Loading...
HomeMy WebLinkAbout23SUB1-958Rte163-Potential Development Plan Rec 8-31-23ROUTE 163 20'14' PROPERTY LINE (TYP.) BUILDING SETBACK LINE (TYP.) PROPOSED WELL PR 4-BDRM HOUSE FFE = 468 . 0 0 EXISTING WELL PROPOSED LOT 2 20.853± AC 908,376± SF PROPOSED LOT 1 9.803± AC 427,021± SF INSTALL 1,250 GALLON SEPTIC TANK TF = 470.00 INV(IN) = 464.87 INV(OUT) = 464.62 PROPOSED PRIMARY LEACHING SYSTEM 2 ROWS OF MANTIS 536-8 40 LF & 35 LF, 75 LF TOTAL BOT. OF CHAMBER = 462.11 PROPOSED RESERVE LEACHING SYSTEM 2 ROWS OF MANTIS 536-8 40 LF & 35 LF, 75 LF TOTAL 462 PROPOSED PAVEMENT SAWCUT LINE (TYP.) PROTECT AND MAINTAIN ALL STRUCTURES, BUILDINGS, AND TREES ON LOT 1 460 458 456 454 452 450 448 446 444 442 440 75' 468.7575' PROPOSED RESERVE LEACHING SYSTEM 2 ROWS OF MANTIS 536-8 40 LF & 35 LF, 75 LF TOTAL 464466468470 472 474472470468 EXISTING 4-BEDROOM RESIDENCE TP-105 PT-105 TP-101 PT-101 TP-103 PT-103 TP-104 TP-102 TP-106 PT-107 TP-107 TP-108 TP-109 MAX DRIVEWAY GRADE = 10% PROPOSED BITUMINOUS CONCRETE PAVEMENT (TYP.) 467.33 PROPOSED ELECTRIC/TELECOMMUNICATIONS HANDHOLES PER UTILITY PROVIDER'S STANDARDS AND SPECIFICATIONS CONNECT PROPOSED ELECTRICAL SERVICE FROM UTILITY POLE #4438 INSTALL DISTRIBUTION BOX INV (IN) = 463.36 INV(OUT) = 463.11 INSTALL 60 LF OF 4" SDR-35 PVC PIPE AT 2.1% APPROXIMATE LOCATION OF EXISTING SUBSURFACE SEWAGE DISPOSAL LEACHING AREA 40 L F 35 L F33'36' 4 0 L F 3 5 L F 4 0 L F 3 5 L F SSWR INV(OUT) = 465.5 INSTALL 30 LF OF 4" SDR-35 PVC PIPE AT 2.1% EXISTING BENCHMARK (REBAR W/ CAP) 14' GRADE TO DRAIN (TYP.) 13' PROPOSED BITUMINOUS CONCRETE PAVEMENT (TYP.) EXISTING CONCRETE SLAB ONLY TO REMAIN (NO BUILDING MAY BE CONSTRUCTED ON THE EXISTING SLAB EXCEPT IN CONFORMITY WITH THE SETBACK REQUIREMENTS OF THE ZONE) REMOVE AND DISPOSE OF EXISTING CONCRETE SLAB PROPOSED FOUNDATION DRAIN (TYP.) PROPOSED FES FOR FOUNDATION DRAIN INV (OUT)= 456.00' MAINTAIN EXISTING SHARED DRIVEWAY (TYP.) LEGEND PROPERTY LINE ADJOINING LOT LINE BUILDING SETBACK SAWCUT PAVEMENT LINE EDGE OF PAVEMENT LIMIT OF WETLANDS LIMIT OF UPLAND REVIEW AREA PRIMARY LEACHING TRENCH TEST PIT LOCATION PERCOLATION TEST HOLE TP-103 PT-103 RESERVE LEACHING TRENCH PROPOSED WELL EXISTING WELL 75' WELL BUFFER PROPOSED TREE LINE EXISTING TREE LINE MAJOR CONTOURS MINOR CONTOURS 420 EXISTING MAJOR CONTOURS EXISTING MINOR CONTOURS 421 SANITARY SEWER PIPE UNDERGROUND ELECTRIC, TELEPHONE AND CABLE LINES ROUTE 163 PROPOSED LOT 2 20.853± AC 908,376± SF PROPOSED LOT 1 9.803± AC 427,021± SF EXISTING PROPERTY LINE (TYP.) BUILDING SETBACK LINE (TYP.) LIMITS OF EXISTING WETLANDS (TYP.) LIMITS OF UPLAND REVIEW