Loading...
HomeMy WebLinkAbout22SITE2 245Rte32 PhasedPlan Rev012092022pg 1-6VIRGI N I A COU R TBONVILLE DR.MAPL E JEROMEAVENUE ROADROAD JEROME AVE. STARR 163 Uncasville ROAD NEW LONDON TPK (RT 32)PINK C R E S CENTST.BLUMENTHALDR. DEPOT RD. DEPOT RO W MAP L E AVE . EXT.ROADDOCK GAIR COURTEDWARD RD. HARRISON BREWER ST. ST. POWER HOUSE ROAD C-0 COVER SHEET PROPOSED 22 UNIT CONDOMINIUM DEVELOPMENT 245 NORWICH-NEW LONDON ROAD (CT ROUTE 32) MONTVILLE, CONNECTICUT DRAWING LIST SHEET NAME COVER SHEET IMPROVEMENT LOCATION PLAN SITE LAYOUT PLAN PHASING PLAN GRADING, DRAINAGE PLAN UTILITY PLAN SOIL EROSION & SEDIMENT CONTROL PLAN SOIL EROSION & SEDIMENT CONTROL NOTES & DETAILS LANDSCAPE & LIGHTING PLAN DETAIL SHEET DETAIL SHEET DETAIL SHEET DETAIL SHEET CT-DOT SHEET NO. C-0 PLAN DATE LATEST REVISION SITE/CIVIL DRAWINGS C-2.1 C-3.1 C-4.1 C-4.2 C-5.1 C-6.1 C-6.2 APPLICANT ARCHITECTURAL DRAWINGSELEVATIONS UNITS 1 - 91 4 SECOND FLOOR & ROOF C-6.3 Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 1/4/22 FE22-1700 THIS DRAWING IS THE PROPERTY OFTHE ENGINEER. IT HAS BEENSPECIFICALLY PREPARED FOR THEOWNER FOR THIS PROJECT AT THIS SITEAND IS NOT TO BE USED FOR ANYOTHER PURPOSE, LOCATION OR OWNERWITHOUT WRITTEN CONSENT OF THEENGINEER.PREPARED FOR245 NORWICH-NEW LONDON ROAD (RT 32)22 UNIT CONDOMINIUM DEVELOPMENTD.R.R.J.E.Q.WESTERN GROUP, LLCSubmission 01/25/22 525 JOHN STREET BRIDGEPORT, CT. 06604Office (203) 333-9465fax (203) 336-1769e-mail Info@FullerSurveyors MONTVILLE, CONNECTICUTAPPROVED BY THE MONTVILLE PLANNING AND ZONING COMMISSION CHAIRMAN DATE WILTON'S WAYO:\Fuller CAD Files\CT\Bridgeport\Benson Terrace\#26 - FE13-1101 - Fox\Survey Data\2013 09 10 FE 13-1100 FOX 26BENSON TERR\LOCATION.crd12/9/2022 2:07 PMStaff Comments 03/08/22 APPROVED BY THE MONTVILLE INLAND WETLAND COMMISSION CHAIRMAN DATE EXPIRATION DATE SEC PLAN APPROVAL DATE Building Mods/Cond. of Approval08/10/22 Final Cond. of Approval 10/21/22 Phasing 12/04/22 WESTERN GROUP, LLC 338 Westport Road Wilton, CT OWNER 03/10/22 5 TYP ELEVATIONS 6 SECTIONS WESTERN GROUP, LLC 338 Westport Road Wilton, CT ELEVATIONS UNITS 10-222 3 BASEMENT & FIRST FLOOR C-1 / RT 32 OZ DISTRICT C-3.2 01/25/22 01/25/22 12/04/22 01/25/22 12/04/22 01/25/22 12/04/22 01/25/22 12/04/22 01/25/22 12/04/22 01/25/22 12/04/22 01/25/22 12/04/22 01/25/22 12/04/22 01/25/22 12/04/22 MAP 70 LOT 010-000 SITE 03/10/22 03/10/22 03/10/22 03/10/22 03/10/22 03/10/22 03/10/22 03/10/22 03/10/22 03/10/22 03/10/22 01/07/22 08/10/22 C-6.4 01/25/22 12/04/22 01/25/22 12/04/22C-2.2 12/04/22 245 NORWICH-NEW LONDON ROAD (RT 32 MONTVILLE, CONNECTICUT PREPARED FOR:WESTERN GROUP, LLC SCALE 1" = 10' 7 JANUARY 2022 Rev 8 March 