HomeMy WebLinkAboutSubdivision PlanO)VNER
234 SIMPSON LANE
OAKDALE, CT 06370
APPLICANT
JWR ASSOCIATES
P.O. BOX 164
UNCASVILLE, CT 06382
PROPERTY INFO:
ADDRESS: 234 SIMPSON LANE
MQNTVILLE ASSESORS MAP 38 -LOT 49
AREA: 2916 ACRES
OWNER: JEANNETTE C. PIE1vIADZ
DEED REFERENCE: VOLUME 623 -PAGE 1068
ADVANCED SURVEYS, LLC.
25 Apple Lane, Colchester CT. 06415
Phone &Fax (860) 267-5979
N
W #
E
S
SUB*DIVISION PLAN
PREPARED FOR JWR ASSOCIATES
234 SIMPSON LANE
MONTVILLE.., CT
NOVEMBER 1 •
KEY MAP_
SCALE: 1" = 1000'
SHEET NO. DESCRIPTION
1 COVER SHEET
2 BOUNDARY - LOT LAYOUT & TOPOGRAPHY
3 CONCEPTUAL DEVELOPMENT PLAN - LOTS 1,2 & 3
4 CONCEPTUAL DEVELOPMENT PLAN - LOTS 4,5,6,& 7
5
6
7
TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT
AS NOTED HEREON. THIS MAP IS NOT VALID WITHOUT A LIVE SIGNATURE
AND THE EMBOSSED SEAL OF THE SURVEYOR HEREON.
CONCEPTUAL DEVELOPMENT PLAN - LOT 8
NOTES - DETAILS - E & S CONTROLS
SOILS DATA & SANITARY INFORMATION
APPROVED BY THE TOWN OF MONTVILLE PLANNING & ZONING COMMISSION
CHAIRMAN OR SECRETARY DATE
APPROVED BY THE TOWN OF MONTVILLE INLAND WETLANDS
& WATERCOURSE COMMISSION
CHAIRMAN OR SECRETARY DATE
APPROVED BY THE UNCAS HEALTH DISTRICT
SIGNATURE DATE
DATE OF COMPLETION OF ALL WORK
SIGNATURE DATE
PASSIVE SOLAR ENERGY TECHNIQUES AS PRESCRIBED BY LAW HAVE BEEN
CONSIDERED IN DEVELOPMENT OF THIS PLAN
SIGNATURE DATE
GRID NORTH
N/F
ROBERT A. TRINGE &
JUDITH M. TRINGE
VOL. 332 PG. 715
(MAP 46 - LOT 50B)
* - INDICATES A REAR LOT
** - INDICATES REAR LOT STRIP (25' MINIMUM)
*** - INDICATES REAR LOT FRONT YARD (60' REQUIRED)
P
! r
CECELIA C. MESSORE
VOL. 269 PG.327
(MAP 38 - LOT 41) ; �r`\ A �`, ,� �iJ I N/F
ESTATE OF
r' ;---" E N w WALTER J. PIENIADZ
i r N� 1 .� 221,g � , IN �
V�.EC.; , ` �- ' C. VOL. 332 PG. 711
N/F
(MAP 46 - LOT 51) ES OF
TATE
NOTES:
1. THIS SURVEY HAS BEEN PREPARED PURSUANT TO THE REGULATIONS OF CONNECTICUT
STATE AGENCIES SECTIONS 20-300b-1 THROUGH 2O -300b-20 AND THE "STANDARDS
FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ADOPTED BY THE
CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. ON SEPTEMBER 26, 1996. IT
IS A PROPERTY SURVEY BASED ON A RESURVEY AND CONFORMS TO HORIZONTAL
ACCURACY CLASS A-2.
2. FOR SUBJECT PROPERTIES REFERENCE IS MADE TO THE TOWN OF MONTVILLE LAND
RECORDS VOLUME 623 - PAGE 1068.
3. THE PROPERTY IS SHOWN ON ASSESSORS MAP 38 - LOT 49.
4. THE PROPERTY IS LOCATED IN ZONING DISTRICT R-40.
5. TOTAL AREA OF SUBDIVISION - (29.16) ACRES.
6. TOPOGRAPHIC INFORMATION SHOWN COMPLIES WITH T-2 & T-3 MAPPING STANDARDS.
BASE FOR LEVELS: N.A.V.D. 1988.
7. UNDERGROUND UTILITIES SHOULD BE MARKED OUT PRIOR TO ANY LOT CONSTRUCTION.
CALL BEFORE YOU DIG: 811.
8. THE INLAND WETLANDS HAVE BEEN DELINEATED BY MARK H. SULLIVAN, C.P.S.S.
9. THE PROPOSED DEVELOPMENT ALLOWS FOR THE CREATION OF 8 NEW LOTS.
A HOUSE, SEPTIC SYSTEM AND ON SITE WELL ARE PROPOSED ON EACH NEW LOT.
10. THE PROPERTY IS LOCATED WITHIN FLOOD ZONE "X" AS SHOWN ON
"FIRM MAP NEW LONDON COUNTY, CONNECTICUT, ALL JURISDICTIONS,
MAP NUMBER 09011C0332G, EFFECTIVE DATE: JULY 18, 2011.
11. THE ZONING ENFORCEMENT OFFICER MUST BE CONTACTED A MINIMUM OF 24 HOURS
PRIOR TO THE COMMENCEMENT OF CONSTRUCTION ON ALL LOTS.
12. THE SHARED DRIVEWAYS FOR LOTS 1 THRU 7 MUST BE MARKED IN ACCORDANCE
WITH TOWN ORDINANCE 0-A-3.
13. THE DEVELOPMENT PORTION OF THE PROPERTY IS NOT LOCATED WITHIN A CT DEEP
NATURAL DIVERSITY DATABASE AREA PER CT DEEP'S NATURAL DIVERSITY DATABASE
MAP FOR MONTVILLE, CONNECTICUT, DATED JUNE 2019.
14. A WAIVER IS REQUESTED FROM THE SUBDIVISION REGULATIONS SECTION 4.6.3 TO
PERFORM A FERC TEST IN THE RESERVE AREA FOR EACH LOT AT THE TIME OF
INDIVIDUAL LOT DEVELOPMENT.
15. ALL LOTS REQUIRE A SEPTIC SYTEM DESIGNED BY A PROFESIONAL ENGINEER.
16. STREET LINE MONUMENTS SHALL BE INSTALLED PRIOR TO OBTAING A CERTIFICATE
OF OCCUPANCY.
MAP REFERENCES:
1. SURVEY MAP PREPARED FOR WALTER J. PIENIADZ, RAYMOND HILL ROAD,
MONTVILLE, CONNECTICUT, SCALE: V=100', DATE: JANUARY 3, 2001,
PREPARED BY CHANDLER, PALNER & KING.
2. A MAP SHOWING LAND OF FRED J. & JANIS J. YEITZ, 208 SIMPSON LANE,
OAKDALE, CONNECTICUT, SCALE: 1 "=20', DATE: JUN. 12,1976.
�\ §NET
3487
r-- -346 10,250SF
LAND LYING BETWEEN THE PROPOSED STREETLINE AND
THE CENTERLINE OF RAYMOND HILL ROAD TO BE DEEDED
//TO THE TOWN OF MONTVILLE FOR ROAD PURPOSES
(AREA "A" - 10,250 S.F.+)
3�2
336'+ ALONG
CENTERLINE
OF ROAD
\ RAYMOND HILL ROAD
340
t
1
SOUSE RoA t)
SOILS LEGEND;
3
RIDGEBURY, LEICASTER & WHITMAN SOILS
ZONING COMPLIANCE TABLE - R-40 DISTRICT
0-8% SLOPES, EXTREMELY STONY
45A
WOODBRIDGE FINE SANDY LOAM
ITEM
REQUIRED
EX. LOT #49 11
*LOT #49-1
*LOT #49-2 11
LOT #49-3 11
*LOT #49-4
*LOT #49-5
*LOT #49-6
LOT #49-7
LOT #49 -
LOT AREA
REAR LOT AREA
40,000 S.F.
