HomeMy WebLinkAboutInspection Report 6-26-2024Town of Montville Inspection Report
1 | Page
Date: 6/26/2024 Inspection Type: Choose an item.
Yes No MS4/ Erosion and Sediment Control Inspection ☐ ☒
Location: 303 Route 32 Map/Lot/Block: 070-004-000 Parties Present
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose an
item.
Meredith Badalucca
Stacy Radford
Click here to enter text.
Click here to enter text.
Yes No
CZC Approved ☐ ☒
Comments/Observations
Resolution Date: Click here to enter a date.
Inspection as part of modified site plan application.
Town of Montville Inspection Report
2 | Page
As-built indicates light pole as an encroachment. Stone was not part of approved plan or
approved phasing plan. Consent and easement from property owner is required.
Town of Montville Inspection Report
3 | Page
As-built indicates light pole as an encroachment. Stone was not part of approved plan
or approved phasing plan. Consent and easement from property owner is required.
Town of Montville Inspection Report
4 | Page
Parking area not constructed per approved plan. Curbing and lighting added, retaining
wall relocated, dimension of parking area changed and timber guard rail versus metal
guard rail.
Town of Montville Inspection Report
5 | Page
Traffic island is smaller than approved plan. Yellow stripping indicates approved size. Stone encroaching onto
abutting property owner. Consent and easement required.
Town of Montville Inspection Report
6 | Page
Dumpster relocated from approved plan to a parking space. Modification plan shows additional relocation to front of
property so garbage truck does not have to back down one way ingress. This area including side walk and decorative
wall are not constructed per approved plan.
Town of Montville Inspection Report
7 | Page
Modifications to Phase 1 building which are obstructing one-way egress from both rear parking areas. This
modification is not shown on modified site plan.
Town of Montville Inspection Report
8 | Page
Town of Montville Inspection Report
9 | Page
Unapproved addition of parallel spot due to relocation of dumpster to parking spot. Modified site plan proposes 2nd
relocation of dumpster to the front of the site. This will eliminate the need for this space. Work truck parked in a
non-parking space.
Town of Montville Inspection Report
10 | Page
Only egress from rear of property. Building with 3 garage doors is the Phase II building. Balcony shown is part of
Phase I building. Phase II building is 2 feet from property line.
Town of Montville Inspection Report
11 | Page
Interior demolition of Phase II building has started.
Town of Montville Inspection Report
12 | Page
Town of Montville Inspection Report
13 | Page
Appears trees may have been trimmed beyond property line. LS will need to verify and consent
obtained.
Town of Montville Inspection Report
14 | Page
Modification work on Phase I building, construction truck not parked in parking space. Lift also
blocking one-way egress.
Town of Montville Inspection Report
15 | Page
Retaining wall to the northeast of the property. Difficult to photograph without going onto
abutter’s property. Had to lean over chain link fence on 303 Route 32.
Town of Montville Inspection Report
16 | Page
Town of Montville Inspection Report
17 | Page
Town of Montville Inspection Report
18 | Page
Phase I Building. Stairs to balcony that partially hangs over one-way egress. Mailboxes that were not on approved
plan.
Town of Montville Inspection Report
19 | Page
Contractors working inside of Phase II building. One-way egress, do not enter sign.
Town of Montville Inspection Report
20 | Page
Proposed location of additional bollard. Power cord running over head from Phase I building to Phase II building.
Town of Montville Inspection Report
21 | Page
Proposed location of additional bollard at Phase I building near balcony.
Town of Montville Inspection Report
22 | Page
Handicap detection pads appear to be larger than shown on As-built.
Town of Montville Inspection Report
23 | Page
Handicap detection pads appear to be larger than shown on As-built.
Town of Montville Inspection Report
24 | Page
This area is indicated as stone on As-Built.
Town of Montville Inspection Report
25 | Page
This area is indicated as stone on As-Built.
Town of Montville Inspection Report
26 | Page
Work being done in Phase II building.
Town of Montville Inspection Report
27 | Page
Handicap parking space in front of Phase II building.
Town of Montville Inspection Report
28 | Page
Door lights proposed on modified plan.
Town of Montville Inspection Report
29 | Page
Modification to Phase I building not on modified site plan. Lift obstructing one-way
egress.
Town of Montville Inspection Report
30 | Page
Truck parked in front of dumpster and into one-way egress.
Town of Montville Inspection Report
31 | Page
Due to lift and commercial truck not parked in parking spot and obstructing one-way egress,
we needed to do a several point turn to exit rear parking area. Only other option was to go the