April 26, 2023
William Pieniadz
Advanced Associates, LLC
P.O. Box 164
Uncasville, CT 06320
RE: 23 SITE 2 – 410-412 Maple Avenue, Uncasville, CT – Applicant/Owner: Advanced
Associates for industrial building and associated site improvements.
Dear Mr. Pieniadz: The Montville Planning and Zoning Commission, at its regular meeting on April 25, 2023,
APPROVED WITH CONDITIONS your above-referenced application (#23SITE2) for site plan
approval for a new Industrial Building and Associated Site Improvements at Rockland Overlook
Industrial Condominium. Enclosed is the Certificate of Notice of Decision.
Please contact me with any questions. Thank you
Sincerely,
Liz Burdick, Director
Department of Land Use & Development
C. Harry Heller, Esq., Heller, Heller & McCoy
Richard Deschamps, Advanced Surveys, LLC
Seamus Moran, H & H Engineering Associates
Meredith Badalucca, Zoning Officer
Dave Jensen, Building Official
Paul Barnes, Fire Marshal
Lucy Beit, Assessor
John Carlson, Public Works Director
Mike Kirby, Uncas Health District
Ronald K. McDaniel, Mayor
Certified Mail # 7012 3460 0002 3844 4440
Sent 6/2/2023
2
H:\PZC\Applications\2023\23SITE2 412 Maple Ave - Ind Site Development\LEGAL\23SITE2 412MapleAve DecLtrCertApp 042523.docx
TOWN OF MONTVILLE PLANNING & ZONING COMMISSION CERTIFICATE OF NOTICE OF DECISION
APPLICATION: PZ #23 SITE 2 LOCATION: 410-412 Maple Avenue (Parcel IDs 031/002/00A & 0A0), Oakdale CT APPLICANT/OWNER: Advanced Associates, LLC REPRESENTATIVE(S): Harry Heller, Esq., Heller, Heller & McCoy PROJECT: New Light Industrial Building and associated site improvements at Rockland Overlook Industrial Condominiums. DATE OF APPROVAL: April 25, 2023 EXPIRATION DATE: April 25, 2028 COMMISSION ACTION: APPROVE WITH CONDITIONS as follows: APPROVE
Application #23 SITE 2- 410-412 Maple Avenue (Parcel IDs 031/002/00A & 031/002/0A), Uncasville,
CT, Applicant/Owner: Advanced Associates, LLC, for site plan approval for an industrial building
& associated site improvements within an existing industrial park in that the application, supporting
documents and a plan entitled “Stormwater Management Plan, New Industrial Development, 412
Maple Avenue, Uncasville-Montville, CT 06382, Prepared for Advanced Associates, LLC, Prepared
by HH Engineering Associates, Dated 11/1/22, Revised to 4/20/22” comply with all applicable
sections of the Montville Zoning Regulations, with the following conditions:
1. Applicant shall meet all of the requirements of the Montville Building Department, Office of the Fire Marshal, Uncas Health District for required permitting and inspections. 2. All drainage structures proposed for the project shall be constructed and maintained post construction in accordance with the approved Plan Set. 4. Prior to issuance of a zoning permit to start work, a soil erosion & sediment control bond shall be posted in the amount of $5,000 in a form acceptable to the Finance Director 5. Final revised plan sets, along with a digital copy of the final plan, shall be submitted to the Land Use Dept. & shall be signed and sealed with original (wet) signatures by P.E. & L.S 6. An approved Zoning Permit is required prior to the start of any work. 7. The ZEO must be contacted and a pre-construction meeting shall be held at least 24- hours prior to start of any work. Soil Erosion and Sediment Controls shall be installed in accordance with the approved plan set and inspected by the ZEO prior to the start of any work. 8. After work has commenced, any substantive changes to the approved site plan require review and approval by the Land Use Director and/or the Planning & Zoning Commission.
Each and every condition is an integral part of the Commission decision. Should any of the conditions, on appeal from this decision, be found to be void or of no legal effect then this conditional approval is likewise void. Should any of the conditions not be implemented by the applicant or his successors within the specified permit time period, then this conditional approval is void.
Elizabeth Burdick, Director