GREEN SITE DESIGN
DRAINAGE CALCULATIONS,
HYDRAULICS & HYDROLOGY REPORT
PVC DIRECT
2 & 8 ENTERPRISE LANE
OAKDALE, CT
FEBRUARY 5, 2025
H-1
DRAINAGE HYDRAULICS AND HYDROLOGY REPORT
PVC DIRECT SITE PLAN
2 ENTERPRISE LANE
EXISTING CONDITIONS
The site is approximately 0.94 acres in area and is shown on the Existing
Conditions Survey (Sheet 1 of the site plans). The site has frontage on Lakewood Drive
and Enterprise Lane. There are no wetlands on the site.
PROPOSED DEVELOPMENT
The proposed project is a modification to a previously approved site plan from
March of 2023. The modified plan’s site layout will mostly remain the same as the
previously approved site plan besides for the addition of two access roads to the
neighboring site, 8 Enterprise Lane.
EXISTING AND PROPOSED HYDRAULICS
The current site contains just one 0.94 acre drainage area. After development is
complete, the site will be divided into two drainage areas.
Drainage Area 1 is 0.77 acres and contains the majority of the site including the
parking lot, loading docks, and green areas. Runoff from the sites paved areas will flow
into catch basins that lead to the existing drainage system on Lakewood Drive. Before
connecting into the existing drainage system, the stormwater coming from the on-site
catch basins will be treated by an oil-water separator.
Drainage Area 2 is 0.17 acres and only contains the proposed building. In order to
reduce the amount of stormwater leaving the site, the clean runoff from the roof will
outlet into an underground infiltration gallery.
Both the existing and the proposed conditions for the development site have been
analyzed for the 2-year, 10-year, 25-year, 50-year, and 100 year design storms using the
Rational Method. The following is the summary table for the 2-year, 10-year, 25-year,
H-2
50-year, and 100-year design storms showing first the existing conditions and proposed
conditions:
2 Year 10 Year 25 Year 50 Year 100 Year
Existing Drainage
Area 1.36 cfs 2.03 cfs 2.45 cfs 2.75 cfs 3.10 cfs
Proposed
Drainage Area 1 1.86 cfs 2.76 cfs 3.34 cfs 3.76 cfs 4.23 cfs
Proposed
Drainage Area 2 0.00 cfs 0.00 cfs 0.00 cfs 0.00 cfs 0.00 cfs
Proposed 1.86 cfs 2.76 cfs 3.34 cfs 3.76 cfs 4.23 cfs
The drainage calculations show an insignificant increase in peak stormwater
leaving the site after the development is completed. The drainage system in Lakewood
Drive was designed as part of the subdivision, which created the industrial zoned lots
along Lakewood Drove and Enterprise Lane. The drainage system was designed to
handle the flows from industrial uses on the lots, and can handle the insignificant
increases in stormwater flows from this development. As the site is less than an acre and
will not disturb more then an acre of land, a sedimentation trap/ Erosion and
Sedimentation Plan is not required as per Section 4.10.5 of the Zoning Regulations and
the CT Guidelines for Soil Erosion and Sediment Control.
H-3
8 ENTERPRISE LANE
EXISTING CONDITIONS
The site is approximately 0.93 acres in area and is shown on the Existing
Conditions Survey (Sheet 1 of the site plans). The site has frontage on Enterprise Lane.
There are no wetlands on the site.
PROPOSED DEVELOPMENT
The project proposes a modification to an existing site plan. The site is currently
home to a building with a 4,200 SF footprint. There will be no disturbance to the
bituminous concrete parking area in the front of the site. The project proposes the
addition of a loading dock on the northwest side of the building and an access drive in the
rear of the building. Both the loading dock and access drive will be accessed from 2
Enterprise Lane. The existing building will remain on the site but will be modified to
better suit the intended use of the building. Besides for the addition of the loading dock
and an overhead door in the rear of the building, all of the modifications to the building
will take place inside. There is also some proposed grading and clearing in the rear of the
site.
EXISTING AND PROPOSED HYDRAULICS
The current site contains two existing drainage areas. Existing Drainage Area 1 is
0.51 Acres and includes both the existing building and the grass and wooded area behind
the building. The building has roof leaders that outfall behind the building.
Existing Drainage Area 2 is 0.42 Acres and contains the grass area in the front
and the parking area. The runoff from the parking area flows into a catch basin that then
flows into Enterprise Lane/Lakewood Drive drainage system.
The proposed site can also be split into two proposed drainage areas. Proposed
Drainage Area 1 is 0.53 Acres and includes the existing building, the rear grass and
wooded area, and the proposed rear access drive. The runoff from the access drive will
H-4
flow into the woods behind the site and will be treated as it flows through the grass and
the wooded area.
Proposed Drainage Area 2 is 0.40 Acres and contains the front parking lot, the
front grass area, and the proposed loading dock. The proposed loading dock flows into
the drainage system for 2 Enterprise Lane and eventually flows into the Enterprise
Lane/Lakewood Drive drainage system. The rest of Proposed Drainage Area 1 will
continue to flow into the Enterprise Lane/Lakewood Drive drainage system as it currently
does.
