Loading...
HomeMy WebLinkAbout23SITE10 225MapleAve AC AsstPlanner Comments2 1108231 \\planning\planningoffice$\PZC\Applications\2023\23SITE10 225 Maple Ave AnimalControlFacility\Staff\Asst. Planner\23SITE10 225MapleAve AC AsstPlanner Comments2 110823.doc TOWN OF MONTVILLE OFFICE OF THE ASST. PLANNER 310 Norwich-New London Turnpike, Uncasville, CT 06382 Telephone: (860) 848-6779 Email: mbadalucca@montville-ct.org MEMORANDUM FOR THE RECORD November 14, 2023 PZC Meeting Prepared by Meredith Badalucca, Asst. Planner Dept. of Land Use & Development on 11/08/2023 Property Address: 225 Maple Avenue, Parcel ID 077-041-000, Montville, CT Application: PZ #23SITE10 Applicant(s): Town of Montville Property Owner(s): Town of Montville Attorney: None Engineer: Donald W. Smith, P.E., Consulting Engineer Land Surveyor: CLA Engineers, Inc., Site Survey Horbal & Judson Land Surveyors & Assoc., Topographic Survey Lot Size: 11.77 +/- acres (512,701 SF) Lot Frontage: 848 feet (+/-) on Maple Avenue Zoning District: GOV - Government Public Water/Sewer: Yes. Wetlands/Watercourses: No. Flood Hazard Zone: No. CAM Zone: No. Public Water Supply Watershed: No. Proposed Public Improvements: Yes. Legal: Submitted to Land Use Office 10/6/23, Date of Receipt by PZC 10/24/23, Decision Required Date (DRD)12/27/2023. EXISTING CONDITIONS: The site is developed with the Town of Montville Public Works Department and current Animal Control Facility. PROPOSAL: Applicant states “Construct new animal control facility.” STAFF COMMENTS: Please be advised of the following comments regarding my review of the application, supporting documentation and plan set entitled “New Animal Control Facility at: Montville Animal Shelter, 225 Maple Ave., Montville, CT, Prepared by: Silver Petrucelli & Associates, Dated: 10/2/2023, Revised 10/23/2023”: 1. Revise Cover Sheet to include all revision dates. 2. Revise Cover Sheet to include Name and Address of Applicant/Owner. 3. Revise Approval Block on Cover Sheet to correct the spelling error of “Chairman” and “Expiration”. 2 \\planning\planningoffice$\PZC\Applications\2023\23SITE10 225 Maple Ave AnimalControlFacility\Staff\Asst. Planner\23SITE10 225MapleAve AC AsstPlanner Comments2 110823.doc 4. Revise plan to show vegetated or other buffer between outdoor dog runs on the northwest of the property and adjacent property used for residential purposes. Vegetative buffer was added near the quarantine kennels however, not on the northwest side of the property. 5. Note 2C- Reference Maps. Please provide a copy of map prepared by “Horbal & Judson Land Surveyors, Dated 7/26/23” for the record. 6. Revise Detail Sheet to include detail for full cut-off building mounted lighting. Free standing lighting detail is included on electrical site plan. 7. General Construction Sequence paragraph 1: delete “construction is expected to start in the Fall of 2023 and be completed by April 2025.” 8. Revise General Construction Sequence paragraph 2, to state “Town of Montville” versus “City”. 9. Revise plan to add maintenance schedule for stormwater structures. 10. Final plan set shall be signed and sealed by P.E, and L.S. as required prior to final endorsement.