HomeMy WebLinkAbout23SITE10 225MapleAve AnShltr DWSmith ResponseTEComment1 Rev110823Silver Petrucelli + Associates
3190 Whitney Avenue | Hamden, CT 06518
311 State Street | New London, CT 06320
203 230 9007 silverpetrucelli.com
ARCHITECT’S PLAN REVIEW REPONSE
PROJECT: Montville Animal Shelter Date: RVSD Nov. 8, 2023
225 Maple Avenue
Montville, Ct 06791
SPA #22.130
☒ REVIEWER: CLA Engineers on October 26, 2023
REMARKS:
FROM: P. Jorgensen JOB NUMBER: 22.130
DISTRIBUTION: SP+A FILE
NO. COMMENT ARCHITECT RESPONSE
1 The orientation of the building with the front facing
away from Maple Avenue should be reconsidered
Town input needed – bldg located per prior direction
2. The trees along Maple Avenue have been
removed, additional screening should be provided.
Town input needed – bldg located per prior direction
3. The site lighting should be described on the plans
with notes regarding glare and spillage.
See Electrical plans for fixtures, etc
4. The yard drain outlet culvert should be straight, or
an additional yard drain added at the proposed
culvert angle point.
DWS will add additional yard drain
5. Trash removal should be described on the plans. Town input needed .. do they want/ need a dumpster
pad or is trash kept inside and removed daily?
6. A detail of the timber guard rail should be added to
the plans.
DWS will add detail
7. The silt sack detail should be included in the E&S
plan, and the sacks removed once the site is
stabilized.
DWS Will add detail & note
8. A cross section of the stormwater management
area should be included on the plans and surface
treatment detailed.
DWS Will add cross section to plan
9. The soil testing results should be included with the
application.
DWS Will add soil test results to plan set
10. The need for fencing to separate the adjacent
playground for the proposed facility should be
considered.
Town input needed