Both the existing and the proposed conditions for the development site have been
analyzed for the 2-year, 10-year, 25-year, 50-year, and 100 year design storms using the
Rational Method. The following is the summary table for the 2-year, 10-year, 25-year,
50-year, and 100-year design storms showing first the existing conditions and proposed
conditions:
2 Year 10 Year 25 Year 50 Year 100 Year
Existing Drainage
Area 1 0.49 cfs 0.74 cfs 0.89 cfs 1.00 cfs 1.12 cfs
Proposed
Drainage Area 1 0.57 cfs 0.85 cfs 1.03 cfs 1.16 cfs 1.30 cfs
Existing Drainage
Area 2 1.03 cfs 1.54 cfs 1.86 cfs 2.09 cfs 2.35 cfs
Proposed
Drainage Area 2 1.07 cfs 1.60 cfs 1.93 cfs 2.17 cfs 2.45 cfs
Similar to the previously approved drainage calculations for 2 Enterprise Lane,
the drainage calculations show an insignificant increase in peak stormwater leaving the
site after the development is completed. The drainage system in Lakewood Drive was
designed as part of the subdivision, which created the industrial zoned lots along
Lakewood Drove and Enterprise Lane. The drainage system was designed to handle the
flows from industrial uses on the lots, and can handle the insignificant increases in
stormwater flows from this development. As the site is less than an acre and will not
H-5
disturb more then an acre of land, a sedimentation trap/ Erosion and Sedimentation Plan
is not required as per Section 4.10.5 of the Zoning Regulations and the CT Guidelines
for Soil Erosion and Sediment Control.
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 1
2 Ent: Existing Area 1
Hydrograph type = Rational Peak discharge = 1.361 cfs
Storm frequency = 2 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 408 cuft
Drainage area = 0.940 ac Runoff coeff.= 0.3
Intensity = 4.828 in/hr Tc by User = 5.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
1
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
2 Ent: Existing Area 1
Hyd. No. 1 -- 2 Year
Hyd No. 1
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 2
2 Ent: Building 1
Hydrograph type = Rational Peak discharge = 0.739 cfs
Storm frequency = 2 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 222 cuft
Drainage area = 0.170 ac Runoff coeff. = 0.9
Intensity = 4.828 in/hr Tc by User = 5.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
2
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
0.10 0.10
0.20 0.20
0.30 0.30
0.40 0.40
0.50 0.50
0.60 0.60
0.70 0.70
0.80 0.80
0.90 0.90
1.00 1.00
Q (cfs)
Time (min)
2 Ent: Building 1
Hyd. No. 2 -- 2 Year
Hyd No. 2
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 3
2 Ent: Infiltration
Hydrograph type = Reservoir Peak discharge = 0.000 cfs
Storm frequency = 2 yrs Time to peak = n/a
Time interval = 1 min Hyd. volume = 0 cuft
Inflow hyd. No. = 2 - 2 Ent: Building 1 Max. Elevation = 251.17 ft
Reservoir name = Infiltration Max. Storage = 222 cuft
Storage Indication method used.
3
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
0.10 0.10
0.20 0.20
0.30 0.30
0.40 0.40
0.50 0.50
0.60 0.60
0.70 0.70
0.80 0.80
0.90 0.90
1.00 1.00
Q (cfs)
Time (min)
2 Ent: Infiltration
Hyd. No. 3 -- 2 Year
Hyd No. 3 Hyd No. 2 Total storage used = 222 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 4
2 Ent: Proposed Area 1
Hydrograph type = Rational Peak discharge = 1.859 cfs
Storm frequency = 2 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 558 cuft
Drainage area = 0.770 ac Runoff coeff. = 0.5*
Intensity = 4.828 in/hr Tc by User = 5.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.440 x 0.90) + (0.330 x 0.20)] / 0.770
4
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
2 Ent: Proposed Area 1
Hyd. No. 4 -- 2 Year
Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 5
8 Ent: Existing Area 1
Hydrograph type = Rational Peak discharge = 0.493 cfs
Storm frequency = 2 yrs Time to peak = 15 min
Time interval = 1 min Hyd. volume = 444 cuft
Drainage area = 0.510 ac Runoff coeff. = 0.34*
Intensity = 2.845 in/hr Tc by TR55 = 15.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.100 x 0.90) + (0.410 x 0.20)] / 0.510
5
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (min)
8 Ent: Existing Area 1
Hyd. No. 5 -- 2 Year
Hyd No. 5
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 6
8 Ent: Existing Area 2
Hydrograph type = Rational Peak discharge = 1.034 cfs
Storm frequency = 2 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 372 cuft
Drainage area = 0.420 ac Runoff coeff. = 0.55*
Intensity = 4.476 in/hr Tc by User = 6.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.210 x 0.90) + (0.210 x 0.20)] / 0.420
6
0 1 2 3 4 5 6 7 8 9 10 11 12
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
8 Ent: Existing Area 2
Hyd. No. 6 -- 2 Year
Hyd No. 6
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 7
8 Ent: Poposed Area 1
Hydrograph type = Rational Peak discharge = 0.573 cfs
Storm frequency = 2 yrs Time to peak = 15 min
Time interval = 1 min Hyd. volume = 516 cuft
Drainage area = 0.530 ac Runoff coeff. = 0.38*
Intensity = 2.845 in/hr Tc by User = 15.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.140 x 0.90) + (0.390 x 0.20)] / 0.530
7
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
Q (cfs)
0.00 0.00
0.10 0.10
0.20 0.20
0.30 0.30
0.40 0.40
0.50 0.50