60,000 S.F.
44,161 SF +/-
86,477 SF +/-
178,120 SF +/-
44,970 SF +/-
92,667 SF +/-
149,147 SF +/-
138,994 SF +/-
443,671 SF +/-
135,402 SF +/-
LOT FRONTAGE
150 FT.
205.00 FT.
**30 FT.
** 30 FT,
209.90 FT.
** 25 FT.
** 25 FT.
524.64 FT.
412.88 FT.
342.60 FT.
FRONT YARD
40 FT.
83'+/-
***80'+/-
***76'+/-
121+/-
* * * 104'+/-
* * * 112'+/-
***170'+/-
147'+/-
290'+/ -
SIDE YARD
15 FT.
55'+/-
160'+/-
68'+/-
56'+/-
72'+/-
95'+/-
97'+/-
117'+/-
30'+/ -
REAR YARD
40 FT.
91'+/- (DECK)
60'+/- (DECK)
218'+/-
54+/- (DECK)
54'+/ (DECK)
132'+/- (DECK)
54'+/- (DECK)
--203'+/- (DECK)
81' +/- (DECK)
BUILDING HEIGHT
35 FT.
22 FT.
26 FT.
26 FT.
26 FT.
26 FT.
26 FT.F-1
26 FT.
26 FT.
26 FT.
* - INDICATES A REAR LOT
** - INDICATES REAR LOT STRIP (25' MINIMUM)
*** - INDICATES REAR LOT FRONT YARD (60' REQUIRED)
P
! r
CECELIA C. MESSORE
VOL. 269 PG.327
(MAP 38 - LOT 41) ; �r`\ A �`, ,� �iJ I N/F
ESTATE OF
r' ;---" E N w WALTER J. PIENIADZ
i r N� 1 .� 221,g � , IN �
V�.EC.; , ` �- ' C. VOL. 332 PG. 711
N/F
(MAP 46 - LOT 51) ES OF
TATE
NOTES:
1. THIS SURVEY HAS BEEN PREPARED PURSUANT TO THE REGULATIONS OF CONNECTICUT
STATE AGENCIES SECTIONS 20-300b-1 THROUGH 2O -300b-20 AND THE "STANDARDS
FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ADOPTED BY THE
CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. ON SEPTEMBER 26, 1996. IT
IS A PROPERTY SURVEY BASED ON A RESURVEY AND CONFORMS TO HORIZONTAL
ACCURACY CLASS A-2.
2. FOR SUBJECT PROPERTIES REFERENCE IS MADE TO THE TOWN OF MONTVILLE LAND
RECORDS VOLUME 623 - PAGE 1068.
3. THE PROPERTY IS SHOWN ON ASSESSORS MAP 38 - LOT 49.
4. THE PROPERTY IS LOCATED IN ZONING DISTRICT R-40.
5. TOTAL AREA OF SUBDIVISION - (29.16) ACRES.
6. TOPOGRAPHIC INFORMATION SHOWN COMPLIES WITH T-2 & T-3 MAPPING STANDARDS.
BASE FOR LEVELS: N.A.V.D. 1988.
7. UNDERGROUND UTILITIES SHOULD BE MARKED OUT PRIOR TO ANY LOT CONSTRUCTION.
CALL BEFORE YOU DIG: 811.
8. THE INLAND WETLANDS HAVE BEEN DELINEATED BY MARK H. SULLIVAN, C.P.S.S.
9. THE PROPOSED DEVELOPMENT ALLOWS FOR THE CREATION OF 8 NEW LOTS.
A HOUSE, SEPTIC SYSTEM AND ON SITE WELL ARE PROPOSED ON EACH NEW LOT.
10. THE PROPERTY IS LOCATED WITHIN FLOOD ZONE "X" AS SHOWN ON
"FIRM MAP NEW LONDON COUNTY, CONNECTICUT, ALL JURISDICTIONS,
MAP NUMBER 09011C0332G, EFFECTIVE DATE: JULY 18, 2011.
11. THE ZONING ENFORCEMENT OFFICER MUST BE CONTACTED A MINIMUM OF 24 HOURS
PRIOR TO THE COMMENCEMENT OF CONSTRUCTION ON ALL LOTS.
12. THE SHARED DRIVEWAYS FOR LOTS 1 THRU 7 MUST BE MARKED IN ACCORDANCE
WITH TOWN ORDINANCE 0-A-3.
13. THE DEVELOPMENT PORTION OF THE PROPERTY IS NOT LOCATED WITHIN A CT DEEP
NATURAL DIVERSITY DATABASE AREA PER CT DEEP'S NATURAL DIVERSITY DATABASE
MAP FOR MONTVILLE, CONNECTICUT, DATED JUNE 2019.
14. A WAIVER IS REQUESTED FROM THE SUBDIVISION REGULATIONS SECTION 4.6.3 TO
PERFORM A FERC TEST IN THE RESERVE AREA FOR EACH LOT AT THE TIME OF
INDIVIDUAL LOT DEVELOPMENT.
15. ALL LOTS REQUIRE A SEPTIC SYTEM DESIGNED BY A PROFESIONAL ENGINEER.
16. STREET LINE MONUMENTS SHALL BE INSTALLED PRIOR TO OBTAING A CERTIFICATE
OF OCCUPANCY.
MAP REFERENCES:
1. SURVEY MAP PREPARED FOR WALTER J. PIENIADZ, RAYMOND HILL ROAD,
MONTVILLE, CONNECTICUT, SCALE: V=100', DATE: JANUARY 3, 2001,
PREPARED BY CHANDLER, PALNER & KING.
2. A MAP SHOWING LAND OF FRED J. & JANIS J. YEITZ, 208 SIMPSON LANE,
OAKDALE, CONNECTICUT, SCALE: 1 "=20', DATE: JUN. 12,1976.
�\ §NET
3487
r-- -346 10,250SF
LAND LYING BETWEEN THE PROPOSED STREETLINE AND
THE CENTERLINE OF RAYMOND HILL ROAD TO BE DEEDED
//TO THE TOWN OF MONTVILLE FOR ROAD PURPOSES
(AREA "A" - 10,250 S.F.+)
3�2
336'+ ALONG
CENTERLINE
OF ROAD
\ RAYMOND HILL ROAD
340
t
1
SOUSE RoA t)
SOILS LEGEND;
3
RIDGEBURY, LEICASTER & WHITMAN SOILS
0-8% SLOPES, EXTREMELY STONY
45A
WOODBRIDGE FINE SANDY LOAM
0-3% SLOPES
46B
WOODBRIDGE FINE SANDY LOAM
3-8% SLOPES
47C
WOODBRIDGE FINE SANDY LOAM
3-15% SLOPES, STONY
73C
CHARLTON - HATFIELD COMPLEX
0-15% SLOPES, VERY ROCKY
GRID NOR`C�
N/F
CECELIA C. MESSORE
VOL. 269 PG.327
(MAP 38 - LOT 41)
N/F
JAMES P. ROARKE &
TRACI THIBODEAU
VOL. 621 PG. 981
(MAP 38 - LOT 42)
N/F
ELEANOR MAYNARD &
DIANE L. TRONIAR
VOL. 283 PG. 504
(MAP 38 - LOT 43)
N/F
ESTATE OF
WALTER J. PIENIADZ
VOL. 332 PG. 711
(MAP 46 - LOT 51)
40'
1 i
r v
r
J `
a
r
0
49-5
a
LOT DEVELOPMENT NOTES:
1. IMPROVEMENTS DEPICTED ON THIS PLAN ARE CONCEPTUAL ONLY AND ARE INTENDED
TO DEMONSTRATE LOT DEVELOPMENT FEASIBILITY. INDIVIDUAL SITE DEVELOPMENT
PLANS WILL BE REQUIRED TO OBTAIN PERMITS FOR CONSTRUCTION.
