HomeMy WebLinkAboutDRAINAGE NARRATIVE 5-14-2009TOWNS ENGINEERING, INC, PROFESSIONAL ENGINEERS • LAND SURVEYORS • EXPERT WITNESS MAIL: P.O. BOX 162 SOUTH WINDHAM, CT 06266 OFFICE: 1 RICHMOND LANE, WILLIMANTIC, CT 06226 (860) 423-6371 • (860) 889-2100 • Fax (860) 423-5470 Drainage Narrative Prepared for Tony Morizio dot's 28 & 38 Thomas Ave Montville, Connecticut May 14, 2009 Prepared by Towne Engineering, Inc. P.O. Box 162 South Windham, CT 06266 T.E.I. Job No. 08-83/84 DONALD R. AUBREY,, P.E., L.S. JOSEPH H. BOUCHER, M.S., L.S. MATTHEW D. MAYNARD, E.I.T. Page 2 This narrative is intended to provide a review of the onsite stormwater mitigation measures currently proposed for the development of two residential dwellings each with onsite septic systems, and drinking water wells. Each site is located at the top of a hill in a relatively flat potion of the topography where surface runoff drains to the northwest and southeast, based on the enclosed USGS map, and as a result have no uphill watershed contributing to either of these two project sites. Currently these two sites are vegetated by a mixture of hardwoods and lawns, and are underlain by well -drained Paxton & Montauk soils based on the NRCS Web Soil Survey. To mitigate any stormwater flow increases that may migrate off each site during the post development conditions, we have proposed a series of yard drains and roof leaders which eventually direct stormwater into leaching chambers surrounded by stone which will detain and infiltrate the small amount of additional stormwater generated by this proposed development. Page 3 Pre -development Condition Lot #28 Thomas Ave, Montville 100 year storm analysis Drainage Area: 10,400 sq. ft. / 0.24 Ac. Time of Concentration: Very small contributing watershed Using: Tc = 5 min Runoff Coefficient: Item "C Area Grass/woods 0.25 10,400 sq. ft. Cw=0.25 Rainfall Intensity: 100 Year Storm & Tc = 5 min I = 7.8 in/hr. Peak Flow: Q(100) = CIA = 7.8 in/hr (0.24 Ac.) 0.25 Q(100) = 0.47 cfs Peak Flow Volume: Tc = 5 min, Tt = 12.5 min, Q(100) = 0.47 cfs Volume =''/2 [Qp * Tt * 60 min/sec] = 176.3 cubic feet Post -development Condition Lot #28 Thomas Ave, Montville 100 year storm analysis Area: O-1 10,400 sq. ft. / 0.24 Ac. Time of Concentration: Contributing watershed now contains impervious (roofed) surface Using: Tc = 5 min Runoff Coefficient: Page 4 Item "C Area Grass 0.25 9,250 sq. ft. Buildings 1.0 1,150 sq. ft. Cw=0.33 Rainfall Intensity: 100 Year Storm & Tc = 5 min I = 7.8 in/hr. Peak Flow: Q(100) = CIA = 7.8 in/hr (0.24 Ac.) 0.33 Q(100) = 0.62 cfs Peak Flow Volume: Tc = 5 min, Tt = 12.5 min, Q(100) = 0.62 cfs Volume =''/z [Qp * Tt * 60 min/sec] = 232.5 cubic feet Proposed stormwater control: Proposing: 16 linear feet 12 inch tall concrete galleries with I foot of stone on the perimeter Proposed Dry Storage Capacity: Infiltration Trench Capacity: Galleries: L*w*h=16ft* 4ft,*1ft,=64.0cu.ft. Stone Volume: (utilizing 50% pore space) L*w*h*50%=44ft*1ft.*1ft.*0.5=22.0cu. ft. Total Dry Storage: Item Ca acit Galleries 64.0 cu. ft. Infiltration stone 22.0 cu ft Total proposed dry storage 86.0 cu. ft. Conclusion: The proposed design is acceptable since the difference between the preconstruction and post construction peak 100 year storm volume is 56.2 cubic feet, and the capacity of our proposed stormwater storage and leaching system is 86 cubic feet. Therefore, the proposed stormwater system as designed has the capacity to detain and infiltrate enough stormwater to reduce stormwater runoff to below predevelopment levels, will not produce any increase in runoff from this site in a 100 year peak storm event, and will actually decrease stormwater flows below their predevelopment levels in all storm below the 100 year frequency storm event. Page 5 Pre -development Condition Lot #36 Thomas Ave, Montville 100 year storm analysis Drainage Area: 9,300 sq. ft. / 0.21 Ac. Time of Concentration: Very small contributing watershed Using: Tc = 5 min Runoff Coefficient: Item ..C" Area Grass/woods 0.25 9,300 sq. ft. Cw=0.25 Rainfall Intensity: 100 Year Storm & Tc = 5 min I = 7.8 in/hr. Peak Flow: Q(100) = CIA = 7.8 in/hr (0.21 Ac.) 0.25 Q(100) = 0.41 cfs Peak Flow Volume: Tc = 5 min, Tt = 12.5 min, Q(100) = 0.41 cfs Volume =''/2 [Qp * Tt * 60 min/sec) = 153.8 cubic feet Post -development Condition Lot #36 Thomas Ave, Montville 100 year storm analysis Area: O-1 9,300 sq. ft. / 0.21 Ac. Time of Concentration: Contributing watershed now contains impervious (roofed) surface Using: Tc = 5 min Runoff Coefficient: Item "C" Area Page 6 Grass 0.25 8,250 sq. ft. Buildings 1.0 1,050 sq. ft. Cw=0.33 Rainfall Intensity: 100 Year Storm & Tc = 5 min I = 7.8 in/hr. Peak Flow: Q(100) = CIA = 7.8 in/hr (0.21 Ac.) 0.33 Q(100) = 0.54 cfs Peak Flow Volume: Tc = 5 min, Tt = 12.5 min, Q(100) = 0.54 cfs Volume =''/2 [Qp * Tt * 60 min/sec] = 202.5 cubic feet Proposed stormwater control: Proposing: 16 linear feet 12 inch tall concrete galleries with I foot of stone on the perimeter Proposed Dry Storage Capacity: Infiltration Trench Capacity: Galleries: L * w * h = 16 ft * 4 ft.* 1 f t. = 64.0 cu. ft. Stone Volume: (utilizing 50% pore space) L*w*h* 50% = 44 ft* 1 ft.* 1 ft.* 0.5 = 22.Ocu.ft. Total Dry Storage: Item Galleries CapacitX 64.0 cu. ft. Infiltration stone 22.0 cu. ft. Total proposed dry storage 86.0 cu. ft. Conclusion: The proposed design is acceptable since the difference between the preconstruction and post construction peak 100 year storm volume is 48.7 cubic feet, and the capacity of our proposed stormwater storage and leaching system is 86 cubic feet. Therefore, the proposed stormwater system as designed has the capacity to detain and infiltrate enough stormwater to reduce stormwater runoff to below predevelopment levels, will not produce any increase in runoff from this site in a 100 year peak storm event, and will actually decrease stormwater flows below predevelopment levels in all storms below the 100 year frequency storm event. 119E 27'