0.60 0.60
0.70 0.70
0.80 0.80
0.90 0.90
1.00 1.00
Q (cfs)
Time (min)
8 Ent: Poposed Area 1
Hyd. No. 7 -- 2 Year
Hyd No. 7
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 8
8 Ent: Proposed Area 2
Hydrograph type = Rational Peak discharge = 1.074 cfs
Storm frequency = 2 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 387 cuft
Drainage area = 0.400 ac Runoff coeff. = 0.6*
Intensity = 4.476 in/hr Tc by User = 6.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.230 x 0.90) + (0.170 x 0.20)] / 0.400
8
0 1 2 3 4 5 6 7 8 9 10 11 12
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
8 Ent: Proposed Area 2
Hyd. No. 8 -- 2 Year
Hyd No. 8
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 1
2 Ent: Existing Area 1
Hydrograph type = Rational Peak discharge = 2.033 cfs
Storm frequency = 10 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 610 cuft
Drainage area = 0.940 ac Runoff coeff. = 0.3
Intensity = 7.208 in/hr Tc by User = 5.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
9
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
2 Ent: Existing Area 1
Hyd. No. 1 -- 10 Year
Hyd No. 1
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 2
2 Ent: Building 1
Hydrograph type = Rational Peak discharge = 1.103 cfs
Storm frequency = 10 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 331 cuft
Drainage area = 0.170 ac Runoff coeff. = 0.9
Intensity = 7.208 in/hr Tc by User = 5.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
10
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
2 Ent: Building 1
Hyd. No. 2 -- 10 Year
Hyd No. 2
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 3
2 Ent: Infiltration
Hydrograph type = Reservoir Peak discharge = 0.000 cfs
Storm frequency = 10 yrs Time to peak = n/a
Time interval = 1 min Hyd. volume = 0 cuft
Inflow hyd. No. = 2 - 2 Ent: Building 1 Max. Elevation = 252.31 ft
Reservoir name = Infiltration Max. Storage = 331 cuft
Storage Indication method used.
11
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
2 Ent: Infiltration
Hyd. No. 3 -- 10 Year
Hyd No. 3 Hyd No. 2 Total storage used = 331 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 4
2 Ent: Proposed Area 1
Hydrograph type = Rational Peak discharge = 2.775 cfs
Storm frequency = 10 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 833 cuft
Drainage area = 0.770 ac Runoff coeff. = 0.5*
Intensity = 7.208 in/hr Tc by User = 5.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.440 x 0.90) + (0.330 x 0.20)] / 0.770
12
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
2 Ent: Proposed Area 1
Hyd. No. 4 -- 10 Year
Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 5
8 Ent: Existing Area 1
Hydrograph type = Rational Peak discharge = 0.736 cfs
Storm frequency = 10 yrs Time to peak = 15 min
Time interval = 1 min Hyd. volume = 662 cuft
Drainage area = 0.510 ac Runoff coeff. = 0.34*
Intensity = 4.242 in/hr Tc by TR55 = 15.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.100 x 0.90) + (0.410 x 0.20)] / 0.510
13
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
Q (cfs)
0.00 0.00
0.10 0.10
0.20 0.20
0.30 0.30
0.40 0.40
0.50 0.50
0.60 0.60
0.70 0.70
0.80 0.80
0.90 0.90
1.00 1.00
Q (cfs)
Time (min)
8 Ent: Existing Area 1
Hyd. No. 5 -- 10 Year
Hyd No. 5
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 6
8 Ent: Existing Area 2
Hydrograph type = Rational Peak discharge = 1.544 cfs
Storm frequency = 10 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 556 cuft
Drainage area = 0.420 ac Runoff coeff. = 0.55*
Intensity = 6.682 in/hr Tc by User = 6.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.210 x 0.90) + (0.210 x 0.20)] / 0.420
14
0 1 2 3 4 5 6 7 8 9 10 11 12
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
8 Ent: Existing Area 2
Hyd. No. 6 -- 10 Year
Hyd No. 6
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 7
8 Ent: Poposed Area 1
Hydrograph type = Rational Peak discharge = 0.854 cfs
Storm frequency = 10 yrs Time to peak = 15 min
Time interval = 1 min Hyd. volume = 769 cuft
Drainage area = 0.530 ac Runoff coeff. = 0.38*
Intensity = 4.242 in/hr Tc by User = 15.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.140 x 0.90) + (0.390 x 0.20)] / 0.530
15
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
Q (cfs)
0.00 0.00
0.10 0.10
0.20 0.20
0.30 0.30
0.40 0.40
0.50 0.50
0.60 0.60
0.70 0.70
0.80 0.80
0.90 0.90
1.00 1.00
Q (cfs)
Time (min)
8 Ent: Poposed Area 1
Hyd. No. 7 -- 10 Year
Hyd No. 7
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 8
8 Ent: Proposed Area 2
Hydrograph type = Rational Peak discharge = 1.604 cfs
Storm frequency = 10 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 577 cuft
Drainage area = 0.400 ac Runoff coeff. = 0.6*
Intensity = 6.682 in/hr Tc by User = 6.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.230 x 0.90) + (0.170 x 0.20)] / 0.400
16
0 1 2 3 4 5 6 7 8 9 10 11 12
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
8 Ent: Proposed Area 2
Hyd. No. 8 -- 10 Year
Hyd No. 8
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 1
2 Ent: Existing Area 1
Hydrograph type = Rational Peak discharge = 2.447 cfs
Storm frequency = 25 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 734 cuft
Drainage area = 0.940 ac Runoff coeff. = 0.3