2022 FE22-1700 KEVIN M. CROWLEY R.L.S. # 70261 TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT TO THE STANDARDS OF CLASS "A2" AS NOTED HEREON. THIS MAP IS NOT VALID UNLESS IT HAS A LIVE SIGNATURE AND EMBOSSED SEALOF KEVIN M. CROWLEY.Imp Loc Plan -245 Rt 32 - FE22-1700.dwgO:\Fuller CAD Files\CT\Montville\Rte 32\#245 Route 32 - FE22-1700 - Eanou\DWG\Site\3/11/2022 2:41 PMZONING IMPROVEMENT LOCATION & TOPOGRAPHIC PLAN VICINITY MAP 525 JOHN STREET BRIDGEPORT, CT. PH. 203-333-9465 EMAIL:INFO@FULLERSURVEYORS.COM SITE 1. THIS SURVEY AND MAP HAS BEEN PREPARED IN ACCORDANCE WITH SECTIONS 20-300B-1 THRU 20-300B-20 OF THE REGULATIONS OF CONNECTICUT STATE AGENCIES - "STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ENDORSED BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS,INC. AND ADOPTED ON SEPT. 26, 1996. 2. THE TYPE OF SURVEY PERFORMED WITH RESPECT TO THE BOUNDARY PERIMETER IS IMPROVEMENTLOCATION MAP. 3. THE BOUNDARY DETERMINATION CATEGORY IS DEPENDENT RESURVEY (SEE MAP REFERENCE). 4. WITH RESPECT TO HORIZONTAL ACCURACY, THIS MAP CONFORMS TO AN ACCURACY CLASS A-2. 5. WITH RESPECT TO VERTICAL ACCURACY, THIS MAP CONFORMS TO AN ACCURACY CLASS T-D. 6. UTILITY, STRUCTURES, AND FACILITY LOCATIONS DEPICTED AND NOTED HEREON HAVE BEEN COMPILED, IN-PART, BY FIELD LOCATIONS OF OBSERVABLE STRUCTURES AND PAINTED MARKINGS. THE ACTUAL LOCATION AND SIZE OF UNDERGROUND UTILITIES SHOWN HEREON MAY NOT BE INDICATED. ADDITIONALUNDERGROUND UTILITIES MAY EXIST. PRIOR TO EXCAVATION OR CONSTRUCTION, CONTACT "CALL BEFORE YOU DIG", (800) 922-4455. 7. OWNER OF RECORD: WESTERN GROUP LLC, RECORDED IN VOLUME 672, PAGE 82 IN THE TOWN OF MONTVILLE TOWN CLERK'S OFFICE. 8. PARCEL IS LOCATED IN THE C-1 ZONE AND IS LOCATED IN THE ROUTE 32 OVERLAY ZONE (OZ) ON MAP 070,BLOCK 010, LOT 000. 9. TOTAL SITE AREA 1.87 ACRES. 10.THIS SITE IS NOT WITHIN A FEMA FLOOD HAZARD ZONE PER FEMA MAP 09011C0361J EFFECTIVE DATE8/5/2013. 11.ALL DECLARATIONS ARE VALID FOR THE MAP AND COPIES THERE OF ONLY IF THEY BEAR THE EMBOSSED SEAL OF THE SURVEYOR WHOSE SIGNATURE APPEARS HEREON. UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS SURVEY RENDER ANY DECLARATION SHOWN HEREON NULL AND VOID. NOTES:MAP REFERENCES: A. "LOCATION MAP, NOTES, & A2 SURVEY, COMMERCIAL / RESIDENTIAL COMPLEX NORWICH-NEW LONDON ROAD (CT ROUTE 32) MONTVILLE, CONNECTICUT, PREPARED FORTOMASHE, LLC, 19 TUSA COURT MONMOUTH JUNCTION, NJ 08852", DATED SEPTEMBER 19, 2014, REVISED THROUGH 3/17/15, SCALE: 1" = 20', BY DENNIS A. JEROME J. DEMPSEY, L.S. ON FILE AS MAP 2519 IN THE TOWN OF MONTVILLE LAND RECORDS. 