Loading...
HomeMy WebLinkAbout23SITE10 225MapleAve AnShltr PJorgensenResponseTEComment1 Rec110623Silver Petrucelli + Associates 3190 Whitney Avenue | Hamden, CT 06518 311 State Street | New London, CT 06320 203 230 9007 silverpetrucelli.com ARCHITECT’S PLAN REVIEW REPONSE PROJECT: Montville Animal Shelter Date: November 2, 2023 225 Maple Avenue Montville, Ct 06791 SPA #22.130 ☒ REVIEWER: CLA Engineers on October 26, 2023 REMARKS: FROM: P. Jorgensen JOB NUMBER: 22.130 DISTRIBUTION: SP+A FILE NO. COMMENT ARCHITECT RESPONSE 1 The orientation of the building with the front facing away from Maple Avenue should be reconsidered Town input needed – bldg located per prior direction 2. The trees along Maple Avenue have been removed, additional screening should be provided. Town input needed – bldg located per prior direction 3. The site lighting should be described on the plans with notes regarding glare and spillage. See Electrical plans for fixtures, etc 4. The yard drain outlet culvert should be straight, or an additional yard drain added at the proposed culvert angle point. DWS Will address 5. Trash removal should be described on the plans. Town input needed .. do they want/ need a dumpster pad or is trash kept inside and removed daily? 6. A detail of the timber guard rail should be added to the plans. DWS Will address 7. The silt sack detail should be included in the E&S plan, and the sacks removed once the site is stabilized. DWS Will address 8. A cross section of the stormwater management area should be included on the plans and surface treatment detailed. DWS Will address 9. The soil testing results should be included with the application. DWS Will address 10. The need for fencing to separate the adjacent playground for the proposed facility should be considered. Town input needed