ANY DEVEATION OF THE PROPOSED IMPROVEMENTS SHOWN MAY REQUIRE APPROVALS
FROM THE TOWN OF MONTVILLE INLAND WETLANDS & WATERCOURSES COMMISSION.
2. PASSIVE SOLAR ENERGY TECHNIQUES AS PRESCRIBED BY LAW HAVE BEEN CONSIDERED
IN THE DEVELOPMENT OF THIS PLAN.
3. ALL PROPOSED UTILITY CONNECTIONS SHALL BE COORDINATED WITH THE
GOVERNING UTILITY AUTHORITY.
4. ALL DRIVEWAYS SHALL HAVE A PAVED APRON INSTALLED TO THE STREETLINE.
DRIVEWAYS GRADED OVER 10% SHALL BE PAVED.
5. ADDITIONAL TEST HOLES MAY BE REQUIRED AT THE TIME OF LOT DEVELOPMENT.
A FERC TEST IS REQUIRED IN THE RESERVE AREA ON EACH LOT AT THE TIME OF
LOT DEVELOPMENT.
6. ALL LOTS REQUIRE AN ENGINEERED SEPTIC SYSTEM DESIGN PLAN.
TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT
AS NOTED HEREON. THIS MAP IS NOT VALID WITHOUT A LIVE SIGNATURE
AND THE EMBOSSED SEAL OF THE SURVEYOR HEREON.
RICHARD A. DESCHAMPS L.S. #70019
PAVED DRIVEWAY APRON
TO STREETLINE (TYP.)
0�. 11 ♦ .1JL 1_! Y 1 \ 1/1 -11 r 1J
,
�")® CL&P CL&P
#7811 �`ti #7810
PROVIDE NON -TRACKING 280' LINE OF SIGHT (TYP.)
CONSTRUCTION ENTRANCE (25 MPH SPEED LIMIT)
(TYP.) (SEE DETAIL) CLEAR ALL VEGETATION & STONEWALLS
TO NEW STREETLINE ALONG SIMPSON LANE
AS NEEDED TO ACHIEVE 280' SIGHT DISTANCES (TYP.)
x
PROTECT NO. 19-135
w
DRA)JiN BY: R.A.D.
DATE: 8/24/19
SCALE: 1"==401
SHEET 3 OF 7
REVISIONS
3/10/20 1 PER HEALTH DEPT. COMMENTS
280' LINE OF SIGHT (TYP.) 4/20 PER ENGINEERS COMMENTS
(25 MPH SPEED LIMIT)
m 9 IN 11 V.111 Oki a RI
JWR ASSOCIATES
234 SIMPSON LANE
MONTVILLE, CONNECTICUT
CONCEPTUAL DEVELOPMENT PLAN - LOTS I,2 & 3
ADVANCED SURVEYS, LLC.
40 20 0 40 25 Apple Lane, Colchester CT. 00415
Phone & Fax (800) 207-5979
GRAPHIC SCALE IN FEET
N
W*
E
S
LE
50'
RE
G NORTI3
OF U/G GAS MAIN r s r\ ti 11 1 11 -�� . \
\_-326- CL&]P ---328
CL&P \\�
CL&P #780:3 CL&
#7804
TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT
AS NOTED HEREON. THIS MAP IS NOT VALID WITHOUT A LIVE SIGNATURE
AND THE EMBOSSED SEAL OF THE SURVEYOR HEREON.
RICHARD A. DESCHAMPS L.S. #70019
348
INE OF SIGHT (TYP.)
E NON—TRACKING
:UCTION ENTRANCE
SEE DETAIL)
'EWAY APRON
INE (TYP.)
'EGETATION & STONEWALLS
1ETLINE ALONG RAYMOND HILL ROAD
'0 ACHIEVE 280' SIGHT DISTANCES (TYP.)
LOT DEVELOPMENT NOTES:
1. IMPROVEMENTS DEPICTED ON THIS PLAN ARE CONCEPTUAL ONLY AND ARE INTENDED
TO DEMONSTRATE LOT DEVELOPMENT FEASIBILITY. INDIVIDUAL SITE DEVELOPMENT
PLANS WILL BE REQUIRED TO OBTAIN PERMITS FOR CONSTRUCTION.
ANY DEVEATION OF THE PROPOSED IMPROVEMENTS SHOWN MAY REQUIRE APPROVALS
FROM THE TOWN OF MONTVILLE INLAND WETLANDS & WATERCOURSES COMMISSION.
2. PASSIVE SOLAR ENERGY TECHNIQUES AS PRESCRIBED BY LAW HAVE BEEN CONSIDERED
IN THE DEVELOPMENT OF THIS PLAN.
3. ALL PROPOSED UTILITY CONNECTIONS SHALL BE COORDINATED WITH THE
GOVERNING UTILITY AUTHORITY.
4. ALL DRIVEWAYS SHALL HAVE A PAVED APRON INSTALLED TO THE STREETLINE.
DRIVEWAYS GRADED OVER 10% SHALL BE PAVED.
5. ADDITIONAL TEST HOLES MAY BE REQUIRED AT THE TIME OF LOT DEVELOPMENT.
A PERC TEST IS REQUIRED IN THE RESERVE AREA ON EACH LOT AT THE TIME OF
LOT DEVELOPMENT.
6. ALL LOTS REQUIRE AN ENGINEERED SEPTIC SYSTEM DESIGN PLAN.
7. ALL VEGETATION BETWEEN THE FACE OF STONE WALL AND THE SOUTHERLY EDGE
OF RAYMOND HILL ROAD IS TO BE REMOVED.
LEGEND:
VOL.
VOLUME
PG.
PAGE
N/F
NOW OR FORMERLY
S.F.
SQUARE FEET
DH
DRILL HOLE
MON
MONUMENT
IPIN
IRON PIN
REC.
RECOVERED
CL&P
CONNECTICUT LIGHT& POWER
SNET
SOUTHERN NEW ENGLAND TELEPHONE
STONE WALL
-----
330----- EXISTING CONTOUR
30 PROPOSED CONTOUR
Q PROPOSED WELL
— .0 — - . — .u. — PROPOSED UTILITIES
PROPOSED SILT FENCE BARRIER
----- FD PROPOSED FOOTING DRAIN
D@ DECK
• IRON PIN OR DRILL HOLE TO BE SET
IN MONUMENMT TO BE SET
EROSION AND SEDIMENT CONTROL REPORT:
SUBDIVISION PLAN
PREPARED FOR
JWR ASSOCIATES
234 SIMPSON LANE
MONTVILLE, CONNECTICUT
REFERENCE IS MADE TO:
1. Connecticut Guidelines for Soil Erosion and Sediment
Control - 2002.
