Loading...
HomeMy WebLinkAboutEmailBurdick-Chase RE102323EmailRec 23SUB1- 958 Route 163 102423From:Liz Burdick To:Jon Cc:Casey Burch; jmm@mielelaw.com; Dean Fiske; Robert Pryor; Anthony Capuano; Matthew J. Willis; Meredith Badalucca; Stacy Radford Subject:RE: 23SUB1- 958 Route 163 - 1-Lot Resubdivision Date:Tuesday, October 24, 2023 12:38:00 PM 10/24/23 Good morning, Jon, I have reviewed your email sent to me at 10:11 pm on 10/23/23and offer the following comments: 1. The easement documents and your email have been forwarded to Montville Town Attorney Matt Willis for review And comment.2. With respect to the stone walls referenced in your email, the Applicant shall revise the plans accordingly. 3. With regard to your “P.S.” regarding setbacks, the setbacks are shown correctly on the plan set. The boundary that you opine should be a front yard setback, is in fact proposed Lot2’ side yard setback. The setback in question that you state “runs parallel to Route 163” in fact runs parallel to proposed Lot 1’s rear boundary line, which is not a front lot lineseparating a lot from a street in accordance with the Montville Zoning Regulations Section 2 (Definitions) as follows: LOT LINE: A boundary line of a lot. LOT LINE, FRONT: The lot line separating a lot from a street right-of-way (R.O.W.). LOT LINE, REAR: A rear lot line is any lot line, other than another front lot line on anotherstreet, which is the farthest lot line from the street. LOT LINE, SIDE: A side lot line is any lot line not a front lot line, or a rear lot line, bounding a lot and extending from the street toward the rear in a direction approximatelyperpendicular to the street. YARD, REQUIRED: The minimum open space between a lot line and the yard line within which no structure is permitted to be located except as provided in these Regulations. YARD, REQUIRED FRONT: Required unoccupied space between the building line and thefront lot line and measured perpendicular to the building at the closest point to the front lot line. YARD, REQUIRED REAR: Required unoccupied space between the building line and therear lot line and measured perpendicular to the building closest point of the rear lot line. YARD, REQUIRED SIDE: Required unoccupied space between the building line and theside lot line and measured perpendicular from the side lot line to the closest point of the principal building. Please contact me with questions or comments. Thank you. Regards, Liz Burdick Director ~ Dept. of Land Use & DevelopmentTown of Montville310 Norwich-New London Turnpike, Uncasville, CT 06382Telephone: (860) 848-6725 (Direct), (860) 848-6779 (Planning Dept. Main)Email: lburdick@montville-ct.org