45 45 5 0 5 0 5 5 5 5 60606 5 657 0 707575 4242 42 43 43 44 44 46 46 4 7 47 4 8 4 8 4 9 4 9 5 1 5 1 5 2 5 2 53 5 3 54 5 4 5 6 5 6 5 7 5 7 5 8585 959616 1 626 2 636 3 6 4 646 6 666 7 676 8 6869697171727 2 737 3 747476764 5 5 0 5 5 6 0 6 57075 4 4 4 6 4 7 4 8 4 951525354 56 5 7 58 5 9 6 1 62636 466676869717273747 677 S69° 36' 08"E 372.03' S2 2 ° 3 5 ' 2 2 " E 21 4 . 5 0 ' N74° 06' 41"W 332.13'N74° 06' 41"W 179.29'N17° 56' 34"E197.30'I.P. FND RWCFND MONFND MONFND I.P. FND70.08'I.P. FND MONFND EXTG. HOUSENORWICH-NEW LONDONROAD (CT ROUTE 32)EXTG. HOUSE EXTG. GARAGE EXTG. HOUSE Extg. 12" Water Main(92 PSI Static) Extg. 6" San Sewer9.2' Deep (El. 67.8±) Extg. 6" San Sewer9.0' Deep (El. 68.0) Extg. 1" Waterto House Extg. Hydrant Approximate WetlandsLimit per DEPWetlands 2011 50' Upland ReviewArea SNET2749 BIT.CONC.APRON 255 ROUTE 32N/FST FELIX SERGINOVOL. 662, PG. 1118 29 MAPLE AVE EXTN/FSTEPHEN KENNVOL. 633, PG. 387 25 LATHROP ROADN/FNORMAN EDWARDBUTTON & GRACE ANNBUTTONVOL. 114, PG. 18 231 ROUTE 32N/FCHARLES & BENNYHOLZSCHLAGVOL. 590, PG. 123 PARCEL AREA79,607 S.F.1.83 AC WOODEDAREA 48" TREE EXIST ING TREEL INE R 2 0 Z O N E R20 ZONE C-1 ZONE C- 1 Z O N E R2 0 Z O N E C- 1 Z O N E 15' Side Yard Setback 15' Side Yard Setback30' Front Yard Setback30 ' R e a r Y a r d S e t b a c k BENCHMARK HELDEXTG NAIL FND IN POLEELEV. = 77.4 VIRGI N I A COUR TBONVILLE DR.MAPLE JEROMEAVENUE ROADROAD JEROME AVE. STARR 163 Uncasville ROAD NEW LONDON TPK (RT 32)PINK CR E SCENTST.BLUMENTHALDR. DEPOT RD. DEPOT R O W MAP L E AVE . EXT.ROADDOCK GAIRCOURTEDWARD RD. HARRISON BREWER ST. ST. POWER HOUSE ROAD 1.THIS PLAN IS FOR THE PROPOSED CONDOMINIUM BUILDINGS WITH PARKINGCONSTRUCTION, SITE UTILITIES, AND MISCELLANEOUS LANDSCAPING. THIS PLAN ISNOT TO BE USED AS A SITE OR CONSTRUCTION PLAN. ADDITIONAL DESIGN ANDDETAILS REQUIRED FOR BIDDING AND CONSTRUCTION. 2. LOCATION OF EXISTING OUT STRUCTURES, AND TOPOGRAPHY WERE OBTAINED FROMA SURVEY TITLED "ZONING IMPROVEMENT LOCATION & TOPOGRAPHIC PLAN, 245NORWICH-NEW LONDON ROAD (RT32) MONTVILLE, CONNECTICUT, PREPARED FORWESTERN GROUP, LLC", DATED 7 JANUARY 2022, SCALE 1"=10', BY FULLERENGINEERING & LAND SURVEYING LLC. 3. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS ANDSEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ONTHE CONSTRUCTION SITE. 4. THE CONTRACTOR SHALL LOCATE AND VERIFY THE SIZE, LOCATION, DEPTH ANDINVERTS OF ANY AND ALL EXISTING UTILITIES PRIOR TO COMMENCING OPERATIONS.THE CONTRACTOR SHALL ALSO BE REQUIRED TO CONTACT THE ZONING DEPARTMENT,FIRE MARSHALL, AND THE TOLL FREE "CALL-BEFORE-YOU-DIG" PHONE NUMBER AT1-800-922-4455. 5. THE PROPOSED DEVELOPMENT SHOWN HEREON WILL REQUIRE REVIEW ANDAPPROVAL BY THE LOCAL BUILDING DEPARTMENT PER THE REQUIREMENTS OF THE2002 CT E&S GUIDELINES. 