DEVELOPMENT:
The proposed subdivision will allow for the creation of 8 new building
lots ranging in size from 1.03 acres to 10.18 acres. All new proposed lots
will be serviced by an on site septic system & well.
Individual Site Development Plans will be required to obtain permits
for construction.
GENERAL PROCEDURES
1. Prior to conducting any construction activities on the Property, the Applicant shall meet with the Montville Wetlands
Enforcement Officer and the Montville Zoning Enforcement Officer to discuss and agree upon the method of installation
and maintenance of erosion and sediment control measures during construction.
2. Subsequent to the meeting described in Paragraph 1 of the General Procedures Section of this Narrative, the Applicant's
land surveyor shall delineate in the field the limits within which construction activities shall occur and will further
designate the location for installation of all erosion and sediment control measures as delineated on plans entitled
"Subdivision Plan Prepared For JWR Associates 234 Simpson Lane Montville, Connecticut Conceptual Development Plan
- Lots 12 & 3, Lots 4, 5, 6 & 7, Lot 8 Project No. 19-135 Drawn By: R.A.D. Date: 8/24/19 Scale: 1" =40' Sheets 3 of 7, 4
of 7 and 5 of 7 Advanced Surveys, LLC. 25 Apple Lane, Colchester CT. 06415 Phone & Fax (860) 267-5979".
3. Upon agreement of the Montville Wetlands Enforcement Officer and the Montville Zoning Enforcement Officer, the
Applicant shall install erosion control devices and measures as delineated on the Plan and as formulated at the meeting
required pursuant to the provisions of Paragraph 1 of the General Procedures Section of this Narrative.
4. At such time as all erosion and sediment control measures have been installed in accordance with the Plan, and in
accordance with the requirements of the Montville Wetlands Enforcement Officer and the Montville Zoning Enforcement
Officer enunciated at the meeting described in Paragraph 1 of the General Procedures Section hereof, the Applicant shall
contact the Montville Wetlands Enforcement Officer and Montville Zoning Enforcement Officer to perform an on-site
inspection of said erosion and sediment control measures. In no event shall soil disturbance occur, or the Applicant engage
in other construction activities other than clearing, until such time as the Montville Wetlands Enforcement Officer and
Montville Zoning Enforcement Officer have reviewed and approved the installation of all erosion and sediment control
measures.
5. All erosion and sediment control measures shall be inspected at least weekly while construction is ongoing, and after
every storm event resulting in the deposition of in excess of one-tenth of one inch (0.1 ") of precipitation and repaired and
maintained as necessary.
6. If any erosion or sediment control measure fails or is not installed or maintained in accordance with the Plan or the
directives of the Montville Wetlands Enforcement Officer and Montville Zoning Enforcement Officer, the Applicant shall
be required to cease all construction activities on the lot on which construction is ongoing until such time as said erosion
and sediment control measures have been installed in accordance with the plan or the directives of the Montville Wetlands
Enforcement Officer or the Montville Zoning Enforcement Officer and approval of the same has been certified by the
Montville Wetlands Enforcement Officer and the Montville Zoning Enforcement Officer.
7. William J. Pieniadz, 157 Simpson Lane, Oakdale, Connecticut 06370 (860) 848-2372 (telephone) (860) 608-9890
(cellular telephone) e-mail: bill@pandhconstruction.com shall be the party responsible for compliance with all erosion and
sediment control measures in conjunction with all construction activities on the project site.
8. It is anticipated that construction of the project will commence during the late Spring of 2020 and continue
sequentially until all building lots in the Project have been absorbed by the market. It is anticipated that the total
construction phase will accommodate approximately three (3) years.
9. During the stabilization period (after construction on each lot has been completed but prior to certification of
approval by the Montville Wetlands Enforcement Officer and the Montville Zoning Enforcement Officer for the removal
of erosion and sediment control measures), all erosion and sediment control measures shall be maintained in proper
working order. All erosion and sediment control measures shall be inspected and maintained and/or repaired, as necessary,
on a weekly basis during the stabilization period and after each storm occurrence.
10. During the stabilization period, any erosion which occurs shall be immediately repaired by the Applicant, reseeded
with the seeding mixes set forth in the Construction Sequencing Sections of this Narrative and restabilized.
11. Once stabilization has been completed, and certification thereof obtained in writing from the Montville Wetlands
Enforcement Officer and Montville Zoning Enforcement Officer, all erosion and sediment control measures shall be
removed by the Applicant.
CONSTRUCTION SEQUENCING - DRIVEWAY CROSSING FOR LOT 49-8
In conjunction with the development of Lot 49-8, the Applicant proposes to engage in regulated activities in
conjunction with the crossing of a small neck of wetlands in order to access the developable area of proposed Lot 49-8
with a single family residential driveway crossing and the installation of a 15" reinforced concrete pipe to equalize any
impounded water that may occur in the wetland system during a storm event.
1. The Applicant shall install an anti -tracking construction entrance at the intersection of the proposed driveway with
Raymond Hill Road.
2. The Applicant shall clear, but not grub, the area for the construction of the driveway to its intersection with Raymond
Hill Road.
3. Marketable timber shall be removed from the Property. Tree tops shall be chipped and woodchip berms may be
substituted for other forms of erosion control delineated on the Plan.
4. Erosion control measures shall be installed in the location delineated on Sheet 5 of 7 of the Plan along the downgradient
side of construction activities proposed on said Lot 49-8.
5. Once all erosion control measures have been installed, the Applicant shall request an inspection of the installation of
erosion and sediment control measures by the Town of Montville Wetlands Enforcement Officer and Town of Montville
Zoning Enforcement Officer. In no event shall grubbing or soil disturbance occur until such time as the installation of
erosion and sediment control measures has been approved by the Montville Wetlands Enforcement Officer and Montville
Zoning Enforcement Officer.
6. Stumps shall be either be removed or ground in place. In the event that stumps are removed, they shall be removed to a
location approved in advance by the Montville Zoning Enforcement Officer. In no event shall stumps be buried on site.
7. Surface soil shall be stripped and shall be stockpiled for future use in site stabilization. In no event shall surface soil
stockpiles be located in a designated wetland area or any upland review area adjacent to wetlands.
8. Surface soil stockpiles shall be stabilized by installing a single row of silt fence around each stockpile location. The
stockpiles shall be constructed at a slope not to exceed 3:1 and shall be stabilized by seeding with an annual ryegrass mix
and mulch. The annual ryegrass mix shall be applied at a rate of 40 pounds per acre. Mulch shall be applied at a rate of 80
pounds per 1,000 square feet and shall be spread by hand or with a mulch blower.
9. The driveway shall be "boxed out". The area shall be prepared for the installation of the 15" reinforced concrete pipe
cross culvert by excavating and removing 18" of organic material in accordance with the "Driveway Through Inland
Wetlands" detail as depicted on Sheet 6 of 7 of the Plan. The excavated area shall be backfilled with 18" of bankrun gravel.
The 15" reinforced concrete pipe cross culvert shall be installed and thereafter backfilled with a minimum of 12" of
bankrun gravel cover and 4" minimum of processed gravel or equivalent bearing surface. Flared end sections shall be
installed at the inlet and outlet of the cross culvert and rip rap inlet and outlet protection shall be installed in accordance
with the Plan.
