HomeMy WebLinkAbout25IWC7-SilverFallRd-SS Comments #2 5-24-2025 Wetland Delineations Wetland Evaluations Soil Evaluations 1 ____________________________________________________________________ Ian Cole, LLC Professional Registered Soil Scientist / Professional Wetland Scientist PO BOX 619 Middletown, CT 06457 Itcole@gmail.com 860-514-5642 May 24, 2025 Ms. Meredith Badalucca Assistant Planner Department of Land Use & Development Town of Montville 310 Norwich-New London Turnpike Uncasville, CT 06382 Re: 25SUB3 – Daniela Gjergjaj Map 001 Block 007 Lot 00A Silver Falls Road Montville, CT Re-Subdivision Plan Review Dear Ms. Badalucca, At the Town of Montville’s request, Ian Cole LLC completed a review of the updated CLA site plan and additional information provided by CLA and the Applicant on May 8, 2025, and I offer the following additional comments for the Town of Montville Inland Wetland Commission consideration. To offset the permanent filling of 4,950 SF of wetlands to facilitate the proposed shared driveway connection the applicant is proposing to plant 19 Highbush blueberry and 18 Common winterberry shrubs in 1-gallon containers. No other mitigation details were provided. 1 gallon- containers are inadequate to offset the proposed impact. The size of the plantings should be minimally 3-4’ landscape quality shrubs to ensure survivability and vigor. To provide a well-functioning self-sustaining buffer. The applicant should provide additional planting details that minimally include location of plantings, ground and soil preparation, as well as what performance metrics will be included to ensure the planted area is established and shrubs survive past the vulnerable post planting stage. The wetland restoration plan should include post-construction monitoring, reporting and Wetland Delineations Wetland Evaluations Soil Evaluations 2 should address measures that ensure invasive species are not introduced or propagate within the mitigation plantings. The applicant has updated the plans to correct the proposed future emergency access roadway extension into Waterford. The proposed emergency access appears to have additional wetland impacts in the abutting town of Waterford that have not been accounted for under a single and complete project. As a single and complete project crossing a town boundary does not alleviate the project from including these impacts, even if the impacts cross a town boundary, a project cannot phase total impacts. While the unaccounted impacts might not have to be mitigated for in the Town of Montville, they should be included in the total project disturbance. The applicant should quantify the impacts of this crossing site and provide clarification on the regulatory permitting of this “emergency access”. With these additional impacts accounted for the project should confirm the total project SF of wetland disturbance. If the applicant is proposing more than 5,000 SF of wetland disturbance additional State and Federal wetland permits may be required. If you have any questions or comments, please do not hesitate to contact me at itcole@gmail.com or (860) 514-5642. Sincerely, Ian T. Cole Professional Registered Soil Scientist Professional Wetland Scientist #2006