Loading...
HomeMy WebLinkAbout125 Depot Rd Inspection Report 1-25-23Town of Montville Inspection Report Date: 1/25/2023 Inspection Type: Zoning Permit Inspection/CZC Yes No MS4/ Erosion and Sediment Control Inspection ☒ ☐ Location: 125 Depot Road Et Al Map/Lot/Block: 071-007-000 Parties Present Choose an item. Choose an item. Choose an item. Choose an item. Choose an item. Meredith Badalucca Click here to enter text. Click here to enter text. Click here to enter text. Yes No CZC Approved ☐ ☒ Comments/Observations Resolution Date: Click here to enter a date. Did on-going inspection of site. Salt is almost completely covered. They were completing during my inspection as can be seen in attached photos. Also drove around neighborhood to see if there were any trucks parked on the side of the road as we have received complaints. No trucks on site nor in the neighborhood at 1:00 p.m. inspection. Very little vehicle traffic and one woman walking a dog were observed. There is also construction in process at Gay Cemetery Pond Dam which is across from Gair Court at 82 Depot Rd. Town of Montville Inspection Report Salt Pile being covered Town of Montville Inspection Report Salt Pile, looking from exit of site Salt pile being covered Town of Montville Inspection Report Salt Pile from exit of site Scale Town of Montville Inspection Report Looking at site from Dock Rd Phase 2 work Town of Montville Inspection Report Salt pile from Dock Road side of property