6. RESTORE ALL DISTURBED AREAS WITH A MINIMUM OF FOUR (4") INCHES OF TOPSOIL,SEED, AND HAY MULCH UPON COMPLETION OF CONSTRUCTION. 7. LOT SERVED BY TOWN SEWER SYSTEM AND PUBLIC WATER SUPPLY. 8. THIS SITE IS NOT WITHIN A FEMA FLOOD HAZARD ZONE PER FEMA MAP 09011C0361J EFFECTIVE DATE 8/5/2013. 9. CLEARING LIMIT LINE SHALL BE ESTABLISHED PRIOR TO ANY SITE WORK ACTIVITIES. NOTES: MAP REFERENCES: A. "ZONING IMPROVEMENT LOCATION AND TOPOGRAPHIC SURVEY", DATED 7 JANUARY 2022, SCALE 1"=20', BYFULLER ENGINEERING AND LAND SURVEYING, LLC. C-2.1 Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 1/4/22 FE22-1700 12/9/2022 2:08 PMRESERVEDPARKING ACCESSIBLEVAN WILL BE FINEDVIOLATORS MININIMUM $150NORWICH-NEW LONDONROAD (CT ROUTE 32)>>>>>>>>>>>>10' (Typ)10' (Typ)13.0'20' (Typ)20' (Typ)24' (Typ)18' (Typ)24' (Typ)18' (Typ)8' (Typ)8' (Typ)9' (Typ)16.0'16.0'39.9'8' (Typ)79.9' 78.5'69.0'13.0' (Typ) 10.0' (Typ)20.0'20.0' 20.0'10.0'(Typ) 10.0'(Typ) 10.0'(Typ)15.7'81.9' 20.0'EW LONDONFM FM FM SAN FM FM FM FM 10' (Typ)ETCETCETCETCETCETC C-2.2 Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 1/4/22 FE22-1700 12/9/2022 2:21 PMPHASE 1 PHASE 2 PHASE 3 PHASE 4NORWICH-NEW LONDONROAD (CT ROUTE 32)NORWICH-NEW LONDONROAD (CT ROUTE 32)NORWICH-NEW LONDONROAD (CT ROUTE 32)NORWICH-NEW LONDONROAD (CT ROUTE 32) Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 1/4/22 FE22-1700 12/9/2022 2:23 PMNOTES: 1.THIS PLAN IS FOR THE PROPOSED GRADING AND DRAINAGE FOR THE CONSTRUCTION OF A RESIDENTIALDEVELOPMENT WITH PARKING, AND MISCELLANEOUS LANDSCAPING ALONG THE CT ROUTE 32. THIS PLAN ISNOT TO BE USED AS A SITE OR CONSTRUCTION PLAN. ADDITIONAL DESIGN AND DETAILS REQUIRED FORBIDDING AND CONSTRUCTION. 2. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTIONAND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 3. THE CONTRACTOR SHALL LOCATE AND VERIFY THE SIZE, LOCATION, DEPTH AND INVERTS OF ANY AND ALLEXISTING UTILITIES PRIOR TO COMMENCING OPERATIONS. THE CONTRACTOR SHALL ALSO BE REQUIRED TOCONTACT THE TOLL FREE "CALL-BEFORE-YOU-DIG" PHONE NUMBER AT 1-800-922-4455. 4. THE PROPOSED DEVELOPMENT SHOWN HEREON WILL REQUIRE REVIEW AND APPROVAL BY THE MONTVILLEBUILDING DEPARTMENT, ZONING DEPARTMENT, AND FIRE MARSHAL'S OFFICE. 5. ALL WORK PERFORMED BY THE OWNER / DEVELOPER MUST INCLUDE IMPLEMENTATION OF AN APPROVEDSOIL EROSION AND SEDIMENTATION PLAN IN ACCORDANCE WITH PUBLIC ACT No. 83-388 [PASSED BY THECONNECTICUT GENERAL ASSEMBLY]. THE OWNER / DEVELOPER SHALL BE THOROUGHLY FAMILIAR WITH THE2002 CONNECTICUT EROSION & SEDIMENTATION GUIDELINES. 6. RESTORE ALL DISTURBED AREAS WITH A MINIMUM OF FOUR (4") INCHES OF TOPSOIL, SEED, AND HAY MULCHUPON COMPLETION OF CONSTRUCTION. 