Loading...
HomeMy WebLinkAboutInspection Report 5-28-2024Town of Montville Inspection Report 1 Date: 5/28/2024 Inspection Type: Zoning Permit Inspection/CZC Yes No MS4/ Erosion and Sediment Control Inspection ☐ ☒ Location: 303 Route 32 Map/Lot/Block: 070-004-000 Parties Present Choose an item. Choose an item. Choose an item. Choose an item. Choose an item. Stacy Radford Click here to enter text. Click here to enter text. Click here to enter text. Yes No CZC Approved ☐ ☒ Comments/Observations Resolution Date: Click here to enter a date. Did follow up inspection of 4/30/2024 inspection of Phase I. There are still items that are not in compliance with the approved “Phased Site Plan” and/or the As-Built dated 2/13/2024 REV 4/30/2024. Town of Montville Inspection Report 2 Chain link fence has been installed per the approved Phasing Plan Town of Montville Inspection Report 3 Not wide enough to be an approved parking spot Town of Montville Inspection Report 4 Parking spot is 9’ wide Town of Montville Inspection Report 5 Chain link fence has been installed per the approved Phasing Plan Town of Montville Inspection Report 6 Sidewalk is not flush with pavement (see below) Town of Montville Inspection Report 7 Sidewalk is not flush with pavement Town of Montville Inspection Report 8 Roadway has been widened in accordance with approved Phasing Plan Town of Montville Inspection Report 9 Signs have been installed in accordance with approved Phasing Plan Town of Montville Inspection Report 10 Island is raised in accordance with approved Phasing Plan (14’ x 13’ x 18’) Bollards installed not per the approved Plan Town of Montville Inspection Report 11 Dumpster has been enclosed but is not placed per the approved Phasing Plan Town of Montville Inspection Report 12 Signs installed per the approved Phasing Plan Location of enclosed dumpster on concrete pad, per approved Phasing Plan Town of Montville Inspection Report 13 5 parking spaces, not in accordance with the approved Phasing Plan – should be 6 Town of Montville Inspection Report 14 6th parking spot is being occupied by the dumpster (not per the approved Phasing Plan) Town of Montville Inspection Report 15 Town of Montville Inspection Report 16 Lights not installed in accordance with approved Plan (no modification has been requested) Town of Montville Inspection Report 17 Town of Montville Inspection Report 18 Chain link fence has been installed per the approved Phasing Plan) Town of Montville Inspection Report 19 Town of Montville Inspection Report 20 New parking spot added but not per approved Phasing Plan or the As-Built. Parallel spot with no stop bar headed toward a handicap parking spot. Town of Montville Inspection Report 21 New “parallel” parking spot added without modification request and/or on As-Built Town of Montville Inspection Report 22 5 parking spots in accordance with approved Phasing Plan Town of Montville Inspection Report 23 Building area to be demolished Signs have been installed per the approved Phasing Plan Bollard was to be installed at the corner of the overhang, per approved Phasing Plan. Not installed and not shown on As-Built. Bollards in front of Building 1 were to be removed in accordance with approved Phasing Plan. Still exist and are shown on As-Built. Town of Montville Inspection Report 24 Portion of building being proposed to be demolished Town of Montville Inspection Report 25 Grass, sidewalk and curbing in State Right of Way. In compliance per email from Dan McBride (State of CT DOT) dated 5/22/2024 Town of Montville Inspection Report 26 Sidewalk, break-away stop sign, handicap ramps, and handicap detection pads are all in compliance per State of CT DOT Town of Montville Inspection Report 27 State Right of Way – all in compliance per email of 5/22/2024 from Dan McBride Town of Montville Inspection Report 28 Pavement brought up to handicap ramp per State of CT DOT Town of Montville Inspection Report 29 Town of Montville Inspection Report 30 Town of Montville Inspection Report 31 Town of Montville Inspection Report 32 Bollards to have been removed per the approved Phasing Plan. These are still present and shown on As-Built. No building mounted light fixture has been installed, as per the approved Plan Town of Montville Inspection Report 33 Town of Montville Inspection Report 34 Building mounted light fixture not place in accordance with approved Plan Town of Montville Inspection Report 35 Building mounted light fixtures not placed in accordance with approved Plan Town of Montville Inspection Report 36 Town of Montville Inspection Report 37 Town of Montville Inspection Report 38