HomeMy WebLinkAbout25SITE1 - Building Comments 02-05-2025Building Official’s Comments
Date: 02/05/2025
Project Address: 2 and 8 Enterprise La
Project Name: PVC Direct
Reviewer: Doug Colter, Building Official
Upon review of land use documents submitted to the town planning officials, the Building
Official notes the following:
1.) Building, Electrical, Plumbing, and Mechanical permits required
2.) Site drainage plumbing installa�on is regulated by the CT State Building Code, permit
required.
3.) Accessible parking, the route from the accessible parking, striping, and any signage are
regulated by the CT State Building Code. Permit required.
4.) All site ligh�ng is subject to the CT State Building Code, and shall be “full cut off” (aka
dark sky compliant)
5.) A Change of Use permit is required
6.) A dust hazard analysis is required, which may impact electrical, and ven�la�on
requirements.
7.) Storage of commodity to be iden�fied, including amounts
8.) A complete set of construc�on documents will be required for a more thorough plan
review.
These comments should be considered a preliminary courtesy review, and not a thorough review under the auspices
of the CT State Building Code. These are not exhaustive or limiting comments, do not create an estoppel for any
code or statutory requirement, and are not an approval to begin work. A formal Building Permit application
accompanied by Construction Documents per CT State Statutes and the CT State Building Code are required for a
formal review, and work is not authorized until a Building Permit is issued by the Building Official. It is the
applicant’s responsibility to coordinate State and Town requirements at the time of application for approvals.