7. LOT SERVED BY TOWN SEWER SYSTEM AND PUBLIC WATER SUPPLY. 8. ALL EXISTING UTILITY LINES THAT WILL BE DISCONNECTED MUST BE CAPPED OR TERMINATED ACCORDING TOTHE TOWN OF MONTVILLE AND UTILITY COMPANY STANDARDS. 9. FINAL RETAINING WALL SYSTEM TO BE DESIGNED AND INSPECTED BY A CONNECTICUT LICENSED ENGINEER.STRUCTURAL DETAILS TO BE SUBMITTED TO THE SATISFACTION OF THE TOWN BUILDING INSPECTOR PRIOR TOISSUANCE OF BUILDING PERMIT. 10. SEE APPENDIX "O" OF THE ENGINEERING REPORT FOR OPERATION AND MAINTENANCE PLAN. TEST PIT AND PERCOLATION DATAMAP REFERENCES: A. "ZONING IMPROVEMENT LOCATION AND TOPOGRAPHIC SURVEY", DATED 7 JANUARY 2022, SCALE 1"=20', BYFULLER ENGINEERING AND LAND SURVEYING, LLC. EARTHWORK A. TOTAL AREA OF DISTURBANCE: 66,340 S.F. (1.5 A.C.±) OFF-SITE WETLANDS FLAGGED BY ALEKSANDRA MOCH ON FEBRUARY 12, 2022. Scope: The purpose of the Operations and Maintenance Plan is to ensure that the existing and proposedstormwater components installed at #245 Route 32, Norwich New London Turnpike Montville, CT are maintained in operational condition throughout the life of the project. The service procedures associated with this plan shall be performed as required by the parties legally responsible for their maintenance. Recommended Frequency of Service: As further defined below, all stormwater components should be checked on a periodic basis and kept in fullworking order. Ultimately, the required frequency of inspection and service will depend on runoff quantities,pollutant loading, and clogging due to debris. At a minimum, we recommend that all stormwater components be inspected and serviced twice per year, once before winter begins and once during spring cleanup. Qualified Inspector: The inspections must be completed by an individual experienced in the construction and maintenance ofstormwater drainage systems. Once every five years the inspections must be completed by a professionalengineer. Service Procedures: 1.Catch Basins & Drainage Inlets: a. Catch basins and drainage inlets shall be completely cleaned of accumulated debris and sediments at the completion of construction. b. For the first year, catch basins and drainage inlets shall be inspected on a quarterly basis. c. Any accumulated debris within the catch basins/inlets shall be removed and any repairs as required.d.From the second year onward, visual inspections shall occur twice per year, once in the spring andonce in the fall, after fall cleanup of leaves has occurred.e. Accumulated debris within the catch basins/inlets shall be removed and repairs made as required.f. Accumulated sediments shall be removed at which time they are within 12 inches of the invert of the outlet pipe. g. Any additional maintenance required per the manufacturer's specifications shall also be completed. 