AREA (TYP.) LIMITS OF EXISTING WETLANDS (TYP.) 501 Main Street, Monroe, CT 06468 11 Vanderbilt Ave, Norwood, MA 02062 Sheet Title:Sheet #: Project: Drawn By: Checked By: Approved By: Project #: Plan Date: Scale: PROPOSED 1-LOT RESUBDIVISION OF 958 ROUTE 163 (PARCEL ID : 046-008-000) OAKDALE, CONNECTICUT JULY 17, 2023 Graphic Scale: Rev. #:Date Description KMS 22109401 07/17/23 ENGINEERING Kevin Solli, P.E. CT 25759 T: (203) 880-5455 F: (203) 880-9695 T: (781) 352-8491 F: (203) 880-9695 POTENTIAL DEVELOPMENT PLAN 2.11 30 0 30 60 1" = 30' CJB AWC PRIMARY SEPTIC SYSTEM DESIGN RESERVE SEPTIC SYSTEM DESIGN ALL PRIMARY AND RESERVE LEACHING AREAS WERE DESIGNED IN ACCORDANCE WITH CONNECTICUT PUBLIC HEALTH CODE, ON-SITE SEWAGE DISPOSAL REGULATIONS, AND TECHNICAL STANDARDS FOR SUBSURFACE SEWAGE DISPOSAL SYSTEMS. ALL PRIMARY AND RESERVE LEACHING AREAS WERE DESIGNED IN ACCORDANCE WITH CONNECTICUT PUBLIC HEALTH CODE, ON-SITE SEWAGE DISPOSAL REGULATIONS, AND TECHNICAL STANDARDS FOR SUBSURFACE SEWAGE DISPOSAL SYSTEMS. PRIMARY SYSTEM 4-BEDROOM BUILDING PERCOLATION RATE = 10.1-20.0 REQUIRED EFFECTIVE LEACHING AREA (ELA): 4-BEDROOM BUILDING: 787.5 SF PROPOSED LEACHING SYSTEM: MANTIS 536-8 GALLERY DEPTH = 18 IN GALLERY WIDTH = 36 IN LEACHING SYSTEM ELA = 11.0 SF/LF CENTER TO CENTER SPACING = 12 FT SYSTEM LENGTH = 787.5 SF ÷ 11.0 SF/LF = 71.6 LF USE 75 LF OF MANTIS 536-8 LEACHING SYSTEM RESERVE SYSTEM 4-BEDROOM BUILDING PERCOLATION RATE = 10.1-20.0 REQUIRED EFFECTIVE LEACHING AREA (ELA): 4-BEDROOM BUILDING: 787.5 SF PROPOSED LEACHING SYSTEM: MANTIS 536-8 GALLERY DEPTH = 18 IN GALLERY WIDTH = 36 IN LEACHING SYSTEM ELA = 11.0 SF/LF CENTER TO CENTER SPACING = 12 FT SYSTEM LENGTH = 787.5 SF ÷ 11.0 SF/LF = 71.6 LF USE 75 LF OF MANTIS 536-8 LEACHING SYSTEM MINIMUM LEACHING SYSTEM SPREAD (MLSS): SLOPES = 6.1-8.0 RECEIVING SOIL DEPTH = 34 IN HYDRAULIC FACTOR (HF) = 26 FLOW FACTOR (FF) = 1.75 PERCOLATION FACTOR (PF) = 1.0 MLSS = HF x FF x PF = 26 x 1.75 x 1.0 = 46 75 LF > 46 LF; MEETS MLSS REQUIREMENTS GENERAL NOTES 1.THESE PLANS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOT FOR CONSTRUCTION. NO CONSTRUCTION OR DEMOLITION SHALL BEGIN UNTIL APPROVAL OF THE FINAL PLANS IS GRANTED BY ALL GOVERNING AND REGULATORY AGENCIES. 2.ALL PROPOSED SITE WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALL PERMITS, APPROVALS, AND CONDITIONS OF APPROVALS ISSUED BY LOCAL, STATE, AND/OR FEDERAL REVIEWING AGENCIES. 3.EXISTING BOUNDARY, TOPOGRAPHY AND SITE CONDITIONS INFORMATION TAKEN FROM A PLAN ENTITLED "PROPERTY & TOPOGRAPHIC SURVEY OF 958 OAKDALE ROAD (CONNECTICUT ROUTE 163), MONTVILLE, CONNECTICUT"; SCALE 1"=60'; DATED: 03/2023; BY "DGT ASSOCIATES." 