Loading...
HomeMy WebLinkAbout23SITE9 125DepotRd MarineMatManTransloadingFacility GatewayTerminal LUDirComments 3 111423 (2)\\planning\planningoffice$\PZC\Applications\2023\23SITE9 125 Depot Rd MarineMatMngmntTransloadFacility 091323\Staff\LUD\23SITE9 125DepotRd MarineMatManTransloadingFacility GatewayTerminal LUDirComments 3 111423.doc Town of Montville DEPARTMENT OF LAND USE & DEVELOPMENT 310 Norwich-New London Turnpike, Uncasville, CT 06382 Telephone: (860) 848-6779 ~ Email: lburdick@montville-ct.org MEMORANDUM FOR THE RECORD November 14, 2023 PZC Regular Meeting Prepared by Liz Burdick, Director on 11/14/23 Property Address: 125 Depot Rd (M/B/L 071-007-000), Uncasville, CT Application: PZ #23SITE9 – Site Plan/Coastal Site Plan Approval. Applicant(s): KKSH2 LLC (on behalf of Marine Materials LLC Property Owner(s): Owner: Uncasville LLC & Gateway Montville LLC (Lessee) - Attorney: Harry B. Heller, Esq., Heller, Heller & McCoy, Agent Engineer: Site Engineer - Alfred Kovalik, P.E., TPRG LLC Traffic Engineer – Scott F. Hesketh, P.E., F.A. Hesketh & Associates Land Surveyor: John U. Faulise, L.S., Boundaries, LLC Lot Size: 11.92-acres (519,235SF) Lot Frontage: 125 Depot Road - 590-feet. Zoning District: Industrial (I), Rte. 32 Overlay Zone (OZ). Public Water/Sewer: Yes. Wetlands/Watercourses: No. Flood Hazard Zone: Yes. The site is located in FEMA Flood Hazard Zone AE11 and “X” per the Flood Insurance Rate Map (FIRM), New London County. Panel 09011C0361J and is tidally influenced. CAM Zone: Yes. Public Water Supply Watershed: No. Proposed Public Improvements: No. Legal: Submitted to Land Use Dept. on 9/13/22. Date of Receipt by PZC: 9/26/23. Decision Required Date: 11/30/23. EXISTING CONDITIONS: Gateway Terminal Phases 1 (Salt Facility) & 3 (3A & 3B – Material/Cargo Stockpiling). Note: Completed Phase 2 work included all site work for Phase 3A & 3B uses. PROPOSAL: “Phase 3C” for “Marine Materials Management & Transloading Facility.” Applicant states, “Importing non-hazardous dredged materials by vessel and amending those materials with a cementitious product to stabilize the same and create a structural material suitable for land-based applications in either by truck or by rail depending upon the determination of final disposition. This application is an enhancement of the Phase 3 application for the Gateway project granted by the Montville Planning & Zoning Commission on November 8, 2022 in that it introduces a portable manufacturing process to the site in order to amend the dredged materials for transport and future use.” STAFF RECOMMENDATION: Table the application to the 12/12/23 regular meeting. The Applicant will have to grant the PZC a minimum 12-day extension of time to make the decision. Outstanding issues with State of CT DEEP LWRD & Solid Waste Divisions shall be addressed prior to any further recommendations.