2.Storm Drainage Piping and Manholes/Junction Boxes: a. All storm drainage piping shall be completely flushed of debris and accumulated sediment at the completion of construction. b. Manholes/Junction Boxes shall be inspected and repaired on an annual basis. c. Unless system performance indicates degradation of piping, comprehensive video inspection of storm drainage piping shall occur once every ten years. d. Any additional maintenance required per the manufacturer's specifications shall also becompleted. 3.Stormwater Inlet/Control Structures: a. All control structures (orifice, weir, etc.) shall be completely cleaned of accumulated debris and sediments at the completion of construction. Any repairs shall be performed.b. For the first year, control structures (orifice, weir, etc.) shall be inspected on a quarterly basis. c. Any accumulated debris shall be removed and any repairs made to the control structures (orifice,weir, etc.) as required.d.From the second year onward, visual inspections shall occur twice per year, once in the spring andonce in the fall, after fall cleanup of leaves has occurred. e. Accumulated debris shall be removed and repairs made as required. f. Any additional maintenance required per the manufacturer's specifications shall also be completed. 4.Drywells and Infiltration Systems: a. All drywells/infiltrators shall be completely cleaned of accumulated debris and sediments upon the completion of construction. b. For the first year, the drywells/infiltrators shall be inspected on a quarterly basis. c. Any accumulated debris within the drywells/infiltrators shall be removed and any repairs made tothe units as required.d.From the second year onward, visual inspection shall occur twice per year, once in the spring andonce in the fall, after fall cleanup of leaves has occurred. e. Accumulated debris within the units shall be removed and repairs made as required. f. Any additional maintenance required per the manufacturer's specifications shall also be completed. 5.Roof Gutters: a.Remove accumulated debris and inspect for damage. Any damage should be repaired as required. Disposal of Debris and Sediment: All debris and sediment removed from the stormwater structures and bioretention/biofiltration basins shall bedisposed of legally. There shall be no dumping of silt or debris into or in proximity to any inland or tidalwetlands. Maintenance Records: The Owners(s) must maintain all records (logs, invoices, reports, data, etc.) and have them readily available for inspection