Loading...
HomeMy WebLinkAboutZP #209-166 SFR32 _114maf / Expiration Date /L /� 16 Zoning Permit # Z!1 i Fee $t7 Town of Montville ZONING PERMIT IT IS THE OWNERS/AGENTS RESPONSIBILITY TO FURNISH THE FOLLOWING INFORMATION: 5�2 / n Nature of Request/Proposed Use: �jC4) C r/ ,/1-az 4an lfcl �Gv✓7 �</k�/ lK�ni 6 / Property Location: 3 g % , (mh 5 � tA- - Map Lot Zone Property Owner ., C!/ // // /7J(s. -Cq Applicant C u/ %� /TC M* C Applicant Address Phone# /� ' y S Fax# Q6U ���522 Email Provide a copy of plans drawn to a scale of at least 1" = 40' showing: dimensions of the lot, the size, area, and location of existing, proposed, principal and accessory structures, driveways, sanitary facilities and water supply, parking facilities, and adjacent streets; distances of proposed structures from property lines and wetlands. A plan prepared by a Connecticut Registered Land Surveyor may be required. The nature of request or proposed use specified above shall not be authorized until an actual Certificate of Compliance is issued by the Commission or its appointed agents. The owner/agent is responsible for and agrees to: 1. Furnish all necessary information and documentation to process application. 2. Adhete to all the applicable requirements of the Zoning Regulations. 3. Notify the Commission or its appointed agent of any alteration in the plans. 4. Contact the Zoning Officer (848-8549 x-379) at least 24 hours before construction begins and upon 5. An E&S bond may be required prior to compliance sign off and held for one year from this date. I hereby certify that the information provided is true and correct and further attest that the proposed work is authorized by the owner in fee d that I am authorized to make application for a permit for such described work. Owner/Agents signature Date: /L /��L/G f Date: Date Commission Agent Certificate of Compliance (COC) OFFICE USE ONLY YES N/A Cash /Check # 7 Z Site Plan ❑ ❑ Wetlands Permit ❑ ❑ Has a Variance Ever Been Granted For This Property? ❑ ❑ Has Bond Been Filed ❑ ❑ Rev. 4/07 HAREGULATIONS'Site Development Guidelines - CheckliststSITE DEVELOPMENT GUIDELINES AND APPLICATIONS rev 4-07.doc