Loading...
HomeMy WebLinkAbout25SITE3 - E&S Bond EstimateErosion Control and Site Restoration Bond Estimate Prepared for Cricket's Corner, LLC 1645 Route 85, Montville, CT DATE: 2/21/2025 Page 1 of 1 Item No.Description Quantity Unit Cost Amount EROSION AND SEDIMENTATION CONTROLS 1a Anti-tracking pad, per square yard 130 $27.72 $3,603.47 1b Sediment barrier, install and maintain, per linear foot 1600 $4.53 $7,246.69 1c Provide and maintain inlet protection, per each 10 $328.44 $3,284.44 SITE RESTORATION 2a Hay, 1" deep, power mulcher, large, per 1,000 square feet 160 $66.94 $10,711.04 2b Spread topsoil 4" deep from pile to rough finish grade, front end loader, per cubic yard 1,975 $9.10 $17,972.90 2c Fescue, tractor spreader, per 1,000 square feet 160 $39.23 $6,276.00 EROSION AND SEDIMENTATION CONTROLS $14,134.60 SITE RESTORATION $34,959.94 PROPOSED BOND TOTAL $49,094.53 Note: Bond estimate prepared using RSMeans Site Works Landscape Cost Data, 44th Edition, 2025, New London.