at all times. OPERATIONS AND MAINTENANCE PLAN W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SAN SAN SAN SAN SAN SAN SAN SANFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFM FM SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM 10' (Typ)10' (Typ)W W W W W W W W W WWGAR. F.F. El. = 74.7 GAR. F.F. El. = 73.5 GAR. F.F. El. = 73.5 GAR. F.F. El. = 71.8 GAR. F.F. El. = 70.4 GAR. F.F. El. = 68.8 GAR. F.F. El. = 68.8 GAR. F.F. El. = 67.1 FF. El. = 83.6 FF. El. = 82.5 FF. El. = 82.5 FF. El. = 80.8 FF. El. = 79.4 FF. El. = 77.8 FF. El. = 77.8 FF. El. = 76.1 GAR. F.F. El. = 73.5 FF. El. = 82.5 GAR. F.F. El. = 72.1FF. El. = 81.1 GAR. F.F. El. = 72.1 FF. El. = 81.1 GAR. F.F. El. = 70.5 FF. El. = 79.5 GAR. F.F. El. = 70.5 FF. El. = 77.8 GAR. F.F. El. = 68.8 FF. El. = 77.8 GAR. F.F. El. = 68.8 FF. El. = 77.2 GAR. F.F. El. = 67.3FF. El. = 76.3GAR. F.F. El. = 73.5 FF. El. = 82.5 GAR. F.F. El. = 75.1FF. El. = 84.1GAR. F.F. El. = 75.1FF. El. = 84.1FF. El. = 84.8GAR. F.F. El. = 76.4 GAR. F.F. El. = 66.6FF. El. = 75.6 GAR. F.F. El. = 71.8FF. El. = 80.8 74 73 73 71 70 6968 67 76 75 75 73 73 70 GAR. F.F. El. = 66.6GAR. F.F. El. = 66.6 FF. El. = 75.6 NORWICH-NEW LONDONROAD (CT ROUTE 32)97 LF 8" Ø ADS-N12 @0.01 MIN 90 LF 10" Ø ADS-N12 @0.01 ft./ft. MIN 57 LF 10" Ø ADS-N12 @0.03 ft/ft47 LF 8" Ø ADS-N12 @ 0 .01 M IN ADS-N12 CB3TF = 70.60' 10" ADS INV. = 68.60'(3 LF @ 0.005 ft/ft) CB2 TF = 74.60'8" ADS INV. = 69.60'(97 LF @ 0.01 ft/ft) CB1TF = 74.40' 8" ADS INV. = 70.07' (47 LF @ 0.01 ft/ft) CB4TF = 66.90' 10" ADS INV. = 63.83' (16 LF @ 0.01 ft/ftto GALLEYS) CB5TF = 64.4'10" ADS INV. = 61.15'10" ADS (OUT) = 60.91' (12 LF @ 0.02 ft/ftto GALLEYS) LEVEL SPREADER TOP = 57.5INV. = 49.5 18"ØOBSERVATION PORT (TYP) 18"Ø OBSERVATION PORT (TYP) 66 L.F 12"ADS-N12 @ 0.01 Min 4 L.F 10" ADS-N12 PVC @ 0.01 Min Cut/Fill Summary Name Earthwork Totals Cut Factor 1.000 Fill Factor 1.000 2d Area 66340.66 Sq. Ft. 66340.66 Sq. Ft. Cut 3325.99 Cu. Yd. 3325.99 Cu. Yd. Fill 3645.68 Cu. Yd. 3645.68 Cu. Yd. Net 319.69 Cu. Yd.<Fill> 319.69 Cu. Yd.<Fill> Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 1/4/22 FE22-1700 12/9/2022 2:49 PMNOTES: 1.THIS PLAN IS FOR THE PROPOSED UTILITIES OF THE PROPOSED RESIDENTIAL DEVELOPMENT WITH PARKINGCONSTRUCTION, AND MISCELLANEOUS LANDSCAPING. THIS PLAN IS NOT TO BE USED AS A SITE ORCONSTRUCTION PLAN. ADDITIONAL DESIGN AND DETAILS REQUIRED FOR BIDDING AND CONSTRUCTION. 2. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION ANDFOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 3. THE CONTRACTOR SHALL LOCATE AND VERIFY THE SIZE, LOCATION, DEPTH AND INVERTS OF ANY AND ALLEXISTING UTILITIES PRIOR TO COMMENCING OPERATIONS. THE CONTRACTOR SHALL ALSO BE REQUIRED TOCONTACT THE TOLL FREE "CALL-BEFORE-YOU-DIG" PHONE NUMBER AT 1-800-922-4455. 