Civil Engineering, Landscape Architecture, Surveying Atlantic Consulting & Engineering, LLC Geotechnical, Structural, Mechanical, Electrical, & Plumbing Fairfield Testing Laboratories, LLC Materials Testing, Inspection, & Certifications, Special Inspections 2/21/2025 Quantities and values provide our estimate for the restoration of the disturbed site to a stabilized condition and does not include drainage, paving, curbing, landscaping or other improvements as specified on the plans.