4.ALL CONSTRUCTION SHALL COMPLY WITH TOWN OF MONTVILLE STANDARDS, AND THE CONNECTICUT DEPARTMENT OF TRANSPORTATION STANDARDS AND SPECIFICATIONS IN THE ABOVE REFERENCED INCREASING HIERARCHY. IF SPECIFICATIONS ARE IN CONFLICT, THE MORE STRINGENT SPECIFICATION SHALL APPLY. ALL CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE OSHA, FEDERAL, STATE AND LOCAL REGULATIONS. 5.THE OWNER IS RESPONSIBLE FOR OBTAINING ALL NECESSARY ZONING PERMITS REQUIRED BY GOVERNMENT AGENCIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL OBTAIN ALL COUNTY AND TOWN CONSTRUCTION PERMITS, INCLUDING SEWER AND WATER CONNECTION PERMITS. THE CONTRACTOR SHALL POST ALL BONDS, PAY ALL FEES, PROVIDE PROOF OF INSURANCE AND PROVIDE TRAFFIC CONTROL NECESSARY FOR THIS WORK. 6.THE CONTRACTOR SHALL VERIFY ALL SITE CONDITIONS IN THE FIELD AND CONTACT THE ENGINEER OF RECORD IF THERE ARE ANY QUESTIONS OR CONFLICTS REGARDING THE CONSTRUCTION DOCUMENTS AND/OR FIELD CONDITIONS SO THAT APPROPRIATE REVISIONS CAN BE MADE PRIOR TO BIDDING. ANY CONFLICT BETWEEN THE DRAWINGS SHALL BE CONFIRMED WITH THE OWNER'S CONSTRUCTION MANAGER PRIOR TO BIDDING. 7.SHOULD ANY UNCHARTED OR INCORRECTLY CHARTED, EXISTING PIPING, OR OTHER UTILITY BE UNCOVERED DURING EXCAVATION, CONSULT THE ENGINEER OF RECORD IMMEDIATELY FOR DIRECTIONS BEFORE PROCEEDING FURTHER WITH WORK IN THIS AREA. 8.DO NOT INTERRUPT EXISTING UTILITIES SERVICING FACILITIES OCCUPIED AND USED BY THE OWNER OR OTHERS DURING OCCUPIED HOURS EXCEPT WHEN SUCH INTERRUPTIONS HAVE BEEN AUTHORIZED IN WRITING BY THE OWNER AND THE LOCAL MUNICIPALITIES. INTERRUPTIONS SHALL ONLY OCCUR AFTER ACCEPTABLE TEMPORARY SERVICE HAS BEEN PROVIDED. 9.THE CONTRACTOR SHALL RESTORE ANY DRAINAGE STRUCTURE, PIPE, UTILITY, PAVEMENT, CURBS, SIDEWALKS, LANDSCAPED AREAS OR SIGNAGE DISTURBED DURING CONSTRUCTION TO THEIR ORIGINAL CONDITION OR BETTER, AS APPROVED BY THE ENGINEER OF RECORD. 10.THE ENGINEER OF RECORD IS NOT RESPONSIBLE FOR SITE SAFETY MEASURES TO BE EMPLOYED DURING CONSTRUCTION. THE ENGINEER OF RECORD HAS NO CONTRACTUAL DUTY TO CONTROL THE SAFEST METHODS OR MEANS OF THE WORK, JOB SITE RESPONSIBILITIES, SUPERVISION OR TO SUPERVISE SAFETY AND DOES NOT VOLUNTARILY ASSUME ANY SUCH DUTY OR RESPONSIBILITY. 11.ALTERNATIVE METHODS AND PRODUCTS OTHER THAN THOSE SPECIFIED MAY BE USED IF REVIEWED AND APPROVED BY THE OWNER, ENGINEER OF RECORD, AND APPROPRIATE REGULATORY AGENCY PRIOR TO INSTALLATION DURING THE BIDDING PROCESS. 