Loading...
HomeMy WebLinkAboutWalnut Drive Plans 1988ifl 1. Set posts and 2. Stale wire Posts. excavate a 6"x6" I� wire ��� s "� ' trench, set. post fenci n Angle e Ia° g � ;.' �en� i r�i �`�' 9 r downslope. end post. upsvpe r"or y stability and S, self cleaning. t 100° 111L 1 st _ 1� � 1211min. depth 4, rt p 3. Attach filter fabric to the wire fencing and extend it to the trench. �tl.rlif i� )li�lSf� �► t= t 4� `�� j -- r 11 w �` _till =�tf� Compacted Backfi11 , /f/ r r Z _ Cons tract i or of a Synthe r=c Filter Ba_rri er SEEDBED PREPARATION b SEEDING 4. Back�ill the trench and compact the excavated soil. The site will be fine graded and the soil surface raked to remove stones larger than 2 inches in diameter. Topsoil will be spread at a minimum compacted depth of 4 inches. Once the topsoil has been spread, all stones 2 inches for larger will be removed as well as debris. Apply agricultural ground limestone at a rate of 100 lbs. per 1000 square feet. Apply 10-10-10 fertilizer or equiv- alent at a rate of 7.5 lbs per 1000 square f ..!t. Do not apply fertilizer to wetland areas. Work lime and fertilizer into the soil to a depth of 4 inches. Inspect seedbed before seeding. If traffic has compacted the soil, retili compacted areas. Apply the following grass seed mix. ROAD SIDES, BANKS AND WETLAND AREAS mix Lbs.%Acres Lbs./1000sf Reed. Canarygrass 20 .45 Red Top 5 .10 LAWNS Mix Lbs./Acres Kentucky Bluegrass 20 Creeping Red Fescue 20 Pnronni �l Dvor.�-�.. r Lbs. 1g00sf .4 ,et —0-70