Intensity = 8.678 in/hr Tc by User = 5.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
17
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
2 Ent: Existing Area 1
Hyd. No. 1 -- 25 Year
Hyd No. 1
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 2
2 Ent: Building 1
Hydrograph type = Rational Peak discharge = 1.328 cfs
Storm frequency = 25 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 398 cuft
Drainage area = 0.170 ac Runoff coeff. = 0.9
Intensity = 8.678 in/hr Tc by User = 5.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
18
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
2 Ent: Building 1
Hyd. No. 2 -- 25 Year
Hyd No. 2
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 3
2 Ent: Infiltration
Hydrograph type = Reservoir Peak discharge = 0.000 cfs
Storm frequency = 25 yrs Time to peak = n/a
Time interval = 1 min Hyd. volume = 0 cuft
Inflow hyd. No. = 2 - 2 Ent: Building 1 Max. Elevation = 252.98 ft
Reservoir name = Infiltration Max. Storage = 398 cuft
Storage Indication method used.
19
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
2 Ent: Infiltration
Hyd. No. 3 -- 25 Year
Hyd No. 3 Hyd No. 2 Total storage used = 398 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 4
2 Ent: Proposed Area 1
Hydrograph type = Rational Peak discharge = 3.341 cfs
Storm frequency = 25 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 1,002 cuft
Drainage area = 0.770 ac Runoff coeff. = 0.5*
Intensity = 8.678 in/hr Tc by User = 5.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.440 x 0.90) + (0.330 x 0.20)] / 0.770
20
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (min)
2 Ent: Proposed Area 1
Hyd. No. 4 -- 25 Year
Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 5
8 Ent: Existing Area 1
Hydrograph type = Rational Peak discharge = 0.885 cfs
Storm frequency = 25 yrs Time to peak = 15 min
Time interval = 1 min Hyd. volume = 797 cuft
Drainage area = 0.510 ac Runoff coeff. = 0.34*
Intensity = 5.105 in/hr Tc by TR55 = 15.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.100 x 0.90) + (0.410 x 0.20)] / 0.510
21
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
Q (cfs)
0.00 0.00
0.10 0.10
0.20 0.20
0.30 0.30
0.40 0.40
0.50 0.50
0.60 0.60
0.70 0.70
0.80 0.80
0.90 0.90
1.00 1.00
Q (cfs)
Time (min)
8 Ent: Existing Area 1
Hyd. No. 5 -- 25 Year
Hyd No. 5
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 6
8 Ent: Existing Area 2
Hydrograph type = Rational Peak discharge = 1.858 cfs
Storm frequency = 25 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 669 cuft
Drainage area = 0.420 ac Runoff coeff. = 0.55*
Intensity = 8.042 in/hr Tc by User = 6.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.210 x 0.90) + (0.210 x 0.20)] / 0.420
22
0 1 2 3 4 5 6 7 8 9 10 11 12
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
8 Ent: Existing Area 2
Hyd. No. 6 -- 25 Year
Hyd No. 6
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 7
8 Ent: Poposed Area 1
Hydrograph type = Rational Peak discharge = 1.028 cfs
Storm frequency = 25 yrs Time to peak = 15 min
Time interval = 1 min Hyd. volume = 925 cuft
Drainage area = 0.530 ac Runoff coeff. = 0.38*
Intensity = 5.105 in/hr Tc by User = 15.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.140 x 0.90) + (0.390 x 0.20)] / 0.530
23
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
8 Ent: Poposed Area 1
Hyd. No. 7 -- 25 Year
Hyd No. 7
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 8
8 Ent: Proposed Area 2
Hydrograph type = Rational Peak discharge = 1.930 cfs
Storm frequency = 25 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 695 cuft
Drainage area = 0.400 ac Runoff coeff. = 0.6*
Intensity = 8.042 in/hr Tc by User = 6.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.230 x 0.90) + (0.170 x 0.20)] / 0.400
24
0 1 2 3 4 5 6 7 8 9 10 11 12
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
8 Ent: Proposed Area 2
Hyd. No. 8 -- 25 Year
Hyd No. 8
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 1
2 Ent: Existing Area 1
Hydrograph type = Rational Peak discharge = 2.754 cfs
Storm frequency = 50 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 826 cuft
Drainage area = 0.940 ac Runoff coeff. = 0.3
Intensity = 9.765 in/hr Tc by User = 5.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
25
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
2 Ent: Existing Area 1
Hyd. No. 1 -- 50 Year
Hyd No. 1
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 2
2 Ent: Building 1
Hydrograph type = Rational Peak discharge = 1.494 cfs
Storm frequency = 50 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 448 cuft
Drainage area = 0.170 ac Runoff coeff. = 0.9
Intensity = 9.765 in/hr Tc by User = 5.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
26
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
2 Ent: Building 1
Hyd. No. 2 -- 50 Year
Hyd No. 2
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 3
2 Ent: Infiltration
Hydrograph type = Reservoir Peak discharge = 0.000 cfs
Storm frequency = 50 yrs Time to peak = n/a
Time interval = 1 min Hyd. volume = 0 cuft
Inflow hyd. No. = 2 - 2 Ent: Building 1 Max. Elevation = 253.48 ft
Reservoir name = Infiltration Max. Storage = 448 cuft
Storage Indication method used.
