HomeMy WebLinkAbout25 SITE 5 bld. comments maple ave-375-25-5 (6.16.25)Building Official’s Comments
Date: 06/16/2025
Project Address: 375 Maple Ave 25- site 5
Project Name: Rand Whitney trailer storage
Reviewer: Doug Colter, Building Official
Upon review of land use documents submitted to the town planning officials, the Building
Official notes the following:
1.) No structures or electrical installations noted on plans
2.) Any new retaining walls over 3’ in height require engineering and a building permit
3.) Site storm water drainage infrastructure is governed by the IPC portion of the CT State
Building Code, requires a permit and a licensed plumbing contractor
4.) Any proposed site lighting is regulated by the 2022 CSBC for full cut off fixtures,
maximum lighting power, and lighting controls. There is insufficient information on the
land use plans to determine compliance.
These comments should be considered a preliminary courtesy review, and not a thorough review under the auspices
of the CT State Building Code. These are not exhaustive or limiting comments, do not create an estoppel, and are
not an approval. A formal Building Permit application accompanied by Construction Documents per CT State
Statutes and the CT State Building Code are required for a formal review, and work is not authorized until a Building
Permit is issued by the Building Official. It is the applicant’s responsibility to coordinate State and Town
requirements at the time of application for approvals.