MEMORANDUM FOR THE RECORD
APPLICATION# 25 IWC 16
REGULAR MEETING – THURSDAY, SEPTEMBER 18, 2025
Prepared by Stacy Radford, Zoning & Wetlands Officer
Owner/Applicant: Ebadath Chowdhoury
Address: Glen Road, (055-051-00A), Uncasville
Date of Receipt: July 16, 2025
Date Received by IWC: July 17, 2025 (DRD – September 20, 2025)
Applicant Request: Regulated activities within the wetlands and upland review area in
conjunction with the construction of a single family residence.
Activity Description:
Wetland Disturbance Area 4200 sq ft (per Applicant) Watercourse/Waterbody Disturbance Area 0 LF (per Applicant) Upland Review Disturbance Area 6500 sq ft (per Applicant)
STAFF COMMENTS IN REVIEW:
• This Application is for regulated activities within the wetlands and upland review area in
conjunction with the proposed construction of a single family residence, located in the R-
20 Zoning District.
• The property is located on 11.5 acres and is currently undeveloped.
• The Applicant proposes to construct a 5-bedroom single family residence with a
sunroom, 2 porches and an attached garage; along with the installation of a 1500 gallon
concrete septic tank with 2-D boxes and leach fields, a well; and the construction of a
retaining wall, a walkway and a driveway. There will also be a few drainage features
installed including, a curtain drain constructed of 6” pvc attached to it, a rip-rap inlet with
a 12” HDPE pipe which leads to a rip-rap drainage outlet, and a footing drain. All of this
work would be conducted outside of the 50’ upland review area.
• The Applicant proposes some development located within the 50’ upland review and
which would include the rip-rap outlet for a slope drain and part of the driveway. This
would account for 6500 sq ft of disturbance.
• The Applicant also proposes the construction of a driveway which that would cause 4200
sq ft of disturbance within the regulated wetland area. This construction would include
the installation of a modified rip-rap inlet on the side of the driveway with a round 12”
concrete pipe going under the driveway feeding to a rip-rap outlet. This would help to
redirect stormwater away from the driveway.
• The Applicant proposes the use of an excavator for grading and for the installation of the
driveway and septic system. Large trucks and a drill rig will also be needed to transport
fill and to install the well. All soil removed during the grading process will be stockpiled
onsite, outside of the 50’ upland review area.
• The wetlands were delineated by Robert Russo, Certified Soil Scientist in January of
2025 and are shown on the Plan submitted with this Application and entitled: “Site Plan
prepared for Ebadath Chowdhoury Glen Road, Montville, CT 06382, dated May 30, 2025
revised August 14, 2025.”
H:\IWC\Applications\2025\25IWC16 - Glen Rd (const of SFR; regulated activities)\Staff\25IWC16 - Glen Road Staff Report 3 9-18-2025.docx
• This Application was referred to Ian Cole, Certified Soil Scientist on behalf of the Town
for review on July 16, 2025 and comments were received on August 14, 2025, a copy of
which are attached hereto. The comments stated in part that a double row of E&S control
measures be installed around the 50’ upland review area. The Applicant has revised the
Plans to reflect this recommendation. Mr. Cole also mentioned that the wetland flags
have degraded and he suggests the wetland boundary be re-flagged to be certain it is
visible to contractors and inspectors during the construction process. These comments
were forwarded to the Applicant for response.
AGENCY COMMENTS:
• Town Soil Scientist – The referral for comments was forwarded on July 16, 2025 and
comments were received on August 14, 2025. The Applicant revised the Plan pursuant to
the above comments and the Town Soil Scientist sent an email on August 21, 2025
indicating that he had “no further comments”.
NEW STAFF COMMENTS:
• A site walk was conducted on Wednesday, September 17, 2025 at 5:30 p.m. Chairman
Brush and Commissioner LeClair were in attendance on behalf of the IWC and
Kyle Lynch, Soil Scientist of CLA Engineers, Inc.; on behalf of the Applicant was
also in attendance.
CONSIDERATIONS FOR ACTION:
If the Commission is inclined to approve the request of the Applicant for a permit for proposed
activity, the following language for a Motion of Approval is suggested:
After giving due consideration to all relevant factors including those in Section 10 and/or Section
6 of the Montville Inland Wetlands and Watercourses Regulations and Section 22a-41 of the
Connecticut General Statutes, I move to approve application number 25 IWC 16 –
Owner/Applicant: Ebadath Chowdhoury for regulated activities within the wetlands and upland
review areas associated with the construction of a single family residence, per the Application and
associated documents submitted on July 16, 2025 and plan titled, “Glen Road, Montville, CT 06382
Site Plan Prepared for Ebadath Chowdhoury, dated 5/30/2025, revised 8/14/2025”; with the
following conditions:
1. All wetland boundaries be re-flagged before construction for visibility to contractors and
inspectors during the construction phase. Standard reasons for approval and standard conditions of approval apply.
If the Commission chooses to deny said Application, reasons for denial must be stated.