HomeMy WebLinkAbout25IWC1-167 Meetinghouse Ln-E&S ChecklistErosion Sediment Control Checklist
Page 1 of 3
TRINGE TWO LOT RESUBDIVISION
EROSION & SEDIMENT CONTROL CHECKLIST
Monitoring and Maintenance: The E&S plan, and any revisions, shall identify an agent or agents who have
the responsibility and authority for the implementation, operation, monitoring and maintenance of E&S
measures. Such agent(s) shall be familiar with each control measure used including its limitations, installation,
inspection and maintenance. When control measures fail, or are found to be otherwise ineffective, such agent(s)
shall coordinate plan revisions with a professional experienced in erosion and sediment control and any
approving agency when that agency’s approval is required. Such agent(s) shall have the additional responsibility
for ensuring all erosion and sediment controls are properly installed and maintained the construction site before
predicted major storms. A major storm is defined as a storm predicted by the National Office of Atmospheric
Administration (NOAA) Weather Service with warnings of flooding, severe thunderstorms or similarly severe
weather conditions or effects.
Each measure has inspection requirements included in the measure’s section entitled "Maintenance". Many of
the measures require inspections at least once a week and within 24 hours of the end of a storm with a rainfall
amount of 0.5 inch or greater; some others require daily inspection. Only the permanent measures have less
frequent inspections. More frequent inspections than those identified in the measure may be necessary for sites
that are heavily traveled and before major storms.
NARRATIVE
N/A
☐ ☒ Purpose and description of project.
☐ ☒ Estimates of the total area of the project site and the total area of the site that is expected to
be disturbed by construction activities.
☐ ☒ Identification of site-specific erosion or sediment control concerns and issues.
☒ ☐ The phases of development if more than one phase is planned.
☐ ☒ The planned start and completion dates for each phase of the project.
Either provide or identify where in the E&S plan the following information is found:
☐ The design criteria, construction details and maintenance program for the erosion and
sediment control measures to be used.
☐ The sequence of major operations within each phase, such as installation of erosion
control measures, clearing, grubbing, excavation, grading, drainage and utility
installation, temporary stabilization, road base, paving for roadways and parking areas,
building construction, permanent stabilization, removal of temporary erosion control
measures.
☐ The time (in days) required for the major operations identified in the sequence.
☐ ☒ Identify other possible local, state and federal permits required.
Resubdivision Approval, Uncas Health District Approval and Public Works
Encroachment Permit
☒ ☐ Identify the conservation practices to be used.
☒ ☐ A listing of all other documents to be considered part of the E&S plan (e.g. reports of
hydraulic and hydrologic computations, boring logs, test pit logs, soils reports, etc.).
Erosion Sediment Control Checklist
Page 2 of 3
SUPPORT DOCUMENTS
N/A
☒ ☐ Hydraulic Calculations:
☐ Size and locations of existing and planned channels or waterways with design
calculations and construction details.
☐ Existing peak flows with calculations.
☐ Planned peak flows with calculations.
Changes in peak flows.
☐ Off-site effects of increased peak flows or volumes.
☐ Design calculations and construction details for engineered measures used to
control off- site erosion caused by the project.
☐ Design calculations and construction details for engineered measures used to
control erosion below culverts and storm sewer outlets.
☐ Design calculations and construction details for engineered measures used to
control groundwater, i.e. seeps, high water table, etc.
☐ Boring logs, test pits logs, soils reports, etc.
SITE DRAWING(S) CHECKLIST
N/A
☐ ☒ Jurisdictional features Required on All Maps or Drawings:
☒ North Arrow.
☒ Scale (including graphical scale).
☒ A title block containing the name of the project, the author of the map of drawing,
the owner of record for the project, date of drawing creation and any revision dates.
☒ Property lines.
☐ N/A For plans containing E&S measures which require an engineered design, the
signature and seal of a professional engineer licensed to practice in Connecticut.
☒ Scale (1:24,000 recommended).
☒ Project location (show property boundaries and at least the area that is within
1000 feet of the property boundaries).
☒ Roads, streets/buildings.
☐ N/A Major drainage ways (at least named watercourses).
☐ N/A Identification of any public drinking water supply watershed area.
☐ ☒ Topography, Natural Features and Regulatory Boundaries:
☒ Existing contours (2 foot intervals).
☒ Planned grades and elevations.
☐ N/A Seeps, springs.
☒ Limits of cuts and/or fills.
☐ N/A Soils, bedrock.
Erosion Sediment Control Checklist
Page 3 of 3
☒ Inland wetlands boundaries.
☐ N/A FEMA identified floodplains, floodways and State established stream channel
encroachment lines.
☐ N/A Streams, lakes, ponds, drainage ways, dams.
☐ N/A Existing vegetation.
☐ N/A Tidal wetland boundaries and coastal resource limits (e.g. mean high water,
shellfish beds, submerged aquatic vegetation, CAM boundary).
☐ N/A Public water supply watershed, wellheads or aquifer boundaries (when
available).
☒ ☐ Drainage Patterns
☐ Existing and planned drainage patterns (including offsite areas).
☐ Size of drainage areas.
☐ Size and location of culverts and storm sewers (existing and planned).
☐ Size and location of existing and planned channels or waterways.
☐ Major land uses of surrounding areas.
☒ ☐ Road and Utility Systems
☐ Planned and existing roads and buildings with their location and elevations.
☐ Access roads: temporary and permanent.
☐ Location of existing and planned septic systems.
☐ Location and size of existing and planned sanitary sewers.
☐ Location of other existing and planned utilities, telephones, electric, gas,
drinking water wells, etc.
☐ ☒ Clearing, Grading, Vegetation Stabilization
☒ Areas to be cleared, and sequence of clearing.
☒ Disposal of cleared material (off-site and on-site).
☒ Areas to be excavated or graded, and sequence of grading or excavation.
☐ N/A Areas and acreage to be vegetatively stabilized (temporary and/or permanent).
☐ N/A Planned vegetation with details of plants, seed, mulch, fertilizer, planting dates,
etc.
☐ ☒ Erosion & Sediment Control Drawing
☒ Location of E&S measure on site plan drawing with appropriate symbol.
☒ Construction drawings and specifications for measures.
☐ N/A Maintenance requirements of measures during construction of project.
☒ Person responsible for maintenance during construction of project.
☐ N/A Maintenance requirements of permanent measures after project completion.
☐ N/A Organization or person responsible for maintenance of permanent measures
having the authority to maintain and upgrade control measures as designed or
as needed to control erosion and sedimentation.
☐ N/A Handling of emergency situations (e.g. severe flooding, rains or other
environmental problems).
☐ N/A If not provided in the narrative, the information listed in checklist for
NARRATIVE.