10. Disturbed areas shall be stabilized by spreading stockpiled surface soil over these areas at a thickness of not less than
4". Areas to be seeded will be prepared by spreading ground limestone equivalent to 50% percent calcium plus
magnesium oxide applied at a rate of 50 pounds per 1,000 square feet. Fertilizer (10-10-10) is to be applied at a rate of 7.5
pounds per 1,000 square feet. Following the initial application of lime and fertilizer, there are to be no periodic
applications of lime and fertilizer. Disturbed areas will be seeded with a seeding mix of Kentucky Bluegrass applied at a
rate of 20 pounds per acre, Creeping Red Fescue applied at a rate of 20 pounds per acre and perennial ryegrass applied at a
rate of 5 pounds per acre for a total application of 45 pounds per acre. A hydroseed mix utilizing comparable cultivars
shall be a suitable substitute. In the event that a hydroseed mix is not utilized, after seeding, the areas seeded shall be
stabilized with hay mulch
immediately applied at a rate of 70 pounds per 1,000 square feet and anchored by tracking. Seeding shall only occur
between April 1 to June 15 and August 15 to October 1.
CONSTRUCTION SEQUENCING - INDIVIDUAL LOT DEVELOPMENT (NO REGULATED ACTIVITIES)
1. The Applicant shall clear, but not grub, within the limits of clearing delineated for each lot on the Plan.
2. The Applicant shall remove the surface soil from the area for the construction of the construction entrance for each lot as
delineated on the Plan.
3. The Applicant shall install a construction entrance to each lot in accordance with the "Construction Entrance" Detail
delineated on the Plan.
4. The Applicant shall install a single row of silt fence or a woodchip berm at the down gradient limits of disturbance on
each individual lot.
5. Upon the completion of installation of erosion and sediment control measures, the Applicant, or its successor, as the case
may be, shall contact the Montville Wetlands Enforcement Officer and the Montville Zoning Enforcement Officer to
perform an inspection of the installation of erosion and sediment control measures. Other than the construction of the
anti -tracking pad, no soil shall be disturbed until such time as the installation of erosion and sediment control measures has
been approved by the Montville Wetlands Enforcement Officer and the Montville Zoning Enforcement Officer.
6. The Applicant shall strip the surface soil in the area of construction of the dwelling house, yard and driveway. Surface
soil shall be retained on the lot for eventual use in the stabilization of disturbed areas. Surface soil stockpiles shall be
stabilized by installing a single row of silt fence around each stockpile location. The stockpile shall be constructed at a
slope not to exceed 3:1 and shall be stabilized by seeding with an annual ryegrass mix and mulch. The annual ryegrass
mix shall be applied at a rate of 40 pounds per acre. Mulch shall be applied at the rate of 80 pounds per 1,000 square feet,
and shall be spread by hand or with a mulch blower. In conjunction with the clearing of each lot, stumps shall either be (i)
ground in place or (ii) removed to a location approved, in advance, by the Zoning Enforcement Officer and Wetlands
Enforcement Officer of the Town of Montville. No stumps shall be buried on site.
7. The cellar hole shall be excavated. Sufficient material shall be retained on site for backfilling the foundation.
Additional material shall be transported from the site.
8. Footings shall be poured in the cellar hole and thereafter, foundation walls shall be poured subsequent to the approval of
the footings by the Building Official of the Town of Montville.
9. Upon completion of the construction of the foundation, footing drains shall be installed.
10. Upon completion of installation of the footing drains, the foundation and footings shall be backfilled with stored
material.
11. Construction of the dwelling house shall be completed.
12. Upon the completion of construction of improvements, all disturbed areas shall be stabilized by loaming the same with
not less than four (4") inches of topsoil obtained from the surface soil stockpile. Areas to be seeded will be prepared by
spreading ground limestone equivalent to 50 percent calcium plus magnesium oxide applied at a rate of 100 pounds per
1,000 square feet. Fertilizer (10-10-10) is to be applied at a rate of 15 pounds per 1,000 square feet. Seeding shall be
applied with a mix of Kentucky Bluegrass applied at a rate of 20 pounds per acre, Creeping Red Fescue applied at a rate of
20 pounds per acre and Perennial Ryegrass applied at a rate of 5 pounds per acre for a total application of 45 pounds per
acre. After seeding, the areas seeded shall be stabilized with hay mulch immediately applied at a rate of 70 pounds per
1,000 square feet and anchored by tracking. Seeding shall only occur between April 1 and June 15 and August 15 to
October 1.
13. Once all seeded areas have been thoroughly stabilized and cut with two cuttings, erosion and sediment control
measures shall be removed.
FILTER BARRIER INSTALLATION & MAINTENANCE:
1. Dig a 6" trench on the uphill side of the barrier
location.
2. Position the posts on the downhill side of the barrier
and drive the post 1.5 feet into the ground.
3. Lay the bottom 6" of the fabric in the trench to prevent
undermining and backfill.
4. Inspect and repair barrier after heavy rainfall.
5. Sediment deposits are to be removed when they reach
a height of one foot behind the barrier and are to be
deposited in an area which is not regulated by the Inland
Wetlands Commission.
6. Inspections and necessary repairs will be made twice
weekly.
STRAW BALE
TWO-2"x2"x4' STAKES
IN EACH BALE (TYP.)
P•.
O 0 0 O 17
0 0 0 0 0 0 0
0 0 0 0 0 ,o 0
0000�0�0oof -100
00 0
00 0
® 00 0 0
0° 0
0
00 '0
100
e '0
® 00 o- 0
0
0 0
INSTALL FILTER FABRIC
AROUND 3 SIDES OF
HAYBALES
MODIFIED RIPRAP
FLOW
PLAN VIEW PLUNGE POOL
CONSTRUCTION NOTES:
1. SILT FENCE FILTER CLOTH TO BE SECURELY FASTED TO
GRADE STAKE WITH STAPLES 6" ON CENTER.
2. WHEN 2 SECTIONS OF FILTER CLOTH ADJOIN ONE ANOTHER
THEY SHALL OVERLAP BY 6" AND BE FOLDED.
3. BALES SHALL BE PLACED IN A ROW WITH ENDS TIGHTLY
ABUTTING HE ADJACENT BALES.
DE -WATERING PLAN
A CLEAR DISCHARGE SHALL BE PROVIDED AS FOLLOWS:
A. THE WATER SHALL BE PUMPED TO A DEWATERING STRUCTURE WHICH
SHALL BE LOCATED AT LEAST 50 FEET FROM ANY REGULATED WETLAND AREA.
B. THE DEWATERING STRUCTURE SHALL BE SIZED TO ACCOMMODATE
EXISTING FLOWS. (SEE DETAIL)
C. THE DEWATERING STRUCTURE SHALL BE SURROUNDED BY SILT FENCE AND
THE OUTFALL IS TO BE DISCHARGED TO A VEGETATED AREA.
STRAW BALE BARRIER DE -WATERING DETAIL
NOT TO SCALE
1,c
CONSTRUCTION ENTRANCE
NOT TO SCALE
PLAN
12' WIDE
PROPOSED DRIVEWAY
CL
4" MIN. PROCESSED
GRAVEL OR EQUIVALENT
LOAM AND
SEED SLOPE
BOTH SIDES
PROVIDE
FLARED END UNIT
PROVIDE 12" MIN. BANKRUN GRAVEL
FLARED END UNIT
INSTALL PIPE AS REQUIRED
e , \ ✓\�\\'�` \,° i\�\ \�\\\ ,\ , fie\ .
(�I EXCAVATE 18" ORGANIC MATERIAL 5'
BACKFILL WITH 1" CRUSHED STONE EXISTING WETLANDS ELEVATION
DRIVEWAY THROUGH
INLAND WETLANDS
NOT TO SCALE
FINISHED GRADE
ELECTRICAL, TELEPHONE AND \2: .::.::.:;.;:.:.::.:::.:: ;::.:.:; ;.::: FINE SAND .:.: ,::::.::.:.;.;:-:.:. _.; ,:::.: ,:::-:.
