Loading...
HomeMy WebLinkAboutSite Plans Rev 3-2021ROAD D U B O I S AVENUER O S E LU ND H I L L R O A D MIL E F S K I D R . H A MM E L LA N E PEQUOTMAPLEROADAVE. G A Y RD.WILLOWM C S H A N E RA N C H R D .DRIVEMOXLEYOLD STREET395VIRGINIACOURTBON V I L L E D R .MAPLEJEROMEROADJEROMESTARRKILLEEN RD. HALEY HIDDEN ACRES ROADSWANTYJOHNSONGREYSTONEDRIVEMARCIAMONTVILLEWATERFORD 163R A IN B OWHI L LCR ES T D R I V E SALTBOX LANE IN D IAN H I L L DR I V E WYNDWOODROADLOOKING GLASSCIRCLEOLD MOXLEYHILL RD.DRIVEAVE.ROADROADUNG E R RO AD FIREProjectSiteCOLCHESTER ROAD H I LL RO A D D R IV E 395163Town L ine Index To DrawingsSite Location MapScale: 1" = 1000'©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Site Development Plan Millwood at Old Colchester Road Prepared ForSUN COMMUNITIES, INC. 416 Old Colchester Road, Uncasville, ConnecticutNovember 2016Additions & Revisions:9 May 2017, 9 June 2017, 20 June 2017, 20 July 2017, 15 September 2017, 23 March 2021Sheet TitleCover SheetNotes, Legend, and Test Pit ObservationsBoundary and Topographic SurveyZoning Compliance PlanDevelopment PlanDevelopment Plan & Typical Landscape PlanRoadway and Stormwater Plan & Profile - Millwood DriveRoadway and Stormwater Plan & Profile - Highland CircleStormwater Outlet and Treatment Basins South of Millwood DriveUtility Design Plan & Profile - Millwood DriveUtility Design Plan & Profile - Highland CircleStormwater, Sanitary Sewer and Site Improvements - Old Colchester RoadStormwater Basin Landscape PlanErosion & Sediment Control PlanErosion & Sediment Control and Stormwater Pollution Prevention NarrativeErosion & Sediment Control Plan DetailsGeneral Site DetailsStormwater DetailsStormwater, Electric, Telecom, and Site Lighting DetailsStormwater Basin DetailsWater and Sanitary Sewer DetailsSheet1234567-891011-121314151617181920212223-24Address: 416 Old Colchester RoadMontville Assessor's ID: 16-003-000Area: 26.75± Ac.Owners: Sun Communities, Inc.246 Redstone StreetPO Box 608Southington, CT 06489Telephone: (860) 793-0281Applicants:Sun Communities, Inc.246 Redstone StreetPO Box 608Southington, CT 06489Property Info:Note: Plan Set Signatures For Sheets 1-24 2Notes, Legend and Test Pit ObservationsAs NotedRevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner ChangeTEST PIT OBSERVATIONSLEGEND & ABBREVIATIONSCONSTRUCTION NOTES:GENERAL NOTES:WATER CONSTRUCTION NOTES:SANITARY SEWER CONSTRUCTION NOTES:~ Old Colchester RoadN/FJohn R. McQuown &Lisa A. McQuown438 Old Colchecter RoadVolume 161 Page 835N/FKenneth R. Wilcox &Marcia L. Wilcox442 Old Colchester RoadVolume 288 Page 614N/FKyle Andrews & Christy Andrews448 Old Colchester RoadVolume 553 Page 208N/FS & S Farms LLC386 Old Colchester RoadVolume 606 Page 839Subject ParcelArea = 1,165,230± S.F. 26.75± AcresN/FS & S Farms LLC386 Old Colchester RoadVolume 606 Page 8393Boundary and Topographic SurveyREFERENCE MAPS:GRAPHIC SCALE1" = 80'LEGEND & ABBREVIATIONSRevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner ChangeSURVEY NOTES:NWSENOTE:NOTE: Old Colchester RoadN/FJohn R. McQuown &Lisa A. McQuown438 Old Colchecter RoadVolume 161 Page 835ColchesterOldRoad4361113121422232021151618193031324345384046444239415789362635253437242833272917211104Zoning Compliance PlanGRAPHIC SCALE1" = 40'RevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner Change 4361112222320211819313243384044423941578936263525342428332717211Development PlanRevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner Change5Match Line (S e e S h e e t 6 )1" = 30'GRAPHIC SCALE 1113121415163043454644423626352534372428332729Development Plan & Typical Landscape PlanRevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner Change6Ma t ch L i n e (S e e S h e e t 5 )1" = 30'GRAPHIC SCALEDevelopment PlanTypical Landscape PlanLANDSCAPE SCHEDULE RainbowDrive~1711~~MillwoodDriveΔΔProfile - Proposed Millwood DriveRevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner ChangeGRAPHIC SCALE1" = 40'Roadway and Stormwater Plan & Profile - Millwood Drive7RainbowDrive OldColchesterRoad MATCH L INE - A T S TA T ION - 7 +50 S E E SH EE T # 8 FOR CONTINUATIONSEE SHEET #10HighlandCircleFOR CONTINUATIONSEE SHEET #9 Profile - Proposed Millwood DriveN/FKyle Andrews & Christy Andrews448 Old Colchester RoadVolume 553 Page 20810MillwoodDriveRevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner ChangeRoadway and Stormwater Plan & Profile - Millwood Drive1" = 40'8GRAPHIC SCALEFOR CONTINUATIONSEE SHEET #10Highland Circle FOR CONTINUATION SEE SHEET #9 MATCH LINE - AT STATION - 7+50SEE SHEET #7 Highland CircleMillwood ΔΔΔRevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner ChangeRoadway and Stormwater Plan & Profile - Highland Circle1" = 40'9GRAPHIC SCALEMillwood DriveFOR CONTINUATIONSEE SHEET #8Millwood DriveFOR CONTINUATIONSEE SHEET #7 Millwood DriveFOR CONTINUATIONSEE SHEET #8Millwood DriveFOR CONTINUATIONSEE SHEET #7 N/FKyle Andrews & Christy Andrews448 Old Colchester RoadVolume 553 Page 20810MillwoodDriveRevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner ChangeStormwater Outlet and Treatment Basins South of Millwood Drive1" = 40'10GRAPHIC SCALEFOR CONTINUATIONSEE SHEET #7STORMWATER SYSTEM OPERATION AND MAINTENANCE Old Colchester RoadRainbowDrive ~~~1711Profile - Proposed Millwood DriveRevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner Change1" = 40'Utility Design Plan & Profile - Millwood Drive11GRAPHIC SCALEMATCH L IN E - AT S TAT ION - 7 + 50 SE E SH E ET #12TEST PIT RESULTS Kyle Andrews & Christy Andrews448 Old Colchester RoadVolume 553 Page 20810Profile - Proposed Millwood DriveRevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner ChangeUtility Design Plan & Profile - Millwood Drive1" = 40'12GRAPHIC SCALEMATCH LINE - AT STATION - 7+50SEE SHEET #11FOR CONTINUATIONSEE SHEET #13TEST PIT RESULTS Utilitiy Design Plan & Profile - Highland Circle1" = 40'13GRAPHIC SCALEFOR CONTINUATIONSEE SHEET #12FOR CONTINUATIONSEE SHEET #12RevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner ChangeFOR CONTINUATIONSEE SHEET #11 FOR CONTINUATIONSEE SHEET #11TEST PIT RESULTS ~~~Old Colchester RoadRainbow Drive Hillcrest Drive 14Stormwater, Sanitary Sewer and Site Improvements Old Colchester RoadGRAPHIC SCALE1" = 40'RevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner Change GRAPHIC SCALERevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner ChangeLOAM & SEED CROSS-SECTION DETAILSHRUB PLANTING DETAILTREE PLANTING DETAILPLANTING SPECIFICATIONS:NEW ENGLAND WETMIX (WETLAND SEED MIX):NEW ENGLAND EROSION CONTROL/RESTORATION MIX FORDETENTION BASINS AND MOIST SITES:LANDSCAPE SCHEDULE-STORMWATER BASINSBALLED AND BURLAPPED MATERIALCONTAINER GROWN MATERIALSTAKING DETAILGUYING DETAILGROUND COVER PLANTING DETAILStormwater Basins 2&315Stormwater Basin Landscape Plan1" = 30' ~~GRAPHIC SCALERevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner Change16Erosion & Sediment Control Plan1" = 50' 17Erosion & Sediment Control and Stormwater Pollution Prevention Plan NarrativeAs NotedReference Is Made To:Soils Types and Slopes:Nature and Sequence of Construction Activity:Construction Site Estimates:Development Schedule:Erosion and Sedimentation Control Plan:””Erosion and Sediment Control Best Management Practices (BMP'S):Minimize Disturbed Area and Protect Natural Features and Soil:Establish Perimeter Controls and Sediment Barriers:.Establish Stabilized Construction Entrance/Exit:Retain Sediment On-site and Control Dewatering Practices:”Storm Drain Protection:Soil Stabilization:Slope Protection:Final Stabilization:Spill Prevention and Control Plan:Spill Prevention and Control Best Management Practices (BMP'S):RevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner Change 18Erosion & Sediment Control Plan DetailsAs NotedRevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner ChangeSEDIMENT FENCE DETAILHAY BALE BARRIER DETAILINLET SEDIMENT CONTROL DEVICEOPTION #1JUTE NETTING TEMPORARY SLOPEAND SWALE STABILIZATIONINLET SEDIMENT CONTROL DEVICEOPTIONS #2 & #3WATER BAR DETAILSEDIMENT FENCE BACKED BYHAY BALE BARRIER DETAILWOOD CHIP FILTER BARRIERPERMANENT SLOPEAND SWALE STABILIZATIONANTI-TRACKING PADTYPICAL PUMP SETTLING BASINNOT TO SCALETYPICAL PUMP INTAKE DETAILSECTION B-BSECTION A-APLANGEOTEXTILE DEWATERING BAGNOT TO SCALEPROFILE VIEWPLAN VIEWSTONE CHECK DAM SECTIONSEDIMENT TRAP SPILLWAY DETAILNOT TO SCALE 19General Site DetailsAs NotedRevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner ChangeSTOP BAR DETAILTRAFFIC SIGNAGE DETAILSTOPROADWAY CROSS SECTIONPAVED DRIVEWAY DETAILTYPICAL SIGN SUPPORTPER CTDOT STANDARDSBITUMINOUS CONCRETE LIP CURB DETAILNOT TO SCALETYPICAL CROSS SECTIONFOR PERMANENT TRENCH PAVEMENTTYPICAL CROSS SECTIONFOR TEMPORARY TRENCH PAVEMENTPOST AND RAIL FENCE DETAILNOT TO SCALESPEEDLIMIT15ALUMINUM FENCE DETAILNOT TO SCALEFENCE POST AND SLEEVE DETAILNOT TO SCALESEGMENTAL RETAININGWALL DETAILSTONE SLOPESTABILIZATION DETAILTEMPORARY EROSION CONTROL BLANKET DETAIL 20Stormwater DetailsAs NotedRevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner ChangeTYPE 'C' CATCH BASIN TOP DETAILPRECAST CONCRETE STORM DRAIN MANHOLE DETAILNOT TO SCALETYPE "C", "C-L" OR "C-G" CATCH BASINNOT TO SCALETRENCH DETAIL (STORM DRAINAGE)NOT TO SCALETABLE ATYPE "C" CATCH BASIN TOP IN A LINEOF 6" BITUMINOUS CURBING DETAILNOT TO SCALEFRONT VIEWSIDE VIEWSNOUT OIL-WATER DEBRIS SEPERATORDETAIL ADETAIL BCATCH BASIN HOODED OUTLETNOT TO SCALEDOUBLE CATCH BASIN TYPE II DETAILCURTAIN DRAIN DETAILNOT TO SCALETYPICAL GRASS SWALE SECTIONNOT TO SCALELEVEL SPREADER DETAILNOT TO SCALE 21Stormwater, Electric, Telecom and Site Lighting DetailsAs NotedRevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner ChangeTRASH RACK DETAILSNOT TO SCALESITE LIGHTINGCONDUIT TRENCH DETAILLIGHT POLE FOUNDATION DETAILLOGO HANDHOLE DETAILLIGHT POLE DETAILELECTRIC , TELE. & TELECOMCONDUIT TRENCH DETAILSTORMWATER BASIN EMBANKMENT DETAILNOT TO SCALETYPE 1 RIP RAP SCOUR HOLE DETAILNOT TO SCALEANTI-SEEP COLLAR DETAILNOT TO SCALERIP RAP SPILLWAY DETAILNOT TO SCALESTORMWATER BASINUNDERDRAIN DETAILNOT TO SCALEWATER QUALITY BASINUNDERDRAIN DETAILNOT TO SCALE 22Stormwater Basin DetailsAs NotedRevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner ChangeOUTLET CONTROL STRUCTURE #2 DETAILNOT TO SCALEOUTLET CONTROL STRUCTURE #3 DETAILNOT TO SCALESTORMWATER BASIN #3 DETAILNOT TO SCALESTORMWATER BASIN #2 DETAILNOT TO SCALE 23Water and Sanitary Sewer DetailsAs NotedGATE VALVE ANDGATE BOX DETAILWATER MAIN THRUST BLOCK DETAILWATER MAIN TRENCH DETAILRevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner ChangeREQUIRED LENGTH OF RESTRAINEDJOINTS FROM FITTINGS (FEET)CLEAN-OUT DETAILWATER SERVICE DETAILWATER MAIN BLOW-OFF ASSEMBLY DETAIL2" AIR RELEASE VALVE DETAILNOT TO SCALE 24Water and Sanitary Sewer DetailsAs NotedRevisionsSHEET NO.24November 2016JOB I.D. NO.14-2320-2DATE:SCALE:©2016 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.Millwood at Old Colchester Road Site Development Plan Prepared For Sun Communities, Inc. 416 Old Colchester Road, Uncasville, ConnecticutRev: May 9, 2017, Add Wetlands, ReviseGrading Lots 1, 2, 5, 39 & 40 and Add CutoffTrenchRev: June 9, 2017, Per Town Staff/TownEngineer CommentsRev: June 20, 2017, Per Town Staff/TownEngineer CommentsRev: July 20, 2017, Per Planning and ZoningConditions of ApprovalRev: September 15, 2017, Add AdditionalTemporary Diversion Swale To E&S PlanRev: March 23, 2021, Revise Grading for PadSites, Property Owner ChangeWATER AND SEWER CROSSING DETAILNOT TO SCALE