Loading...
HomeMy WebLinkAbout24SITE6 - Bond EstimateErosion Control and Site Restoration Bond Estimate Sammy P Inc. 11080 Route 32 Uncasville, CT DATE: 8/20/2024 Page 1 of 1 Item No.Description Quantity Unit Cost Amount EROSION AND SEDIMENTATION CONTROLS 1a Anti-tracking pad, per square yard 135 $28.76 $3,882.40 SITE RESTORATION 2a Grade subgrade for base course, roadways, per square yard 3,730 $0.76 $2,842.63 2b Spread asphalt millings 3" deep from pile to rough finish grade, front end loader, per cubic yard 311 $9.13 $2,839.69 EROSION AND SEDIMENTATION CONTROLS $3,882.40 SITE RESTORATION $5,682.32 BOND SUBTOTAL $9,564.72 PROPOSED BOND AMOUNT $10,000.00 Note: Bond estimate prepared using RSMeans Heavy Construction Cost Data, 30th Edition, 2016, New London, adjusted for inflation.