BOTTOM 2" OF TEMP.
CABLE TELEVISION SERVICE
PATCH TO REMAIN
TO ALL MILLED SURFACES
PRIOR TO PAVING
12 1211
MIN MIN
`O
NOTES:
FLARED
IT UTILITY TRENCH
CROSS SECTION
MODIFIED NOT TO SCALE
RIPRAP
a -
N EXISTING G
N
3 -
1
FILTER FABRIC
SECTION
PREFORMED RIPRAP SCOUR HOLE
NOT TO SCALE
OF ROAD
W
OF ROAD
GUTTER -
0
N 5 N
8" HIGHER THAN GUTTER
� N
~�
OR R.O.W. LINE
2®oja
6" HIGHER THAN
GUTTER
I
®e
VARIES 10' 10'
SAG CURVE IN DRIVE
OF ROAD OR R.O.W. LINE
6" HIGHER THAN
GUTTER
GUTTER
20/
VARIES 10' 10' °
CREST CURVE IN DRIVE
*DRIVEWAYS AT A 10% OR MORE SLOPE
SHALL BE PAVED
RESIDENTIAL DRIVEWAY DETAILS
NOT TO SCALE
TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT
AS NOTED HEREON. THIS MAP IS NOT VALID WITHOUT A LIVE SIGNATURE
AND THE EMBOSSED SEAL OF THE SURVEYOR HEREON.
RICHARD A. DESCHAMPS L.S. #70019
FILTER
FABRIC
POST -
COMPACTED
BACKFILL ---/
LANGLE 100 UP SLOPE
R STABILITY AND
LF CLEANING
NQ
SILT FENCE
NOT TO SCALE
8" BASE COURSE
GRAVEL DRIVEWAY
NOT TO SCALE
APPLY HOT PAVEMENT
JOINT SEALER TO
ALL MILLED EDGES
EXIST. ROAD
SURFACE
MILL ENTIRE TEMP.
PATCH AND 18"
BEYOND PREVIOUS
SAWCUT IN ALL
DIRECTIONS
(WIDTH VARIES)
MATCH EXISTING
WETLANDS ELEVATION
BOTH SIDES
INSTALL 100 SF.
MODIFIED RIPRAP
BOTH SIDES
NEW 2" MIN. COMPACTED
CLASS 2 BITUMINOUS CONCRETE
PLACED IN A SINGLE LIFT
EXIST. ROAD
SURFACE
II���II
BOTTOM 2" OF TEMP.
APPLY TACK COATING .: •• ° ' ,
PATCH TO REMAIN
TO ALL MILLED SURFACES
PRIOR TO PAVING
NOTES:
.�
EDGE OF 1. MILLING LINES SHALL BE
TRENCH STRAIGHT AND NEAT.
2. HUMPING OF PERMENANT
PATCH SHALL RQI BE
ALLOWED.
3. PATCH SHALL BE
CONSTRUCTED TO BE
INDISTINGUISHABLEN
CROSS-SECTION
OVER ET BY
MOTOR VEHICLE AT
POSTED SPEED LIMIT.
FINISH GRADE
2" STONE
PAVEMENT REPAIR DETAIL
CROSS SECTION
NOT TO SCALE
PAVED DRIVEWAY
(4" CROSS SLOPE)
24"
o�
STONE SHOULDER
NOT TO SCALE
BITUMINOUS CONCRETE
DRIVEWAY
21/211---
6"
1/2'1---
6" PROCESSED
GRAVEL (MIN.)
BITUMINOUS CONCRETE DRIVES
NOT TO SCALE
(2)-2"x2"X3' STAKES
EACH BALE
TH#A - 0"-15" TOPSOIL
- 15"-25" SUBSOIL
- 25"-72" GRAY COMPACT SAND & SILT, STONES
NO WATER, MOTTING@2511, NO LEDGE
ROOTS TO 34", RESTRICTIVE - 25"
TH#B - 0"-7" TOPSOIL
- 7"-23" SUBSOIL
- 23"-74" GRAY COMPACT SAND & SILT, STONES
NO WATER, MOTTING@2311 5 NO LEDGE
ROOTS TO 34", RESTRICTIVE - 23"
TH#lA -0"-11" TOPSOIL
- 11 "-32" SUBSOIL
- 32"-73" FIRM SAND & GRAVEL, SOME SILT
NO WATER, MOTTING@2611, NO LEDGE
ROOTS TO 26", RESTRICTIVE - 26'°
TH#1B -0"-11" TOPSOIL
- 11 "-23" SUBSOIL
- 23"-72" FIRM SAND & GRAVEL, SOME SILT
NO WATER, MOTTING@28", NO LEDGE
ROOTS TO 40°', RESTRICTIVE - 28"
TH#1C - 0"-7" TOPSOIL
- 7"-30" SUBSOIL
- 30"-72" FIRM SAND & GRAVEL, SOME SILT
NO WATER, MOTTING@3011, NO LEDGE
ROOTS TO 28", RESTRICTIVE - 30"
TH#1D - 0"-8" TOPSOIL
8"-32" SUBSOIL
- 32"-74" FIRM SAND & GRAVEL, SOME SILT
NO WAFER, MOTTING@3211, NO LEDGE
ROOTS TO 27", RESTRICTIVE - 32"
TH#2A - 0"-6" TOPSOIL
- 6"-24" SUBSOIL
- 24"-79" FIRM SAND W/SILTS, ROCK
NO WATER, MOTTING@24", NO LEDGE
ROOTS TO 2111 1 RESTRICTIVE - 24"
TH#2B - 0"-9" TOPSOIL
9"-27" SUBSOIL
27"-76" .FIRM SAND W/SILTS, ROCK
NO WATER, NOTTING@27", NO LEDGE
ROOTS TO 26", RESTRICTIVE - 27"
TH#2C - 0"-8" TOPSOIL
- 8"-29" SUBSOIL
29"-77" FIRM SAND W/SILTS, ROCK
NO WATER, MOTTING@2911, NO LEDGE
ROOTS TO 30", RESTRICTIVE - 29"
TH#2D - 0"-10" TOPSOIL
- 10"-28" SUBSOIL
- 28"-70" FIRM SAND W/SILTS, ROCK
NO WATER, MOTTING@2811, NO LEDGE
ROOTS TO 32°', RESTRICTIVE - 28"
TEST HOLE DATA
WITNESSED BY MICHAEL KIItBY
LJNCAS HEALTH DISTRICT - 8/29/19, 8/30/19 & 10/24/19
TH#3A - 0"-10" TOPSOIL
- 10"-24" SUBSOIL
- 24"-76" COMPACT SAND W/SILTS, ROCK
NO WATER, MOTTING@2411, NO LEDGE
ROOTS TO 19", RESTRICTIVE - 24"
TH#3B - 0"-9" TOPSOIL
- 9"-28" SUBSOIL
- 28"-81" FIRM SAND SOME SILT, STONES
NO WATER, MOTTING@28115 NO LEDGE
ROOTS TO 41 °', RESTRICTIVE - 28"
TH#3C - 0"-8" TOPSOIL
- 8"-25" SUBSOIL
- 25°'-76" FIRM SAND SOME SILT, STONES
NO WATER, MOTTING@2511, NO LEDGE
ROOTS TO 25", RESTRICTIVE - 25"
TH#3D - 0"-8" TOPSOIL
- 8"-26" SUBSOIL
- 26"-84" FIRM SAND SOME SILT, STONES
NO WATER, MOTTING@26", NO LEDGE
ROOTS TO 30", RESTRICTIVE - 26"
TH#4A - 0"-8" TOPSOIL
- 8"-21" SUBSOIL
-
21"-71" GRAY COMPACT SAND & SILT, ROCKS
NO WATER, MOTTING@21 ", NO LEDGE
ROOTS TO 21 ", RESTRICTIVE - 21"
- 7"-26" SUBSOIL
- 26"-86" GRAY COMPACT SAND & SILT, ROCKS
NO WATER, MOTTING@26", NO LEDGE
ROOTS TO 25", RESTRICTIVE - 26"
TH#4C - 0"-9" TOPSOIL
- 9"-30" SUBSOIL
30"-74" GRAY COMPACT SAND & SILT, ROCKS
NO WATER, MOTTING@30", NO LEDGE
ROOTS TO 20", RESTRICTIVE - 30"
TH#4D - 0"-7" TOPSOIL
- 7"-25" SUBSOIL
- 25"-82" GRAY COMPACT SAND & SILT, ROCKS
NO WATER, MOTTING@2591, NO LEDGE
ROOTS TO 21 ", RESTRICTIVE - ZS"
LOT #49-1
4 BEDROOM RESIDENCE
SLOPE 1.5%
PERC RATE - 1" IN 7 MINUTES
RECEIVING SOIL DEPTH (AVG.) 29"
(HF) 56 X (FF) 1.75 X (PF) 1.0 = 98'
MLSS REQUIRED - 98.0'
MLSS PROVIDED 98'
