HomeMy WebLinkAbout23SITE7 69 FitchHillRD Zoning Permit APP\\planning\planningoffice$\APPS, Forms, Templates\APPs & Guidelines (Each) rev 11-16-2018\Zoning Permit APP Rev 10-5-2021.doc
Address: ___________________________________________________ Zoning Permit # _____________________
Map: ___________Lot: ___________ Zone: ____________ Expiration date: _____________________
Setbacks: Front/Rear: ____________Sides: ____________
Town of Montville Zoning Permit
Proposed Project: ________________________________________________________________________________
Property Owner: ________________________________________________________________________________
Applicant: _______________________________________________________________________________________
Applicant Address: _______________________________________________________________________________
Phone #________________________________________ Cell # ____________________________________________
Email: __________________________________________________________________________________________
Provide the following:
Copy of plans drawn to scale of at least 1" = 40’ showing: dimensions of lot, size and location of existing, proposed structures,
driveways, sanitary facilities and water supply, parking facilities, and adjacent streets; distances of proposed structures from property
lines and wetlands. (A copy of plan prepared by a Connecticut Registered Land Surveyor may be required).
The Owner/Agent is responsible for and agrees to:
1. Notify the Zoning Officer of any alteration in the plans.
2. An E&S cash bond of $2000 may be required and must be posted prior to approval of Zoning Permit. This bond may be held
for up to one (1) year after Compliance Sign-off.
3. Prior to start of construction all E&S measures must be inspected by the Zoning Officer.
4. Contact the Zoning Officer (860-848-6779) upon completion of project.
I hereby certify that the information provided is true and correct and further attest the proposed project is authorized by the
owner in fee and I am authorized to make application for a permit for such described work. The undersigned hereby
authorizes the Montville Planning & Zoning Commission or its agents to enter the subject property for the purposes of
inspection and/or enforcement.
Owner/Agent Signature: __________________________________________Date:____________________________
Applicant Signature: _____________________________________________Date:___________________________
OFFICE USE ONLY Fee: _______________ Cash / Check # _________________
______________ ___________________________________ _______________
Commission Agent Date Certificate of Zoning Compliance (CZC) Date
□ As Built required prior to issuance of CZC. Received on:_______________________________________________
□ Bond # & Date ______________________________________Released:____________________________________
Site/Special Permit #________________________________________________________________________________
Wetlands Permit #__________________________________________________________________________________
Conditions & Notes_________________________________________________________________________________
__________________________________________________________________________________________________
__________________________________________________________________________________________________
__________________________________________________________________________________________________
__________________________________________________________________________________________________
69 Fitch Hill Road
062-036-000 LI
Per 23SITE7
Phase IA of 23SITE7 - Multiple warehouse/office spaces and associated site improvements (Phased)
Andrew Petrowski
Same
Included w/23SITE7
As-Built is required at completion of Phase 1A and final As-Built upon completion of all phases.
$88,495.00
23SITE7, Approved 8/22/23
23IWC7, Approved 6/15/23
All conditions of PZ# 23SITE7 shown on attached Certificate of Notice of Decision shall be met. All outstanding invoices shall be paid prior to issuance of CZC. E&S
controls shall be installed & inspected by ZEO prior to the start of work and maintained in good working order. Installation of all drainage structures in accordance with the approved plan shall be certified by
applicant's P.E. prior to issuance of a CZC. Applicant shall meet all of the requirements of the State of CT DEEP, NPU, Montville Building Dept., Office of the Fire Marshal &
Public Works Dept and the Uncas Health District.