Loading...
HomeMy WebLinkAbout23IWC9 - 669 Route 163- Rev. C101 Rec'd 7-18-23ZONE:GOVZONE:OSZON E: R 4 0 ZON E: G O V ZON E : G O V ZON E : R 2 0 - M ZONE :GOV ZONE :R 1 2 0 CHES T E R F I E L D R O A D ROU T E 1 6 3 FEMA Z O N E X FEMA Z O N E A FEMA ZONE XFEMA ZONE X(SHADED)TP-1 TP-2 CONSTRUCTION ENTRANCEXXXX X X X X X X X X X X X X X X X X XX X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXOHEOHESB SB SB SB SB SB SB SB SB SB SB SB SB SB SB SB SB SB SB SB S B SB S B S B SBS B SBSBSBSB SB SB SB SB SB SB SB SBSBSBSBSBSBSBSBSB SB SB SB SB SB SB SB SB SB SB SB SB SB SB S BSBSBSBSBSB SBSBSBSB SB SB SB SB SB SB SB SB E C E C ECECECECECECECECECPROPOSED EQUIPMENT PAD PROPOSED GATE CONCRETE WASHOUT BASIN LOW LOW LOW LOW LOW LOW LO W LO W LO W LO W LO W LO W LO W LO W LO W L O W L O W L O W L O W L O W LO W LOWLOWLOW LOWLOWLOWLOWLOWLOWLOW LOW LOW LO W L OW LOW LO W LOW LOWLOWLOWLOW LOWLO W LO W L O W L O WLOWLOWLOWLOWLOWLOWLOWLOWLOW LOW LOW LOW LOWLOWLOW LOW LOW LOW LOW LOW LOW LOW LO W LO W LO WLOWLOWLOWLOWLOW LOW LOW LOW LOW LOW LOW LO W LO W LO W LO W LO W LO W LO W LO W LO W LO W LO W LO W LO W LOW LOWLOW LOW LOW LOW LOW LOW LOW LOW LOWLOWLOWLOWLOW LOW L OW L O W LO W LOW LOW LO WLOW LOW LOW LOW LOWLOWLOWLOWLOWLOWLOWLOW LOW LOW SBSBS B SBSB S B S B S B S B SB SBSBSBSBSBSBPROPOSED PAVEMENT RESTORATION 3 C-502 1 C-501 1 C-502 5 C-502 5 C-501 6 C-502 EXISTING LEGEND: LOCUS PROPERTY LINE ABUTTERS PROPERTY LINE EASEMENT LINE 2' CONTOUR LINE CHAIN LINK FENCE TREE LINE FEMA FLOOD ZONE LINE ZONING LINE OVERHEAD WIRES BURIED GAS LINE CONC. BOUND FOUND CALCULATED POINT UTILITY POLE LIGHT POLE GUY WIRE ANCHOR CATCH BASIN MANHOLE WETLAND FLAG WITH IDENTIFIER SIGN POST BURIED DRAINAGE LINE GAS VALVE CONCRETE PAD GRAVEL PAVEMENT STRUCTURE WETLAND LINE 50' WETLANDS BUFFER TREE LINE SAND AND GRAVEL TP-2 TEST PIT PROPOSED LEGEND: LIMIT OF WORK AND LEASE AREA SEDIMENT BARRIER LOW LOW SB SB SB SB FENCEXXX ELECTRIC CONDUITECEC OVERHEAD ELECTRICOHEOHE SOLAR PV RACK UTILITY POLE 5 C-502 3 C-501 2 C-502 ACCESS ROAD 4 C-502 P:\Private\Verogy Solar\Montville, CT Landfill\Design\CAD\03 Sheets\03 Montville C101.dwgWESTON & SAMPSON ENGINEERS, INC. 712 BROOK STREET, SUITE 103 ROCKY HILL, CT 06067 860.513.1473 800.SAMPSON COPYRIGHT © 2023 WESTON & SAMPSON, INC. Project: www.westonandsampson.com Applicant: Seal: Revisions: Issued For: Drawing Title: Sheet Number: Scale: W&S File No.: W&S Project No.: Approved By: Date Created: Reviewed By: Drawn By: TOWN OF MONTVILLE LANDFILL SOLAR PV DEVELOPMENT 669 ROUTE 163 MONTVILLE, CT 06353 0 VCP MONTVILLE LF, LLC 124 LASALLE ROAD 2ND FLOOR WEST HARTFORD, CT 06107 TEL: (860) 288-7215 WWW.VEROGY.COM PERMITTING Verogy Montville ENG23-0165 AS SHOWN RJB 06/06/2023 MRC DED 06/06/2023 ISSUED FOR PERMITTING No.Date Description NOT FOR CONSTRUCTION 1 06/21/2023 ISSUED FOR DEEP PERMITTING 2 06/27/2023 REVISED PER TOWN COMMENTS NOTES: 1.ELECTRICAL DESIGN, INCLUDING UTILITY POLES, PERFORMED BY OTHERS. ELECTRICAL EQUIPMENT AND COMPONENTS SHOWN TO ILLUSTRATE LOCATIONS ONLY. REFER TO ELECTRICAL DRAWINGS FOR DETAILED ELECTRICAL SYSTEM INFORMATION. 2.FOUNDATION LOCATIONS AND ARRAY ORIENTATION SUBJECT TO CHANGE BASED ON FINAL DESIGN BUT WILL BE WITHIN THE PROPOSED LIMIT OF WORK. 3.SAND/GRAVEL STOCKPILES AND WOODED AREAS ON CAP TO BE REMOVED BY OTHERS PRIOR TO SOLAR ARRAY CONSTRUCTION. 4. CONSTRUCTION WORK AND WORK HOURS WILL BE COORDINATED WITH THE TOWN OF MONTVILLE DEPARTMENT OF PUBLIC WORKS DIRECTOR PRIOR TO CONSTRUCTION TO ENSURE THERE WILL BE NO IMPACTS TO THE TRANSFER STATION OPERATIONS. C101 PROPOSED SITE PLAN SOIL SCIENTIST DATE