27
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
2 Ent: Infiltration
Hyd. No. 3 -- 50 Year
Hyd No. 3 Hyd No. 2 Total storage used = 448 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 4
2 Ent: Proposed Area 1
Hydrograph type = Rational Peak discharge = 3.759 cfs
Storm frequency = 50 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 1,128 cuft
Drainage area = 0.770 ac Runoff coeff. = 0.5*
Intensity = 9.765 in/hr Tc by User = 5.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.440 x 0.90) + (0.330 x 0.20)] / 0.770
28
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (min)
2 Ent: Proposed Area 1
Hyd. No. 4 -- 50 Year
Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 5
8 Ent: Existing Area 1
Hydrograph type = Rational Peak discharge = 1.000 cfs
Storm frequency = 50 yrs Time to peak = 15 min
Time interval = 1 min Hyd. volume = 900 cuft
Drainage area = 0.510 ac Runoff coeff. = 0.34*
Intensity = 5.766 in/hr Tc by TR55 = 15.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.100 x 0.90) + (0.410 x 0.20)] / 0.510
29
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
Q (cfs)
0.00 0.00
0.10 0.10
0.20 0.20
0.30 0.30
0.40 0.40
0.50 0.50
0.60 0.60
0.70 0.70
0.80 0.80
0.90 0.90
1.00 1.00
Q (cfs)
Time (min)
8 Ent: Existing Area 1
Hyd. No. 5 -- 50 Year
Hyd No. 5
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 6
8 Ent: Existing Area 2
Hydrograph type = Rational Peak discharge = 2.092 cfs
Storm frequency = 50 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 753 cuft
Drainage area = 0.420 ac Runoff coeff. = 0.55*
Intensity = 9.058 in/hr Tc by User = 6.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.210 x 0.90) + (0.210 x 0.20)] / 0.420
30
0 1 2 3 4 5 6 7 8 9 10 11 12
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
8 Ent: Existing Area 2
Hyd. No. 6 -- 50 Year
Hyd No. 6
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 7
8 Ent: Poposed Area 1
Hydrograph type = Rational Peak discharge = 1.161 cfs
Storm frequency = 50 yrs Time to peak = 15 min
Time interval = 1 min Hyd. volume = 1,045 cuft
Drainage area = 0.530 ac Runoff coeff. = 0.38*
Intensity = 5.766 in/hr Tc by User = 15.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.140 x 0.90) + (0.390 x 0.20)] / 0.530
31
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
8 Ent: Poposed Area 1
Hyd. No. 7 -- 50 Year
Hyd No. 7
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 8
8 Ent: Proposed Area 2
Hydrograph type = Rational Peak discharge = 2.174 cfs
Storm frequency = 50 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 783 cuft
Drainage area = 0.400 ac Runoff coeff. = 0.6*
Intensity = 9.058 in/hr Tc by User = 6.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.230 x 0.90) + (0.170 x 0.20)] / 0.400
32
0 1 2 3 4 5 6 7 8 9 10 11 12
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
8 Ent: Proposed Area 2
Hyd. No. 8 -- 50 Year
Hyd No. 8
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 1
2 Ent: Existing Area 1
Hydrograph type = Rational Peak discharge = 3.101 cfs
Storm frequency = 100 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 930 cuft
Drainage area = 0.940 ac Runoff coeff. = 0.3
Intensity = 10.995 in/hr Tc by User = 5.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
33
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (min)
2 Ent: Existing Area 1
Hyd. No. 1 -- 100 Year
Hyd No. 1
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 2
2 Ent: Building 1
Hydrograph type = Rational Peak discharge = 1.682 cfs
Storm frequency = 100 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 505 cuft
Drainage area = 0.170 ac Runoff coeff. = 0.9
Intensity = 10.995 in/hr Tc by User = 5.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
34
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
2 Ent: Building 1
Hyd. No. 2 -- 100 Year
Hyd No. 2
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 3
2 Ent: Infiltration
Hydrograph type = Reservoir Peak discharge = 0.000 cfs
Storm frequency = 100 yrs Time to peak = n/a
Time interval = 1 min Hyd. volume = 0 cuft
Inflow hyd. No. = 2 - 2 Ent: Building 1 Max. Elevation = 254.05 ft
Reservoir name = Infiltration Max. Storage = 505 cuft
Storage Indication method used.
