Loading...
HomeMy WebLinkAbout24IWC11-375 Maple Ave-REV Site Improvement Plan Set 1-20-2524'± 20' 246 248250 250 248 246 244 242 240 23 8 236234 234 236238 240 242 252 252 252252250250248 246244 246244242240 238 236 234 232 230 228 22 0 222 224 226 228 2182 1 6 2 1 2 210 210 220 220218216 228 226 224 222 220 FLOOD ZONE AE (FROM FIRM PANEL 09011C0334G 7/18/2011) REGULATORY FLOODWAY UPLAND REVIEW AREA TP 1 TP 2 TP 8 TP 7 TP 3 TP 6 TP 4 TP 9 24'± 307 (HG D) URBAN LAND 34B (HG A) MERRIMAC FINE SANDY LOAM TEST PIT DATA TEST PITS EXCAVATED BY P&H CONSTRUCTION AS WITNESSED BY CLA ENGINEERS (D. Hayward & B. Russo) 07/18/2024. TP-1 Total Depth = 50" 0 - 15" Topsoil: Very dark brown, organic loam 15" - 46" Subsoil: Light gray brown loamy sand 46" - 50"Brown sand and gravel Groundwater @ 39" (Elev.=230.3) No ledge Mottles @ 30" (Elev.=231.0) TP-2 Total Depth = 87" 0 - 35" Wood chips 35" - 45" Topsoil: 45" - 73"Subsoil: Light brown-gray-green silt 73" - 83"Yellow brown fine sandy loam 83" - 87"Brown sand and gravel with pebbles and cobbles with trace silt Groundwater at 76" (Elev.=230.9) No ledge No Mottles TP-3 (Sample taken from 25" - 73") Total Depth = 73" 0" to 7" Topsoil: Brown fine sandy loam 7" to 25" Subsoil: Yellow brown fine sandy loam with cobbles and stones 25" to 73"Light brown, medium to coarse sand with gravel, cobbles and stones. Firm in place. No Groundwater No mottles No Ledge TP-4 Total Depth = 51" 0" to 13" Topsoil: Dark brown silty loam 13" to 26" Subsoil: Light brown silty loam 26" to 35"Dark yellow brown sand and gravel with trace silt 35" to 51"Yellow brown coarse sand and gravel No Groundwater No Ledge Mottles @ 22" (Elev. 235.3) TP-5 - Not performed TP-6 (Sample taken from 8" - 22") Total Depth = 66" (Firm at bottom) 0"- 8" Topsoil: Brown silty loam 8" - 22" Subsoil: Yellow brown fine sandy loam with gravel 22" - 42" Yellow brown coarse sand and gravel with cobbles Firm in place. Manganese staining. 42" to 66"Light brown medium sand and gravel and stones. Groundwater @ 63" (Elev.=230.57) No ledge Mottles @ 33" (Elev.=233.07) TP-7 Total Depth = 85" 0 "- 9"Topsoil: Dark brown sandy loam 9" - 21"Subsoil: Brown fine sandy loam 21" - 85"Light brown sand and gravel with cobbles and stones (46" Manganese staining - Dense) No Groundwater No ledge No Mottles TP-8 (Sample taken at 46" - 60") Total Depth = 86" 0 "- 16" Topsoil: Fill. Dark brown, light brown loamy sand 16" - 26"Original topsoil: Dark brown silty loam 26" - 46"Yellow brown sandy loam with cobbles and stones 46" - 60"Strong brown, light brown very fine sand 60" - 86"Gray, light brown sand and gravel with cobbles and stone No Groundwater No ledge Mottles at 36" (Elev.=235.17) TP-9 (Sample taken from 16" to 45") Total Depth = 62" 0 "- 16" Topsoil: Very dark brown, fine sandy loam 16" - 45"Subsoil: Yellow brown fine sandy loam with cobbles and stones 45" - 62"Gray brown coarse sand and gravel with cobbles Groundwater at 45" (Elev.