HomeMy WebLinkAboutBoundaries Site OperationsDevelopment Plan 52002SEE SHEET 17 FOR
DRIVEWAY PLAN & PROFILE
I Q�
C
v
/
I
/
I I1'
I 4 •;
Dp `
I -- CK R0A
1
�44 4
% 44
55 DOCK ROAD.
SEE SHEET 5 FOR 55 DOCK ROAD SURVEY J
AND SHEET 18 FOR 55 DOCK ROAD SITE PLAN
G� �'r.EwrESainm"a� Mroa9uC
------------------L_ -1
\ SHEET 3
�. SHEET 6
`i ♦ SHEETS
SHEET 10
t
\ SHEET 12
SHEET 14
.: SHEET 16 I
PHASE 28% `"tiy ♦♦\
` 2 3+ ACRES �r ♦♦
t . $ ♦�
L tl � ♦ems. -i I � I
PHASE 1
PHASE 2A
4.9± ACRES %�`
/ ♦ I
y I ♦ �\ t I
125 DEPOT ROAD L,
10
♦ I I
I
PHASE 2C
4.2± ACRES
7j
0
GRAPHIC6 U
W R)
1 IncL
f I
f � I
I
SHEET 4
SHEET 7
SHEET 9 1
SHEET 11 1
SHEET 13
SHEET 15
SOUTH
PROJECT DESCRIPTION:
PHASE 1
CONSTRUCT NEW ACCESS DRIVEWAY AND SALT
STORAGE PAD ON 133 DEPOT ROAD. IMPROVE
ACCESS TO PIER AND INSTALL CONVEYORS FOR
OFF-LOADING BARGE. STORMWATER
MANAGEMENT IMPROVEMENTS ALONG SEA WALL.
INSTALL RETAINING WALL AT 55 DOCK ROAD.
PHASE 2A
PLACE 23,700± CUBIC YARDS OF FILL FOR FUTURE
RAIL SIDINGS ON 4.9±ACRE AREA OF 125 DEPOT
ROAD. CONSTRUCT NEW ACCESS DRIVEWAY ON
125 DEPOT ROAD AND INSTALL STORMWATER
MANAGEMENT IMPROVEMENTS TO COLLECT AND
TREAT RUNOFF PRIOR TO DISCHARGE,
PHASE 2B
PLACE 6,500± CUBIC YARDS OF FILL FOR FUTURE
MATERIAL STOCKPILE AREA ON 2.3±ACRE AREA OF
125 DEPOT ROAD. CONSTRUCT NEW ACCESS
DRIVEWAY ON 125 DEPOT ROAD AND INSTALL
STORMWATER MANAGEMENT IMPROVEMENTS TO
COLLECT AND TREAT RUNOFF PRIOR TO
DISCHARGE.
PHASE 2C
PLACE 36,600± CUBIC YARDS OF FILL FOR FUTURE
MATERIAL STOCKPILE AREA ON 4.2± ACRE AREA OF
125 DEPOT ROAD. CONSTRUCT NEW ACCESS
DRIVEWAY ON 125 DEPOT ROAD AND INSTALL
STORMWATER MANAGEMENT IMPROVEMENTS TO
COLLECT AND TREAT RUNOFF PRIOR TO
DISCHARGE.
55 DOCK ROAD
INSTALL RETAINING WALL DURING PHASE 1 AND
SECURITY FENCE AS REQUIRED.
1.
are May 2022
10B1E"a 223140
SHEET NO.
4
2