35
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
2 Ent: Infiltration
Hyd. No. 3 -- 100 Year
Hyd No. 3 Hyd No. 2 Total storage used = 505 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 4
2 Ent: Proposed Area 1
Hydrograph type = Rational Peak discharge = 4.233 cfs
Storm frequency = 100 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 1,270 cuft
Drainage area = 0.770 ac Runoff coeff. = 0.5*
Intensity = 10.995 in/hr Tc by User = 5.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.440 x 0.90) + (0.330 x 0.20)] / 0.770
36
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
Q (cfs)
Time (min)
2 Ent: Proposed Area 1
Hyd. No. 4 -- 100 Year
Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 5
8 Ent: Existing Area 1
Hydrograph type = Rational Peak discharge = 1.122 cfs
Storm frequency = 100 yrs Time to peak = 15 min
Time interval = 1 min Hyd. volume = 1,010 cuft
Drainage area = 0.510 ac Runoff coeff. = 0.34*
Intensity = 6.471 in/hr Tc by TR55 = 15.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.100 x 0.90) + (0.410 x 0.20)] / 0.510
37
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
8 Ent: Existing Area 1
Hyd. No. 5 -- 100 Year
Hyd No. 5
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 6
8 Ent: Existing Area 2
Hydrograph type = Rational Peak discharge = 2.355 cfs
Storm frequency = 100 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 848 cuft
Drainage area = 0.420 ac Runoff coeff. = 0.55*
Intensity = 10.194 in/hr Tc by User = 6.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.210 x 0.90) + (0.210 x 0.20)] / 0.420
38
0 1 2 3 4 5 6 7 8 9 10 11 12
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
8 Ent: Existing Area 2
Hyd. No. 6 -- 100 Year
Hyd No. 6
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 7
8 Ent: Poposed Area 1
Hydrograph type = Rational Peak discharge = 1.303 cfs
Storm frequency = 100 yrs Time to peak = 15 min
Time interval = 1 min Hyd. volume = 1,173 cuft
Drainage area = 0.530 ac Runoff coeff. = 0.38*
Intensity = 6.471 in/hr Tc by User = 15.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.140 x 0.90) + (0.390 x 0.20)] / 0.530
39
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
8 Ent: Poposed Area 1
Hyd. No. 7 -- 100 Year
Hyd No. 7
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Feb 5, 2025
Hyd. No. 8
8 Ent: Proposed Area 2
Hydrograph type = Rational Peak discharge = 2.447 cfs
Storm frequency = 100 yrs Time to peak = 6 min
Time interval = 1 min Hyd. volume = 881 cuft
Drainage area = 0.400 ac Runoff coeff. = 0.6*
Intensity = 10.194 in/hr Tc by User = 6.00 min
IDF Curve = GSD-60 NOAA.IDF Asc/Rec limb fact = 1/1
* Composite (Area/C) = [(0.230 x 0.90) + (0.170 x 0.20)] / 0.400
40
0 1 2 3 4 5 6 7 8 9 10 11 12
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
8 Ent: Proposed Area 2
Hyd. No. 8 -- 100 Year
Hyd No. 8
Structure ReportPage 1 Struct Structure ID Junction Rim Line Out Line InStructureNo. Type Elev.Size Shape Invert Size Shape InvertShape Length Width(ft) (in) (ft) (in) (ft)(ft) (ft)1 CB Type C #1 Combination 254.65 Rect 4.00 3.00 12 Cir 243.65 12 Cir 243.652 CB Type CL #2 Grate 255.80 Rect 4.00 3.00 12 Cir 245.00 12 Cir 245.0012 Cir 245.003 CB Type C #4 Combination 253.55 Rect 4.00 3.00 12 Cir 246.704 CB Type CL #3 Grate 253.45 Rect 4.00 3.00 12 Cir 245.55Project File: GSD 66 Catch Basins v2.stmNumber of Structures: 4 Run Date: 02-05-2025Hydraflow Storm Sewers Extension v6.066