4 BEDROOM HOUSE REQUIRES 577.5 S.F.
OF EFFECTIVE LEACHING AREA
USE 98 FEET OF GEOMATRIX-GST 6212 (12" DEPTH)
(98 X 10.0 = 980 S.F.)
USE 1,250 GAL. 2 COMPARTMENT SEPTIC TANK
W/ OUTLET FILTER DEVICE
LOT 49-2
4 BEDROOM RESIDENCE
SLOPE 4.8%
PERC RATE - 1" IN 8 MINUTES
RECEIVING SOIL DEPTH (AVG.) 27"
(HF) 30 X (FF) 1.75 X (PF) 1.0 = 52.5'
MLSS REQUIRED - 52.5'
MLSS PROVIDED 58'
4 BEDROOM HOUSE REQUIRES 577.5 S.F.
OF EFFECTIVE LEACHING AREA
US E58 FEET OF GEOMATRIX-GST 6212 (12" DEPTH)
(58 X 10.0 = 580 S.F.)
USE 1,250 GAL. 2 COMPARTMENT SEPTIC TANK
W/ OUTLET FILTER DEVICE
TH#5A - 0"-8" TOPSOIL
8"-32" SUBSOIL
- 32"-74" GRAY FIRM SAND W/SILT
NO WATER, MOTTING@3211, NO LEDGE
ROOTS TO 23", RESTRICTIVE - 32"
TH#5B - 0"-8" TOPSOIL
- 8"-31" SUBSOIL
31 "-72" GRAY FIRM SAND W/SILT, MOTTLED
WATER@5611, MOTTING@24", NO LEDGE
ROOTS TO 19", RESTRICTIVE - 24"
TH#5C - 0"-7" TOPSOIL
- 7"-29" SUBSOIL
- 29"-72" GRAY FIRM SAND W/SILT
NO WATER, MOTTING@29115 NO LEDGE
ROOTS TO 19", RESTRICTIVE - 29"
TH#5D - 0"-9" TOPSOIL
- 9"-24" SUBSOIL
24"-76" GRAY FIRM SAND W/SILT
WATER@56", MOTTING@24", NO LEDGE
ROOTS TO 23", RESTRICTIVE - 24"
TH#6A - 0"-7" TOPSOIL
- 7"-24" SUBSOIL
- 24"-72°' GRAY FIRM SAND W/SILT
WATER@46", MOTTING@24'°, NO LEDGE
ROOTS TO 27°', RESTRICTIVE - 24"
TH#6B - 0"-7" TOPSOIL
- 7"-29" SUBSOIL
- 29"-81" GRAY FIRM SAND W/SILT, MOTTLED
NO WATER, MOTTING@29", NO LEDGE
ROOTS TO 29", RESTRICTIVE - 29"
TH#6C - 0"-8" TOPSOIL
- 8"-24" SUBSOIL
- 24"-80" GRAY FIRM SAND W/SILT
WATER@59°', MOTTING@24", NO LEDGE
ROOTS TO 23", RESTRICTIVE - 24"
TH#6D - 0"-7" TOPSOIL
- 7"-24" SUBSOIL
24"-72" GRAY FIRM SAND W/SILT
NO WATER, MOTTING@2411, NO LEDGE
ROOTS TO 20 RESTRICTIVE - 24"
LOT #49-3
4 BEDROOM RESIDENCE
SLOPE 6.5%
PERC RATE - V IN 7 MINUTES
RECEIVING SOIL DEPTH (AVG.) 27.5"
(HF) 28 X (FF) 1.75 X (PF) 1.0 = 49.0'
MLSS REQUIRED - 49.0'
MLSS PROVIDED 58'
4 BEDROOM HOUSE REQUIRES 577.5 S.F.
OF EFFECTIVE LEACHING AREA
USE 58 FEET OF GEOMATRIX-GST 6212 (12" DEPTH)
(58 X 10.0 = 580 S.F.)
USE 1,250 GAL. 2 COMPARTMENT SEPTIC TANK
W/ OUTLET FILTER DEVICE
LOT #49-4
4 BEDROOM RESIDENCE
SLOPE 3.2%
PERC RATE - V IN 7 MINUTES
RECEIVING SOIL DEPTH (AVG.) 25.511
(HF) 42 X (FF) 1.75 X (PF) 1.0 = 73.5'
MLSS REQUIRED - 73.5'
MLSS PROVIDED 74'
4 BEDROOM HOUSE REQUIRES 577.5 S.F.
OF EFFECTIVE LEACHING AREA
USE 74 FEET OF GEOMATRIX-GST 6212 (12" DEPTH)
(74 X 10.0 = 740 S.F.)
USE 1,250 GAL. 2 COMPARTMENT SEPTIC TANK
W/ OUTLET FILTER DEVICE
LOT #49-5
4 BEDROOM RESIDENCE
SLOPE 2.2%
PERC RATE - 1 " IN 8 MINUTES
RECEIVING SOIL DEPTH (AVG.) 27"
(HF) 42 X (FF) 1.75 X (PF) 1.0 = 73.5'
MLSS REQUIRED - 73.5'
MLSS PROVIDED 74'
4 BEDROOM HOUSE REQUIRES 577.5 S.F.
OF EFFECTIVE LEACHING AREA
USE 74 FEET OF GEOMATRIX-GST 6212 (12" DEPTH)
(74 X 10.0 = 740 S.F.)
USE 1,250 GAL. 2 COMPARTMENT SEPTIC TANK
W/ OUTLET FILTER DEVICE
LOT 49-6
4 BEDROOM RESIDENCE
SLOPE 5.0%
PERC RATE -I" IN 8 MINUTES
RECEIVING SOIL DEPTH (AVG.) 26.25"
(HF) 30 X (FF) 1.75 X (PF) 1.0 = 52.5'
MLSS REQUIRED - 52.5'
MLSS PROVIDED 58'
4 BEDROOM HOUSE REQUIRES 577.5 S.F.
OF EFFECTIVE LEACHING AREA
USE 58 FEET OF GEOMATRIX-GST 6212 (12" DEPTH)
(58 X 10.0 = 580 S.F.)