4. THE PROPOSED DEVELOPMENT SHOWN HEREON WILL REQUIRE REVIEW AND APPROVAL BY THE LOCAL BUILDINGDEPARTMENT, ZONING DEPARTMENT, AND FIRE MARSHAL'S OFFICE. 5. ALL WORK PERFORMED BY THE OWNER / DEVELOPER MUST INCLUDE IMPLEMENTATION OF AN APPROVED SOILEROSION AND SEDIMENTATION PLAN IN ACCORDANCE THE MINIMUM STANDARDS AS THOSE OUTLINED IN THE"CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENTATION CONTROL" 2002 EDITION AS AMENDED TODATE. THOSE METHODS DEEMED MOST EFFECTIVE FOR THIS PROJECT ARE DESCRIBED HEREIN. 6. RESTORE ALL DISTURBED AREAS WITH A MINIMUM OF FOUR (4") INCHES OF TOPSOIL, SEED, AND HAY MULCHUPON COMPLETION OF CONSTRUCTION. 7. LOT SERVED BY TOWN SEWER SYSTEM AND PUBLIC WATER SUPPLY. APPLICATION WILL BE MADE TO THE WATERPOLLUTION CONTROL AUTHORITY FOR A PERMIT TO CONSTRUCT AND CONNECT WATER AND SEWER LINES TOTHE MONTVILLE SEWER SYSTEM. 8. EXISTING UNDERGROUND UTILITY LOCATION TAKEN FROM MAPS PROVIDED BY UTILITY COMPANY AND SEWERDEPARTMENT, PRIOR SURVEYS, AND FIELD MARKINGS. 9. ALL EXISTING UTILITY LINES THAT WILL BE DISCONNECTED MUST BE CAPPED OR TERMINATED ACCORDING TO THETOWN OF MONTVILLE AND UTILITY COMPANY STANDARDS. 10. IF REQUIRED, ALL EXISTING SANITARY SEWER LINES SHALL BE CAPPED WITHIN 2 FEET OF THE EXISTING SEWERMAIN. 11. ALL ROOF LEADERS SHALL BE PIPED AND CONNECTED TO THE SUBSURFACE DRAINAGE SYSTEM. PIPE ROUTINGAND GUTTER CONNECTIONS SHALL BE DETERMINED BY CONTRACTOR. 12. ALL UNITS ARE DESIGNED TO HAVE SANITARY CONNECTIONS IN EACH BASEMENT AND WILL PUMP UP TO THEMAIN LATERAL AT THE FRONT OF THE BUILDINGS. SANITARY LIFT SYSTEMS ARE REQUIRED TO FACILITATE ALLSEWAGE DISCHARGE TO THE TOWN SEWER SYSTEM IN THE STREET. 13. ALL WORK SHALL COMPLY WITH THE FOLLOWING TOWN STANDARDS: 13.1. TOWN OF MONTVILLE SEWER USE RULES AND REGULATIONS. 13.2. TOWN OF MONTVILLE SANITARY SEWER MATERIALS AND CONSTRUCTION STANDARDS. 13.3. TOWN OF MONTVILLE SPECIFICATIONS OF WATER MAINS AND APPURTENANCES. 14. SEWER PIPE TO BE PLASTIC PVC-SDR35. 15. WATER LINES TO BE TYPE K COPPER TUBING. MAP REFERENCES: A. "ZONING IMPROVEMENT LOCATION AND TOPOGRAPHIC SURVEY", DATED 7 JANUARY 2022, SCALE 1"=20', BY FULLER ENGINEERING AND LAND SURVEYING, LLC.NORWICH-NEW LONDONROAD (CT ROUTE 32)W W W W W W W W RIM=64.8 W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN RIM=76.3 FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM 10' (Typ)10' (Typ)RIM=65.1 W W W W W W W W W W W W WWWETC ETC ETC ETC ETC ETC ETCETCETC ETCETCETCETCETCETCETCETCETCETC ETC ETC ETC ETC ETC 74 73 73 71 70 6968 67 76 75 75 73 73 70