HomeMy WebLinkAbout25 SUB 2 Bond EstimateSunmar/RAF Builders LLC 1121 East Lake Drainage ***Estimate*** Description Quanity Unit Labor / Days Labor Unit Cost Material Unit Cost Material Cost Labor Cost Trucking Disposal / Disposal Total Sitework Build Swale (Stone & Grass)250 LF 4 1,500.00$ 3.75$ 937.50$ 6,000.00$ -$ 6,937.50$ Rip Rap ( 75LF Long)70 Ton 0 -$ 35.00$ 2,450.00$ -$ -$ 2,450.00$ Geotech Fabric 1 LS 0 -$ 1,200.00$ 1,200.00$ -$ -$ 1,200.00$ Topsoils 40 YDS 0 -$ 24.00$ 960.00$ -$ -$ 960.00$ Jute Netting 1 Roll 0 -$ 210.00$ 210.00$ -$ -$ 210.00$ Drainage Piping 24" HDPE Pipe 130 LF 3 1,500.00$ 38.00$ 4,940.00$ 4,500.00$ -$ 9,440.00$ 24" Flared End 1 EA 0 -$ 462.00$ 462.00$ -$ -$ 462.00$ Crushed Stone 60 Ton 0 -$ 30.00$ 1,800.00$ -$ -$ 1,800.00$ Main Hole 1 EA 1 1,500.00$ 1,900.00$ 1,900.00$ 1,500.00$ -$ 3,400.00$ Topsoil & Grade Site 400 YDS 0 -$ 30.00$ 12,000.00$ -$ -$ 12,000.00$ Misc Sundry Items 1 LS 0 -$ 350.00$ 350.00$ -$ -$ 350.00$ Total 8 27,209.50$ 12,000.00$ -$ 39,209.50$