Storm Sewer Summary ReportPage 1 Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns JunctionNo. rate size shape length EL Dn EL Up slope down up loss Junct line Type(cfs) (in) (ft) (ft) (ft) (%) (ft) (ft) (ft) (ft) No.1 12 HDPE 2.22 12 Cir 46.702 243.20 243.65 0.964 243.83 244.28 0.33 244.28 End Combination2 12 HDPE 1.75 12 Cir 123.000 243.65 245.00 1.098 244.28 245.56 n/a 245.56 j 1 Grate3 12 HDPE 1.77 12 Cir 167.000 245.00 246.70 1.018 245.56 247.26 0.23 247.26 2 Combination4 12 HDPE 0.16 12 Cir 52.000 245.00 245.55 1.058 245.56 245.72 n/a 245.72 j 2 GrateProject File: GSD 66 Catch Basins v2.stmNumber of lines: 4 Run Date: 02-05-2025NOTES: Return period = 25 Yrs. ; j - Line contains hyd. jump.Hydraflow Storm Sewers Extension v6.066
Storm Sewer TabulationPage 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line IDcoeff (I) flow fullLine To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn UpLine(ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft)1 End 46.702 0.10 0.41 0.85 0.09 0.35 5.0 10.1 6.3 2.22 3.50 4.25 12 0.96 243.20 243.65 243.83 244.28 246.76 254.65 12 HDPE2 1 123.000 0.05 0.31 0.90 0.05 0.27 5.0 9.3 6.6 1.75 3.73 3.60 12 1.10 243.65 245.00 244.28 245.56 254.65 255.80 12 HDPE3 2 167.000 0.24 0.24 0.85 0.20 0.20 5.0 5.0 8.7 1.77 3.59 3.89 12 1.02 245.00 246.70 245.56 247.26 255.80 253.55 12 HDPE4 2 52.000 0.02 0.02 0.90 0.02 0.02 5.0 5.0 8.7 0.16 3.66 1.07 12 1.06 245.00 245.55 245.56 245.72 255.80 253.45 12 HDPEProject File: GSD 66 Catch Basins v2.stmNumber of lines: 4 Run Date: 02-05-2025NOTES: Intensity = 38.11 / (Inlet time + 3.60) ^ 0.69; Return period = 25 Yrs. ; c = cir e = ellip b = boxHydraflow Storm Sewers Extension v6.066
NOAA Atlas 14, Volume 10, Version 3
Location name: Oakdale, Connecticut, USA*
Latitude: 41.4202°, Longitude: -72.2009°
Elevation: 257 ft**
* source: ESRI Maps** source: USGS
POINT PRECIPITATION FREQUENCY ESTIMATES
Sanja Perica, Sandra Pavlovic, Michael St. Laurent, Carl Trypaluk, Dale Unruh, Orlan Wilhite
NOAA, National Weather Service, Silver Spring, Maryland
PF_tabular | PF_graphical | Maps_&_aerials
PF tabular
PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1
Duration Average recurrence interval (years)
1 2 5 10 25 50 100 200 500 1000
5-min 4.06
(3.16‑5.05)
4.85
(3.77‑6.05)
6.14
(4.76‑7.69)
7.22
(5.57‑9.08)
8.71
(6.52‑11.4)
9.83
(7.20‑13.1)
11.0
(7.84‑15.1)
12.3
(8.30‑17.2)
14.3
(9.26‑20.6)
15.9
(10.1‑23.3)
10-min 2.87
(2.24‑3.58)
3.43
(2.67‑4.28)
4.36
(3.38‑5.45)
5.12
(3.95‑6.44)
6.17
(4.61‑8.06)
6.96
(5.09‑9.26)
7.79
(5.55‑10.7)
8.74
(5.89‑12.2)
10.1
(6.56‑14.6)
11.3
(7.13‑16.5)
15-min 2.25
(1.75‑2.80)
2.69
(2.10‑3.36)
3.41
(2.65‑4.27)
4.02
(3.10‑5.04)
4.84
(3.62‑6.32)
5.46
(4.00‑7.26)
6.11
(4.35‑8.41)
6.86
(4.62‑9.58)
7.94
(5.14‑11.4)
8.83
(5.59‑12.9)
30-min 1.59
(1.23‑1.98)
1.90
(1.48‑2.37)
2.40
(1.86‑3.01)
2.83
(2.18‑3.55)
3.41
(2.55‑4.45)
3.84
(2.81‑5.11)
4.30
(3.06‑5.91)
4.83
(3.25‑6.74)
5.58
(3.62‑8.03)
6.20
(3.92‑9.07)
60-min 1.02
(0.796‑1.27)
1.22
(0.951‑1.53)
1.55
(1.20‑1.94)
1.82
(1.40‑2.29)
2.20
(1.64‑2.87)
2.48
(1.82‑3.30)
2.78
(1.97‑3.81)
3.11
(2.09‑4.34)
3.59
(2.33‑5.17)
3.99
(2.53‑5.84)
2-hr 0.672
(0.528‑0.832)
0.803
(0.629‑0.995)
1.02
(0.794‑1.26)
1.19
(0.927‑1.49)
1.44
(1.08‑1.86)
1.62
(1.19‑2.14)
1.81
(1.30‑2.48)
2.04
(1.38‑2.82)
2.37
(1.54‑3.37)
2.65
(1.68‑3.83)
3-hr 0.520
(0.410‑0.642)
0.620
(0.488‑0.766)
0.784
(0.615‑0.971)
0.920
(0.718‑1.14)
1.11
(0.837‑1.43)
1.25
(0.924‑1.64)
1.40
(1.01‑1.90)
1.57
(1.06‑2.16)
1.83
(1.19‑2.59)
2.05
(1.30‑2.95)
6-hr 0.332
(0.264‑0.407)
0.395
(0.313‑0.484)
0.498
(0.394‑0.612)
0.583
(0.458‑0.720)
0.700
(0.533‑0.898)
0.788
(0.588‑1.03)
0.881
(0.639‑1.19)
0.991
(0.675‑1.35)
1.15
(0.755‑1.62)
1.29
(0.825‑1.84)
12-hr 0.204
(0.163‑0.249)
0.242
(0.194‑0.295)
0.305
(0.243‑0.373)
0.357
(0.283‑0.438)
0.429