USE 1,250 GAL. 2 COMPARTMENT SEPTIC TANK
W/ OUTLET FILTER DEVICE
T11#7A - 0"-7" TOPSOIL
- 7°'-25" SUBSOIL
25"-78" GRAY FIRM SAND W/SILT
NO WATER, MOTTING@2511, NO LEDGE
ROOTS TO 21 it, RESTRICTIVE - 25"
TH#7B - 0"-8" TOPSOIL
- 8"-26" SUBSOIL
- 26"-79" GRAY FIRM SAND W/SILT,MOTTLED
WATER@5911, MOTTING@2611, NO LEDGE
ROOTS TO 24", RESTRICTIVE - 26"
TH#7C - 0"-8" TOPSOIL
- 8°'-33" SUBSOIL
-
33"-79" GRAY FIRM SAND W/SILT
NO WATER, MOTTING@2511, NO LEDGE
ROOTS TO 27", RESTRICTIVE - 25"
TH#7D - 0"-7" TOPSOIL
- 7"-29" SUBSOIL
29"-76" GRAY FIRM SAND W/SILT
NO WATER, MOTTING@2911, NO LEDGE
ROOTS TO 22", RESTRICTIVE - 29"
TH#8A - 0"-10" TOPSOIL
- 10"-24" SUBSOIL
24"-69" GRAY COMPACT SAND & SILT
WATER@22", MOTTING@22", NO LEDGE
NO ROOTS, RESTRICTIVE - 22"
TH#8B - 0"-10" TOPSOIL
- 10"-23" SUBSOIL
-
23"-68" GRAY COMPACT SAND & SILT
WATER@25", MOTTING@23", NO LEDGE
NO ROOTS, RESTRICTIVE - 23"
TH#8C - 0"-9" TOPSOIL
- 9"-20" SUBSOIL
- 20"-70" GRAY COMPACT SAND & SILT
WATER@2411, MOTTING@2011, NO LEDGE
NO ROOTS, RESTRICTIVE - 20"
TH#8D - 0"-12" TOPSOIL
- 12"-23" SUBSOIL
-
23"-64" GRAY COMPACT SAND & SILT
WATER@2411, MOTTING@2411, NO LEDGE
NO ROOTS, RESTRICTIVE - 24"
LOT 49-7
4 BEDROOM RESIDENCE
SLOPE 4.5%
PERC RATE - V IN 9 MINUTES
RECEIVING SOIL DEPTH (AVG.) 25.25"
(HF) 30 X (FF) 1.75 X (PF) 1.25 = 65.6'
MLSS REQUIRED - 65.6'
MLSS PROVIDED 66'
4 BEDROOM HOUSE REQUIRES 577.5 S.F.
OF EFFECTIVE LEACHING AREA
USE 66 FEET OF GEOMATRIX-GST 6212 (12" DEPTH)
(66 X 10.0 = 660 S.F.)
USE 1,250 GAL. 2 COMPARTMENT SEPTIC TANK
W/ OUTLET FILTER DEVICE
LOT 49-8
4 BEDROOM RESIDENCE
SLOPE 3.3%
PERC RATE - 1" IN 12 MINUTES
RECEIVING SOIL DEPTH (AVG.) 22.25"
(HF) 42 X (FF) 1.75 X (PF) 1.25 = 91.9'
MLSS REQUIRED - 91.9'
MLSS PROVIDED 92'
4 BEDROOM HOUSE REQUIRES 787.5 S.F.
OF EFFECTIVE LEACHING AREA
USE 92 FEET OF GEOMATRIX-GST 6212 (12" DEPTH)
(92 X 10.0 = 920 S.F.)
USE 1,250 GAL. 2 COMPARTMENT SEPTIC; TANK
W/ OUTLET FILTER DEVICE
EXISTING LOT #49
3 BEDROOM RESIDENCE
SLOPE 7.5%
PERC RATE - V IN 9 MINUTES
RECEIVING SOIL DEPTH (AVG.) 26"
(HF) 30 X (FF) 1.5 X (PF) 1.0 = 45'
MLSS REQUIRED - 45'
MLSS PROVIDED 50'
3 BEDROOM HOUSE REQUIRES 495 S.F.
OF EFFECTIVE LEACHING AREA
USE 50 FEET OF GEOMATRIX-GST 6212 (12" DEPTH)
(50 X 10.0 = 500 S.F.)
USE 1,000 GAL. 2 COMPARTMENT SEPTIC TANK
W/ OUTLET FILTER DEVICE
TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT
AS NOTED HEREON. THIS MAP IS NOT VALID WITHOUT A LIVE SIGNATURE
AND THE EMBOSSED SEAL OF THE SURVEYOR HEREON.
RICHARD A. DESCHAMPS L.S. #70019
PERC TEST DATA
PERFORMED BY ADVANCED SURVEYS, LLC - 8/29/19, 8/30/19 & 10/24/19
PERC #A
DEPTH - 241
'
PRESOAK - 8:35
9:35 - 6"
9:45 -11"
9:55 -13 1/4"
10:05 -17 3/4"
10:15 - 19 1/4"
10:25 - 201/2"
10:35 - 211/2"
PERC RATE - 9 MINUTES PER INCH
PERC #1
DEPTH - 23"
PRESOAK - 8:30
9:30 -10"
9:40 -121/2"
9:50 -15"
10:00 -17"
10:10 -18 3/8"
10:20 - 20"
10:30 - 211/4" DRY
PERC RATE - 7 MINUTES PER INCH
PERC #2
DEPTH - 22"
PRESOAK - 8:50
9:40 - 8 1/2"
9:50 -12"
10:00 - 151/4"
10:10 -17 3/4"
10:20 - 19"
10:30 - 20 1/4"
PERC RATE - 8 MINUTES PER INCH
PERC #3
DEPTH - 23"
PRESOAK -10:00
10:45 - 3 1/2"
10:55 - 9"
11:05 -12 1/2"
11:15 -15"
11:25 -17 1/4"
11:35 - 19"
11:45 - 201/4"
PERC RATE - 7 MINUTES PER INCH
PERC #4
DEPTH - 24"
PRESOAK - 7:30
8:10-2"
8:20 - 8 1/2"
8:30 -14"
8:40 -17"
8:50 -19"
9:00 - 201/2"
9:10 - 213/4"
PERC RATE - 7 MINUTES PER INCH
PERC #5
DEPTH - 22"
PRESOAK - 8:10
9:20 - 3"
9:30 - 6"
9:40 - 8"
9:50 -10"
10:00 -11 1/2"
10:10 -12 3/4"
10:20 -14"
PERC RATE - 8 MINUTES PER INCH
PERC #6
DEPTH - 2511
PRESOAK -11:20
12:10 - 7 1/2"
12:20 - 12"
12:30 - 16"
12:40 - 18 1/2"
12:50 -19 3/4"
11:00 - 21"
11:15 - 22"
PERC RATE - 9 MINUTES PER INCH
PERC #7
DEPTH - 22"
PRESOAK - 8:45
10:30 - 8 1/4"
10:40 - 14"
10:50 - 17 1/2"
11:00-19"
11:10 - 20" DRY
PERC RATE -11 MINUTES PER INCH
PERC #8
DEPTH - 18"
PRESOAK - 8:20
9:15-5 1/2"
9:25-83/4"
9:35 -101/2"
9:45 -11 3/4"
9:55 -12 3/4"
10:05 -13 1/2"
10:15 - 141/2"
PERC RATE -12 MINUTES PER INCH