HomeMy WebLinkAboutInspection Report 6-26-2024Town of Montville Inspection Report 1 | Page Date: 6/26/2024 Inspection Type: Choose an item. Yes No MS4/ Erosion and Sediment Control Inspection ☐ ☒ Location: 303 Route 32 Map/Lot/Block: 070-004-000 Parties Present Choose an item. Choose an item. Choose an item. Choose an item. Choose an item. Meredith Badalucca Stacy Radford Click here to enter text. Click here to enter text. Yes No CZC Approved ☐ ☒ Comments/Observations Resolution Date: Click here to enter a date. Inspection as part of modified site plan application. Town of Montville Inspection Report 2 | Page As-built indicates light pole as an encroachment. Stone was not part of approved plan or approved phasing plan. Consent and easement from property owner is required. Town of Montville Inspection Report 3 | Page As-built indicates light pole as an encroachment. Stone was not part of approved plan or approved phasing plan. Consent and easement from property owner is required. Town of Montville Inspection Report 4 | Page Parking area not constructed per approved plan. Curbing and lighting added, retaining wall relocated, dimension of parking area changed and timber guard rail versus metal guard rail. Town of Montville Inspection Report 5 | Page Traffic island is smaller than approved plan. Yellow stripping indicates approved size. Stone encroaching onto abutting property owner. Consent and easement required. Town of Montville Inspection Report 6 | Page Dumpster relocated from approved plan to a parking space. Modification plan shows additional relocation to front of property so garbage truck does not have to back down one way ingress. This area including side walk and decorative wall are not constructed per approved plan. Town of Montville Inspection Report 7 | Page Modifications to Phase 1 building which are obstructing one-way egress from both rear parking areas. This modification is not shown on modified site plan. Town of Montville Inspection Report 8 | Page Town of Montville Inspection Report 9 | Page Unapproved addition of parallel spot due to relocation of dumpster to parking spot. Modified site plan proposes 2nd relocation of dumpster to the front of the site. This will eliminate the need for this space. Work truck parked in a non-parking space. Town of Montville Inspection Report 10 | Page Only egress from rear of property. Building with 3 garage doors is the Phase II building. Balcony shown is part of Phase I building. Phase II building is 2 feet from property line. Town of Montville Inspection Report 11 | Page Interior demolition of Phase II building has started. Town of Montville Inspection Report 12 | Page Town of Montville Inspection Report 13 | Page Appears trees may have been trimmed beyond property line. LS will need to verify and consent obtained. Town of Montville Inspection Report 14 | Page Modification work on Phase I building, construction truck not parked in parking space. Lift also blocking one-way egress. Town of Montville Inspection Report 15 | Page Retaining wall to the northeast of the property. Difficult to photograph without going onto abutter’s property. Had to lean over chain link fence on 303 Route 32. Town of Montville Inspection Report 16 | Page Town of Montville Inspection Report 17 | Page Town of Montville Inspection Report 18 | Page Phase I Building. Stairs to balcony that partially hangs over one-way egress. Mailboxes that were not on approved plan. Town of Montville Inspection Report 19 | Page Contractors working inside of Phase II building. One-way egress, do not enter sign. Town of Montville Inspection Report 20 | Page Proposed location of additional bollard. Power cord running over head from Phase I building to Phase II building. Town of Montville Inspection Report 21 | Page Proposed location of additional bollard at Phase I building near balcony. Town of Montville Inspection Report 22 | Page Handicap detection pads appear to be larger than shown on As-built. Town of Montville Inspection Report 23 | Page Handicap detection pads appear to be larger than shown on As-built. Town of Montville Inspection Report 24 | Page This area is indicated as stone on As-Built. Town of Montville Inspection Report 25 | Page This area is indicated as stone on As-Built. Town of Montville Inspection Report 26 | Page Work being done in Phase II building. Town of Montville Inspection Report 27 | Page Handicap parking space in front of Phase II building. Town of Montville Inspection Report 28 | Page Door lights proposed on modified plan. Town of Montville Inspection Report 29 | Page Modification to Phase I building not on modified site plan. Lift obstructing one-way egress. Town of Montville Inspection Report 30 | Page Truck parked in front of dumpster and into one-way egress. Town of Montville Inspection Report 31 | Page Due to lift and commercial truck not parked in parking spot and obstructing one-way egress, we needed to do a several point turn to exit rear parking area. Only other option was to go the wrong way down a one-way ingress. (I was the passenger taking this photo!)