Loading...
HomeMy WebLinkAbout23SITE9 125DepotRd Phase3C PlanSet Rev101023Date Version Scale Alfred N. Kovalik, PE, LEP, LEED AP License NO.DATE 19765 04 September 2023 Gateway Uncasville Marine Materials Transloading Site 125 Depot Road Uncasville, Connecticut Prepared for KKSH2, LLC (M3) Town of Montville Planning and Zoning Commission Submission 1 Title Page 2 Site Rendering 1/3 Record Drawing As-built (December 2022) 4 Operations Plan 5 Erosions & Sedimentation Control, Spill Prevention and Safety Plan Detail 6 Traffic Plan Detail 7 Lighting and Signage Plan Detail 8 Details Sheet Index KKSHS, LLC 3 Wilderness Drive, North Branford, CT 06471 Attn: Alfred Kovalik (203) 858-4034 Applicant Operator Marine Materials Management, LLC (M3) 47 Oswegatchi Hills Road Niantic, CT 06357 Attn: Alfred Kovalik (203) 858-4034 Uncasville, LLC 1515 Des Peres Rd, St. Louis, MO 63131 Property Owner Gateway Montville, LLC 125 Depot Road, Montville, CT 06382 Attn: Greg Baribault (203) 895-6367 Property Lessee boundaries, LLC Griswold, CT Site Civil/Surveyor F.A. Hesketh and Associates, Inc. East Grandby, CT Traffic Engineer Tipping Point Resources Group, LLC New Haven, CT Sediment Management Consultant October 10, 2023 1.5 N/A Gateway Uncasville Marine Materials Transloading Site SIGNATURE OF CHAIRMAN OR SECRETARY DATE "APPROVED BY THE MONTVILLE PLANNING AND ZONING COMMISSION" 01 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Splash GuardSecondary Spill Containment(Deployed Immediately Prior toProject(s) start)Outfall #4Outfall #3Outfall #2Existing RipRap SwaleExisting HydroworksHydrostorm 108'x20' Cargo Box with55-Gallon EmergencySpill Kit and E/S SuppliesOffice Trailer withFirst Aid SuppliesExisting HydroworksHydrostorm 6Existing Rip Rap Swale8'x20' Cargo Box with SpillContainment SuppliesCementSilosPortland CementBatch PlantFrac TankAbove-GroundStorage TankExisting ConcreteBlocks to RemainExisting CatchBasinMi dd l e Su b A r e a 1 Secondary Spill Containment(Deployed as Needed)Rip Rap Stone(Anti-Tracking)Pipe per RoutingDetails on Sheet 8DateVersionScaleAlfred N. Kovalik, PE, LEP, LEED APLicense NO.DATE1976504 September 2023GRAPHIC SCALEOctober 10, 20231.71"=40'LegendGeneral Notes:Erosions & Sedimentation Control,Spill Prevention and Safety Plan DetailBest Management Practices1) Housekeeping2) Hay bales and silt fence3) Separators4) Collecting Stormwater that goes into binsNo increase in impervious areaNo change in the gradesStormwater and water inside basins to becollected into 20k Gal frac tankWaddlesSubdrainage Basins Onsite perBoundaries 2022 Survey1)Stormwater Management Report, prepared by Boundaries, LLC dated May2022.2)Work to be performed in North Subarea 1, Middle Subarea 1 and CBE Subarea. 3)No increase in impervious areas are proposed. 4)Stormwater runoff from within 24,407 square feet of Storage Bins will becollected and diverted to storage in an onsite 21,000 gallon capacity frac tank.Stormwater will be recycled and used for process water in stabilizationtreatment.5)Outfalls 2, 3 and 4 to be protected with existing HydroStorm units for sedimentcollection. Monitor and maintain according to manufacturerrecommendations. Catch basin inserts for sediment control shall be installedand maintained during active material handling.6)Protect swale and down hill areas as shown using 6-inch diameter hay waddles,or equivalent.7)Deploy 8 inch high secondary containment in transloading areas on dock andramp.8)Deploy Best Management Practices for material handling onsite to minimumspillage. - Inspect and collected spilled sediment minimally daily and more frequentlyduring rain events.- Storage bins will be maintained with a minimum of 1-foot freeboard.9) The E&S controls shall include protection of catch basin inlets, riprap swales,drainage inlet units. Access to the catch basins and hydrodynamic separatorsmust maintained to be free and clear. Contractor to place additional waddles asnecessary along the perimeter of the site.Stormwater Analysis and Narrative05Additional Details on Sheet 08Note: ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~N/FCentral Vermont(Genesee & WyomingRail Road Services)Depot Road Thames River Thames RiverN/FComstockCemetery TSPEmployee &Vistor VehicleParkTruck LoadingTruckUnloadingTri-axle Trucks loadedwith Engineered FillProduct for Off-SiteDateVersionScaleAlfred N. Kovalik, PE, LEP, LEED APLicense NO.DATE1976504 September 2023October 10, 20231.51"=40'LegendDescription:Traffic Plan DetailOnsite Heavy Equipment Triaxle Offloading and Transfer Option(Water-tight trucks to be fitted with noise reducing impact damper on tailgates)Onsite/Offsite Vehicle Transportation RouteMaintain Access To/From Equipment and Supplies0622 Ton Tri-Axle Dump Trucks will transport engineered fill off-site via Depot Rd. Trucks willenter the property via Depot Road and continue east to the designated queueing area.Trucks will then proceed to the South side of the Engineered Fill Storage Area to be loadedby a Material Handler. Loaded trucks will exit the property West-bound via Depot Rd.GRAPHIC SCALE ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~N/FCentral Vermont(Genesee & WyomingRail Road Services)Depot Road Thames River Thames RiverN/FComstockCemetery 1DateVersionScaleAlfred N. Kovalik, PE, LEP, LEED APLicense NO.DATE1976504 September 2023GRAPHIC SCALEOctober 10, 20231.61"=40'Lighting LegendGeneral Notes:Lighting and Signage Plan DetailEmergency Lighting with Backup PowerVertical Mast Lighting Tower (typ, 6kW - Diesel)Vertical Mast Lighting Tower (typ, 6kW - Diesel)07All lights shall be directed downward to work area, minimizing spill and disruption toneighboring properties.Lights shall be used as necessary during permitted working hours only.1Signage Legend N/FCentral Vermont(Genesee & WyomingRail Road Services) Thames River Thames RiverAA'BB'C1'C1D1D1'SECTION A-A'SECTION OF CURING BINSDETAIL ADETAIL BDETAIL CSECTION B-B'SECTION OF MIXING BINSSECTION OF LOADINGMIXING BIN 1SECTION C1-C1'SECTION D1-D1'OFFLOADING SOUTH DOCK AREADateVersionScaleAlfred N. Kovalik, PE, LEP, LEED APLicense NO.DATE1976504 September 2023October 10, 20231.61"=40'General Notes:Plan Details08GRAPHIC SCALEPARTIAL PLAN - SECTIONS