(0.329‑0.545)
0.482
(0.362‑0.624)
0.539
(0.393‑0.721)
0.605
(0.415‑0.818)
0.702
(0.462‑0.975)
0.784
(0.503‑1.10)
24-hr 0.120
(0.097‑0.145)
0.143
(0.116‑0.174)
0.182
(0.146‑0.220)
0.213
(0.170‑0.260)
0.257
(0.199‑0.325)
0.290
(0.219‑0.372)
0.325
(0.238‑0.431)
0.365
(0.251‑0.489)
0.426
(0.281‑0.585)
0.476
(0.307‑0.665)
2-day 0.067
(0.054‑0.080)
0.081
(0.066‑0.097)
0.104
(0.084‑0.125)
0.123
(0.099‑0.148)
0.149
(0.116‑0.187)
0.168
(0.128‑0.215)
0.189
(0.140‑0.250)
0.214
(0.148‑0.284)
0.252
(0.167‑0.343)
0.285
(0.184‑0.393)
3-day 0.048
(0.039‑0.058)
0.058
(0.048‑0.070)
0.075
(0.061‑0.090)
0.089
(0.072‑0.107)
0.107
(0.084‑0.134)
0.121
(0.093‑0.155)
0.137
(0.101‑0.180)
0.155
(0.107‑0.204)
0.182
(0.121‑0.247)
0.206
(0.133‑0.283)
4-day 0.039
(0.032‑0.046)
0.047
(0.038‑0.056)
0.060
(0.049‑0.071)
0.071
(0.057‑0.085)
0.085
(0.067‑0.106)
0.096
(0.074‑0.122)
0.108
(0.081‑0.142)
0.123
(0.085‑0.161)
0.144
(0.096‑0.194)
0.163
(0.106‑0.223)
7-day 0.026
(0.022‑0.031)
0.031
(0.026‑0.037)
0.039
(0.032‑0.047)
0.046
(0.038‑0.055)
0.055
(0.044‑0.068)
0.062
(0.048‑0.078)
0.070
(0.052‑0.090)
0.078
(0.055‑0.102)
0.092
(0.061‑0.122)
0.103
(0.067‑0.139)
10-day 0.021
(0.018‑0.025)
0.025
(0.021‑0.029)
0.031
(0.025‑0.037)
0.036
(0.029‑0.043)
0.043
(0.034‑0.052)
0.048
(0.037‑0.060)
0.053
(0.040‑0.068)
0.059
(0.041‑0.077)
0.068
(0.046‑0.091)
0.076
(0.050‑0.103)
20-day 0.015
(0.012‑0.018)
0.017
(0.014‑0.020)
0.020
(0.017‑0.024)
0.023
(0.019‑0.027)
0.026
(0.021‑0.032)
0.029
(0.022‑0.036)
0.032
(0.024‑0.040)
0.035
(0.025‑0.045)
0.039
(0.026‑0.051)
0.042
(0.028‑0.056)
30-day 0.012
(0.010‑0.014)
0.014
(0.011‑0.016)
0.016
(0.013‑0.019)
0.018
(0.015‑0.021)
0.020
(0.016‑0.024)
0.022
(0.017‑0.027)
0.024
(0.018‑0.030)
0.026
(0.018‑0.033)
0.028
(0.019‑0.037)
0.030
(0.020‑0.040)
45-day 0.010
(0.009‑0.012)
0.011
(0.009‑0.013)
0.013
(0.011‑0.015)
0.014
(0.012‑0.016)
0.016
(0.012‑0.019)
0.017
(0.013‑0.021)
0.018
(0.014‑0.023)
0.020
(0.014‑0.025)
0.021
(0.014‑0.027)
0.022
(0.014‑0.029)
60-day 0.009
(0.007‑0.010)
0.010
(0.008‑0.011)
0.011
(0.009‑0.013)
0.012
(0.010‑0.014)
0.013
(0.010‑0.016)
0.014
(0.011‑0.017)
0.015
(0.011‑0.019)
0.016
(0.011‑0.020)
0.017
(0.012‑0.022)
0.018
(0.012‑0.023)
1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS).
Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (fora given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are notchecked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values.
Please refer to NOAA Atlas 14 document for more information.
Back to Top
PF graphical
2/5/25, 11:40 AM Precipitation Frequency Data Server
https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=41.4202&lon=-72.2009&data=intensity&units=english&series=pds 1/4
Back to Top
Maps & aerials
Small scale terrain
2/5/25, 11:40 AM Precipitation Frequency Data Server
https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=41.4202&lon=-72.2009&data=intensity&units=english&series=pds 2/4
Large scale terrain
Large scale map
Large scale aerial
+
–
3km
2mi
+
–
100km
60mi
+
–
100km
60mi
2/5/25, 11:40 AM Precipitation Frequency Data Server
https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=41.4202&lon=-72.2009&data=intensity&units=english&series=pds 3/4
Back to Top
US Department of Commerce
National Oceanic and Atmospheric Administration
National Weather Service
National Water Center
1325 East West Highway
Silver Spring, MD 20910
Questions?: HDSC.Questions@noaa.gov
Disclaimer
+
–
100km
60mi
2/5/25, 11:40 AM Precipitation Frequency Data Server
https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=41.4202&lon=-72.2009&data=intensity&units=english&series=pds 4/4