HomeMy WebLinkAboutInspection Report 5-28-2024Town of Montville Inspection Report
1
Date: 5/28/2024 Inspection Type: Zoning Permit Inspection/CZC
Yes No MS4/ Erosion and Sediment Control Inspection ☐ ☒
Location: 303 Route 32 Map/Lot/Block: 070-004-000 Parties Present
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose an
item.
Stacy Radford
Click here to enter text.
Click here to enter text.
Click here to enter text.
Yes No
CZC Approved ☐ ☒
Comments/Observations
Resolution Date: Click here to enter a date.
Did follow up inspection of 4/30/2024 inspection of Phase I. There are still items that are not in compliance
with the approved “Phased Site Plan” and/or the As-Built dated 2/13/2024 REV 4/30/2024.
Town of Montville Inspection Report
2
Chain link fence has been installed
per the approved Phasing Plan
Town of Montville Inspection Report
3
Not wide
enough to
be an
approved
parking spot
Town of Montville Inspection Report
4
Parking spot is 9’ wide
Town of Montville Inspection Report
5
Chain link fence
has been
installed per the
approved
Phasing Plan
Town of Montville Inspection Report
6
Sidewalk is not flush
with pavement (see
below)
Town of Montville Inspection Report
7
Sidewalk is not
flush with
pavement
Town of Montville Inspection Report
8
Roadway has been widened
in accordance with
approved Phasing Plan
Town of Montville Inspection Report
9
Signs have been installed
in accordance with
approved Phasing Plan
Town of Montville Inspection Report
10
Island is raised
in accordance
with approved
Phasing Plan
(14’ x 13’ x 18’)
Bollards
installed not
per the
approved Plan
Town of Montville Inspection Report
11
Dumpster has
been enclosed but
is not placed per
the approved
Phasing Plan
Town of Montville Inspection Report
12
Signs
installed per
the
approved
Phasing
Plan
Location of
enclosed
dumpster on
concrete pad,
per approved
Phasing Plan
Town of Montville Inspection Report
13
5 parking spaces, not in accordance with the
approved Phasing Plan – should be 6
Town of Montville Inspection Report
14
6th parking spot
is being occupied
by the dumpster
(not per the
approved
Phasing Plan)
Town of Montville Inspection Report
15
Town of Montville Inspection Report
16
Lights not installed in accordance with
approved Plan (no modification has
been requested)
Town of Montville Inspection Report
17
Town of Montville Inspection Report
18
Chain link fence
has been
installed per the
approved
Phasing Plan)
Town of Montville Inspection Report
19
Town of Montville Inspection Report
20
New parking spot added but not
per approved Phasing Plan or
the As-Built. Parallel spot with
no stop bar headed toward a
handicap parking spot.
Town of Montville Inspection Report
21
New “parallel”
parking spot
added without
modification
request and/or
on As-Built
Town of Montville Inspection Report
22
5 parking spots
in accordance
with approved
Phasing Plan
Town of Montville Inspection Report
23
Building
area to be
demolished
Signs have been
installed per
the approved
Phasing Plan
Bollard was to be installed at the corner of the overhang, per
approved Phasing Plan. Not installed and not shown on As-Built.
Bollards in front of Building 1 were to be removed in accordance
with approved Phasing Plan. Still exist and are shown on As-Built.
Town of Montville Inspection Report
24
Portion of building
being proposed to
be demolished
Town of Montville Inspection Report
25
Grass, sidewalk and curbing in State Right of
Way. In compliance per email from Dan
McBride (State of CT DOT) dated 5/22/2024
Town of Montville Inspection Report
26
Sidewalk, break-away stop sign, handicap
ramps, and handicap detection pads are all
in compliance per State of CT DOT
Town of Montville Inspection Report
27
State Right of Way – all in
compliance per email of
5/22/2024 from Dan McBride
Town of Montville Inspection Report
28
Pavement brought up to handicap
ramp per State of CT DOT
Town of Montville Inspection Report
29
Town of Montville Inspection Report
30
Town of Montville Inspection Report
31
Town of Montville Inspection Report
32
Bollards to have been removed per the
approved Phasing Plan. These are still
present and shown on As-Built.
No building
mounted
light fixture
has been
installed, as
per the
approved
Plan
Town of Montville Inspection Report
33
Town of Montville Inspection Report
34
Building mounted light fixture not place
in accordance with approved Plan
Town of Montville Inspection Report
35
Building mounted light fixtures not
placed in accordance with approved Plan
Town of Montville Inspection Report
36
Town of Montville Inspection Report
37
Town of Montville Inspection Report
38