12.INFORMATION ON EXISTING UTILITIES AND STORM DRAINAGE SYSTEMS HAS BEEN COMPILED FROM AVAILABLE INFORMATION INCLUDING UTILITY PROVIDER AND MUNICIPAL RECORD MAPS AND/OR FIELD SURVEY AND IS NOT GUARANTEED CORRECT OR COMPLETE. UTILITIES AND STORM DRAINAGE SYSTEMS ARE SHOWN TO ALERT THE CONTRACTOR TO THEIR PRESENCE AND THE CONTRACTOR IS SOLELY RESPONSIBLE FOR DETERMINING ACTUAL LOCATIONS AND ELEVATIONS OF ALL UTILITIES AND STORM DRAINAGE SYSTEMS INCLUDING SERVICES. PRIOR TO DEMOLITION OR CONSTRUCTION, THE CONTRACTOR SHALL CONTACT "CALL BEFORE YOU DIG" 72 HOURS BEFORE COMMENCEMENT OF WORK AT "(800) 922-4455" AND VERIFY ALL UTILITY AND STORM DRAINAGE SYSTEM LOCATIONS. 13.SHOULD ANY UNCHARTED OR INCORRECTLY CHARTED, EXISTING PIPING OR OTHER UTILITY BE UNCOVERED DURING EXCAVATION, CONSULT THE ENGINEER OF RECORD IMMEDIATELY FOR DIRECTIONS BEFORE PROCEEDING FURTHER WITH WORK IN THIS AREA. 14.ALL DISTURBANCE INCURRED TO TOWN, COUNTY, OR STATE PROPERTY DUE TO CONSTRUCTION SHALL BE RESTORED TO ITS PREVIOUS CONDITION OR BETTER. 15.IF IMPACTED OR CONTAMINATED SOIL IS ENCOUNTERED BY THE CONTRACTOR, THE CONTRACTOR SHALL SUSPEND EXCAVATION WORK OF IMPACTED SOIL AND NOTIFY THE OWNER AND/OR OWNER'S ENVIRONMENTAL CONSULTANT PRIOR TO PROCEEDING WITH FURTHER WORK IN THE IMPACTED SOIL LOCATION UNTIL FURTHER INSTRUCTED BY THE OWNER AND/OR OWNER'S ENVIRONMENTAL CONSULTANT. 16.PROPER CONSTRUCTION PROCEDURES SHALL BE FOLLOWED ON ALL IMPROVEMENTS WITHIN THIS PARCEL SO AS TO PREVENT THE SILTING OF ANY WATERCOURSE OR WETLANDS IN ACCORDANCE WITH THE REGULATIONS OF THE CONNECTICUT DEPARTMENT OF ENERGY & ENVIRONMENTAL PROTECTION GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL. 17.ALL PIPE LENGTHS ARE HORIZONTAL DISTANCES AND ARE APPROXIMATE. 18.GRADING CONTRACTOR SHALL RESTORE TO GRADE AND COMPACTION ALL AREAS DISTURBED BY BUILDING CONSTRUCTION PRIOR TO PAVING OPERATIONS COMMENCING. SCALE: 1" = 300' KEY MAP PERCOLATION TEST PITS TESTING PERFORMED BY SOLLI ENGINEERING AND WITNESSED BY THE UNCAS HEALTH DISTRICT ON JUNE 6, 2023. TIME READING 1:20 12" 1:25 11" 1:30 10 12" 1:35 9 34" 1:40 9 14" 1:45 8 34" 1:50 7 1416" PRESOAK TIME: DEPTH OF PIT: PERCOLATION TEST:103 14" +2 hr TIME READING 1:15 12" 1:20 9 12" 1:25 8" 1:30 6 34" 1:35 5 34" PRESOAK TIME: DEPTH OF PIT: PERCOLATION TEST:101 14" 1.5 hr PERCOLATION RATE (MIN/INCH):1-10 TIME READING 1:25 12" 1:30 10 14" 1:35 8 34" 1:40 7 12" 1:45 6 610" 1:50 5 34" 1:55 5" PRESOAK TIME: DEPTH OF PIT: PERCOLATION TEST:105 12" +2 hr 1:40 4 78" 1:45 4" 1:50 2 34"1:55 7 12" 2:00 7 316" 2:05 6 1416" 2:10 6 916" 2:15 6 516" 2:20 6 216" 2:25 5 1416" 2:30 5 1016" 2:35 5 616" 2:40 5 216" 2:45 4 1416" 2:50 4 1016" 2:55 4 616" 3:00 4 216" 3:05 3 1416" 3:10 3 