=229.4) No ledge Mottles at 28" (Elev.=230.8) TOWN COMMENTS101/13/25 TOWN COMMENTS201/15/25 TOWN COMMENTS301/20/25 NRCS SOIL BOUNDARY SOIL SYMBOL (HYDROLOGICAL GROUP) SOIL DESCRIPTION LEGEND UPLAND REVIEW AREA 30' 15 15 31 R =5'R=4 0' 30' 30' 24'± 240 238 242 244 238 236 2 3 4 23223022822 6 240 242 242 236 234 236234238240238 236 DD TOWN COMMENTS101/13/25 TOWN COMMENTS201/15/25 TOWN COMMENTS301/20/25 PROPOSED DEVELOPMENT PROVIDE NEW BITUMINOUS CONCRETE PAVEMENT SECTION. (TYP. SHADED AREA) PROVIDE TOPSOIL & SEED OVER DISTURBED AREAS (TYP.) PROVIDE 12' x 60' PAINTED TRAILER PARKING SPACES PROVIDE BIT. CONC. CURB (DRIVEWAY CURB RETURNS ONLY) GRASS LINED SWALE 1A (SEE DETAIL)STORMWATER BASIN #1 STORMWATER BASIN #2 STOP SIGN AREA RESERVED FOR SNOW STORAGE (4 SPACES) PROVIDE BIT. CONC. CURB LIMIT OF GRADING (TYP.) MATCH EXISTING PAVEMENT REMOVE EXISTING BUILDING AND WELL GRASS LINED SWALE 2 (SEE DETAIL) MATCH EXISTING PAVEMENT STOP BAR ALL DISTURBED AREAS TO BE TREATED WITH 6" OF LOAM AND SEEDED WITH NEW ENGLAND ROADSIDE MATRIX MIX (SEE E&S PLAN FOR DETAILS) BASIN BOTTOM TO BE 6" OF LOAM AND SEEDED WITH NEW ENGLAND EROSION CONTROL/RESTORATION MIX FOR MOIST SITES (SEE E&S PLAN FOR DETAILS) STONE FILLED TRENCH (SEE DETAIL) LEGEND FLOOD ZONE AE (FROM FIRM PANEL 09011C0334G 7/18/2011) REGULATORY FLOODWAY INSTALL 40' GUARDRAIL CONNECT TO EXISTING GUARDRAIL GRASS LINED SWALE 1B (SEE DETAIL) GRASS LINED SWALE 1C (SEE DETAIL) REINSTATE ROADWAY PER TOWN OF MONTVILLE STANDARD DETAILS UPLAND REVIEW AREA R =5'R=4 0' 240 238 242 244 238 236 2 3 4 23223022822 6 240 242 242 236 234 236234238240228 220222 226 224 238 236 DD CB 'TYPE C WITH HOOD TF=247.2± INV IN MATCH EXIST (APPROX. 242.2) INV OUT=(30" NE)=239.00 5' DMH TF=238.5± INV IN=(30" SW)=234.00 INV OUT=(36" NE)=233.01 5' DMH TF=235.0± INV IN=(36" SW)=230.00 INV OUT=(36" E)=230.00 234 232 234 232 232 234 234234 246 244 230232 236 236 3.0:1 3.0:13.0:1 3.0:1OUTLET INV (36" )=229.8 SFSFSFSF SF SFSFSF SF 3.0:162' 24'± SEDIMENT FOREBAY 2 BOTT. ELEV. = 231.0 SEDIMENT FOREBAY 1B BOTT. ELEV. = 231.0 SEDIMENT FOREBAY 1A BOTT. ELEV. = 231.0 8' WIDE LEVEL SPREADER OUTLET ELEV. = 234.0 8' WIDE LEVEL SPREADER OUTLET ELEV. = 234.0 STORMWATER BASIN #1 BOTT. ELEV. = 231.0 STORMWATER BASIN #2 BOTT. ELEV. = 231.0 4' WIDE EARTHEN BERM TOP ELEV. = 234.0 4' WIDE EARTHEN BERM TOP ELEV. = 234.0 4' WIDE EARTHEN BERM TOP ELEV. = 234.0 166' - 30" CORRUGATED HDPE PIPE S=2.9% 173' - 36" CORRUGATED HDPE PIPE S=1.7% 46' - 36" CORRUGATED HDPE PIPE S=0.5% TOWN COMMENTS101/13/25 TOWN COMMENTS201/15/25 TOWN COMMENTS301/20/25 PROPOSED TREE LINE / CLEARING LIMITS TO MIMIC LIMIT OF DISTURBANCE (TYP.) GRASS LINED SWALE TYP. (SEE DETAIL) LIMIT OF GRADING (TYP.) GRASS LINED SWALE TYP. (SEE DETAIL) GRADE BREAK DISPOSE EXISTING CB AND PIPE DISPOSE EXISTING CB AND PIPE 'STANDARD' SIZE RIPRAP APRON (SEE DETAIL FOR DIMENSIONS) LEGEND FLOOD ZONE AE (FROM FIRM PANEL 09011C0334G 7/18/2011) REGULATORY FLOODWAY UPLAND REVIEW AREA 24'±DD CB 'TYPE C TF=247.2± INV OUT=(30" NE)=239.00 5' DMH TF=238.5± INV IN=(30" SW)=234.00 INV OUT=(36" NE)=233.01 5' DMH TF=235.0± INV IN=(36" SW)=230.00 INV OUT=(36" E)=230.00 46' - 36" CORRUGATED HDPE PIPE S=0.5% OUTLET 36" HDPE FES ELEV. =229.75 173' - 36" CORRUGATED HDPE PIPE S=1.7% 166' - 30" CORRUGATED HDPE PIPE S=2.9%238236240244246 232 SFSFSFSFSF SF 232 235 234 232 234 235 236SFSFSFSFSF SF SFSF SF SFSF SFSF SF SF SF SF SF SF SF S F TOWN COMMENTS101/13/25 TOWN COMMENTS201/15/25 TOWN COMMENTS301/20/25 TEMPORARY VEGETATIVE COVER SUGGESTED SITE PREPARATION CONSTRUCTION SEQUENCE SEDIMENT TRAP #1 (BOTT. ELEV. =232.0) TEMPORARY SEDIMENT TRAP NARRATIVE LEGEND APPROXIMATE WATERSHED SEDIMENT TRAP 1 APPROXIMATE WATERSHED SEDIMENT TRAP 2 SEDIMENT TRAP #1 (BOTT. ELEV. =232.0) GENERAL NOTES: 1.PRIOR TO CONSTRUCTION, THE PROPOSED LIMITS OF DISTURBANCE SHALL BE STAKED BY A LICENSED LAND SURVEYOR. 2.INLAND WETLAND BOUNDARIES SHALL BE RE-STAKED IN THE FIELD BY A LICENSED LAND SURVEYOR OR CERTIFIED SOIL SCIENTIST PRIOR TO INSTALLATION OF EROSION AND SEDIMENTATION CONTROL MEASURES. 3.AFTER STABILIZATION OF THE SLOPE BETWEEN BASIN #1 AND ROCKLAND POND, THE FOLLOWING SHRUBS SHALL BE PLANTED ALTERNATELY ALONG THE EDGE OF DISTURBANCE AT AN INTERVAL OF 10-FEET ON CENTER:10 HIGHBUSH BLUEBERRY, 10 NORTHERN ARROWWOOD VIBURNUM, 10 RED CHOKEBERRY INVASIVE PLANT CONTROL 1.AN ECOLOGIST/WETLANDS PROFESSIONAL WILL FLAG WOODY INVASIVES TO BE REMOVED IN THE VICINITY OF BASIN #1 (I.E., BETWEEN THE TOP OF BERM AND ROCKLAND POND) AND WEEDY SPECIES TO BE SPRAYED AT THE TIME OF PLAN IMPLEMENTATION, AND PREFERABLY JUST PRIOR TO ANY EARTHWORK. 2.TARGETED, RATHER THAN BROADCAST HERBICIDE APPLICATION METHODS, SHALL BE USED. FOR SPRING TREATMENT, CUT EARLY IN GROWING SEASON (LATE APRIL TO MID MAY) AND TREAT SMALL RESPROUTS IN EARLY SUMMER USING A LOW VOLUME SPRAYER. IN EARLY FALL USE THE “CUT-AND-PAINT METHOD,” APPLYING HERBICIDE TO A RECENTLY CUT STEM (WITHIN 10 MINUTES) ON BROADLEAF INVASIVES. USE A SELECTIVE HERBICIDE LIKE TRICLOPYR (FOUND IN BRUSH-B-GON, GARLON 3A OR 4A, AND OTHER PRODUCTS), RATHER THAN BROAD-SPECTRUM GLYPHOSATE, TO MINIMIZE IMPACTS ON NON-TARGET PLANTS AND SOIL FAUNA. SEE NOTES ON INVASIVE CONTROL. 3.INVASIVE PLANT CONTROL WITHIN THE AREAS OF PLANTINGS BETWEEN BASIN #1 AND THE POND SHALL TAKE PLACE FOR TWO (2) YEARS FOLLOWING THE YEAR OF PLAN IMPLEMENTATION (I.E., YEARS 1 AND 2), FOLLOWING THE PROCEDURES PROMULGATED BY THE CT DEEP'S CONNECTICUT INVASIVE PLANT WORKING GROUP (CIPWG), AND/OR THE NATURE CONSERVANCY. 4.THE ECOLOGIST/WETLANDS PROFESSIONAL WILL PREPARE A ANNUAL REPORT AND PROVIDE IT TO THE COMMISSION BY NOVEMBER 30 OF EACH YEAR. UPLAND REVIEW AREA STORMWATER MANAGEMENT & POLLUTION PREVENTION PLAN · · · · · · · · · · · REQUIRED AS TOWN COMMENTS101/13/25 TOWN COMMENTS201/15/25 TOWN COMMENTS301/20/25