Loading...
HomeMy WebLinkAbout23SITE2 412MapleAve DecLtrCertApp 0425231 H:\PZC\Applications\2023\23SITE2 412 Maple Ave - Ind Site Development\LEGAL\23SITE2 412MapleAve DecLtrCertApp 042523.docx Town of Montville DEPARTMENT OF LAND USE & DEVELOPMENT 310 Norwich New London Turnpike, Uncasville, CT. 06382 Telephone: (860) 848-6779 Email: lburdick@montville-ct.org VIA CERTIFIED MAIL & EMAIL: bill@pandhconstruction.com April 26, 2023 William Pieniadz Advanced Associates, LLC P.O. Box 164 Uncasville, CT 06320 RE: 23 SITE 2 – 410-412 Maple Avenue, Uncasville, CT – Applicant/Owner: Advanced Associates for industrial building and associated site improvements. Dear Mr. Pieniadz: The Montville Planning and Zoning Commission, at its regular meeting on April 25, 2023, APPROVED WITH CONDITIONS your above-referenced application (#23SITE2) for site plan approval for a new Industrial Building and Associated Site Improvements at Rockland Overlook Industrial Condominium. Enclosed is the Certificate of Notice of Decision. Please contact me with any questions. Thank you Sincerely, Liz Burdick, Director Department of Land Use & Development C. Harry Heller, Esq., Heller, Heller & McCoy Richard Deschamps, Advanced Surveys, LLC Seamus Moran, H & H Engineering Associates Meredith Badalucca, Zoning Officer Dave Jensen, Building Official Paul Barnes, Fire Marshal Lucy Beit, Assessor John Carlson, Public Works Director Mike Kirby, Uncas Health District Ronald K. McDaniel, Mayor Certified Mail # 7012 3460 0002 3844 4440 Sent 6/2/2023 2 H:\PZC\Applications\2023\23SITE2 412 Maple Ave - Ind Site Development\LEGAL\23SITE2 412MapleAve DecLtrCertApp 042523.docx TOWN OF MONTVILLE PLANNING & ZONING COMMISSION CERTIFICATE OF NOTICE OF DECISION APPLICATION: PZ #23 SITE 2 LOCATION: 410-412 Maple Avenue (Parcel IDs 031/002/00A & 0A0), Oakdale CT APPLICANT/OWNER: Advanced Associates, LLC REPRESENTATIVE(S): Harry Heller, Esq., Heller, Heller & McCoy PROJECT: New Light Industrial Building and associated site improvements at Rockland Overlook Industrial Condominiums. DATE OF APPROVAL: April 25, 2023 EXPIRATION DATE: April 25, 2028 COMMISSION ACTION: APPROVE WITH CONDITIONS as follows: APPROVE Application #23 SITE 2- 410-412 Maple Avenue (Parcel IDs 031/002/00A & 031/002/0A), Uncasville, CT, Applicant/Owner: Advanced Associates, LLC, for site plan approval for an industrial building & associated site improvements within an existing industrial park in that the application, supporting documents and a plan entitled “Stormwater Management Plan, New Industrial Development, 412 Maple Avenue, Uncasville-Montville, CT 06382, Prepared for Advanced Associates, LLC, Prepared by HH Engineering Associates, Dated 11/1/22, Revised to 4/20/22” comply with all applicable sections of the Montville Zoning Regulations, with the following conditions: 1. Applicant shall meet all of the requirements of the Montville Building Department, Office of the Fire Marshal, Uncas Health District for required permitting and inspections. 2. All drainage structures proposed for the project shall be constructed and maintained post construction in accordance with the approved Plan Set. 4. Prior to issuance of a zoning permit to start work, a soil erosion & sediment control bond shall be posted in the amount of $5,000 in a form acceptable to the Finance Director 5. Final revised plan sets, along with a digital copy of the final plan, shall be submitted to the Land Use Dept. & shall be signed and sealed with original (wet) signatures by P.E. & L.S 6. An approved Zoning Permit is required prior to the start of any work. 7. The ZEO must be contacted and a pre-construction meeting shall be held at least 24- hours prior to start of any work. Soil Erosion and Sediment Controls shall be installed in accordance with the approved plan set and inspected by the ZEO prior to the start of any work. 8. After work has commenced, any substantive changes to the approved site plan require review and approval by the Land Use Director and/or the Planning & Zoning Commission. Each and every condition is an integral part of the Commission decision. Should any of the conditions, on appeal from this decision, be found to be void or of no legal effect then this conditional approval is likewise void. Should any of the conditions not be implemented by the applicant or his successors within the specified permit time period, then this conditional approval is void. Elizabeth Burdick, Director Department of Land Use & Development