1016" 3:15 3 616" 3:20 3 216" 3:25 2 1416" 10.1-20 2:00 3 1416"2:05 3 1016"2:10 3 14"2:15 3"2:20 4 12" 1-10 TIME READING 3:05 12" 3:10 9 34" 3:15 8" 3:20 6 1416" 3:25 5 1416" PRESOAK TIME: DEPTH OF PIT: PERCOLATION TEST:107 14" +2 hr 1-10 3:30 5" 3:35 4 716" 3:40 3 34" 3:45 3 14" 3:50 2 1416" TEST PIT OBSERVATIONSTEST PIT OBSERVATIONS TEST PIT 101 0"-6" DARK BROWN, SANDY LOAM W/ TRACE SILT (TOP SOIL) 6"-22"MEDIUM BROWN, SANDY LOAM W/ SOME SILT 22"-108"LIGHT BROWN, LOAMY SAND W/ TRACE SILT NO ROOTS, GROUNDWATER @ 104", NO LEDGE TEST PIT 102 0"-10"DARK BROWN, SANDY LOAM W/ TRACE SILT (TOP SOIL) 10"-30"MEDIUM BROWN, SANDY LOAM W/ SOME SILT 30"-50"TAN, LOAMY SAND W/ TRACE SILT 50"-105"MEDIUM BROWN, LOAM W/ SOME SILT NO ROOTS, NO GROUNDWATER, NO LEDGE, REDOX @ 39" TEST PIT 103 0"-8"DARK BROWN, SANDY LOAM W/ TRACE SILT (TOP SOIL) 8"-17"MEDIUM BROWN, SANDY LOAM W/ TRACE SILT 17"-23"TAN, LOAMY SAND W/ TRACE SILT 23"-80"BROWN, LOAM W/ TRACE SILT NO ROOTS, NO GROUNDWATER, NO LEDGE, NO REDOX TEST PIT 104 0"-16"DARK BROWN, SANDY LOAM W/ TRACE SILT (TOP SOIL) 16"-54"MEDIUM BROWN, LOAM W/ SOME SILT 54"-90"TAN, LOAM W/ SOME SILT NO ROOTS, GROUNDWATER @ 86", NO LEDGE TEST PIT 105 0"-14"DARK BROWN, SANDY LOAM W/ TRACE SILT (TOP SOIL) 14"-35"MEDIUM BROWN, SANDY LOAM W/ SOME SILT 35"-88"TAN, SANDY LOAM W/ TRACE SILT NO ROOTS, GROUNDWATER @ 65", NO LEDGE, REDOX @ 43" TEST PIT 106 0"-9"DARK BROWN, SANDY LOAM (TOP SOIL) 9"-18"MEDIUM BROWN, LOAM W/ TRACE SILT 18"-82"TAN, LOAMY SAND NO ROOTS, NO GROUNDWATER, NO LEDGE, NO REDOX TEST PIT 107 0"-12"DARK BROWN, SANDY LOAM (TOP SOIL) 12"-29"MEDIUM BROWN, SANDY LOAM 29"-36"TAN, LOAMY SAND 36"-83"MEDIUM BROWN, LOAMY SAND NO ROOTS, GROUNDWATER @ 77", NO LEDGE TEST PIT 108 0"-18"DARK BROWN, SANDY LOAM (TOP SOIL) 18"-53"MEDIUM BROWN, LOAM W/ SOME SILT NO ROOTS, GROUNDWATER @ 35", LEDGE @ 53" TEST PIT 109 0"-13"DARK BROWN, SANDY LOAM (TOP SOIL) 13"-34"MEDIUM BROWN, LOAM W/ SOME SILT 34"-75"SANDY LOAM W/ SOME SILT NO ROOTS, GROUNDWATER @ 34", NO LEDGE, REDOX @ 34" TESTING PERFORMED BY SOLLI ENGINEERING AND WITNESSED BY THE UNCAS HEALTH DISTRICT ON JUNE 6, 2023. PERCOLATION RATE (MIN/INCH): PERCOLATION RATE (MIN/INCH): PERCOLATION RATE (MIN/INCH): 1 08/04/23 Revised Per IWC Comments PASSIVE SOLAR ENERGY TECHNIQUES AS PRESCRIBED BY LAW HAVE BEEN CONSIDERED IN DEVELOPEMENT WITH THIS PLAN. ________________________________________ _________________________________________ APPLICANT SIGNATURE DATE ________________________________________ _________________________________________ ENGINEER OF RECORD SIGNATURE DATE 2 08/31/23 Revised Per Planner Comments