HomeMy WebLinkAboutSite PlansLOT I ti �
TEST DATE 09/16/87
' av � ra ;
TH 1 0 to TOPSOIL ,
51
" to 20" YELLOW/BROWN FINE SANDY LOAM\
201
' to `lad" PALE BROWN MEDIUM --COARSE. GRAVE LY. SAND (l
CONSISTENCY)
NO LEDGE ENCOUNTERED
MOTTLING 0 73'1
NO GROUNDWA'T'ER ENCOUNTERED
ROOTS EXTENDING TO 42
r
PERCOLATION TEST NO. 1: 09/18/87 5.0 MIN/INCH 0 20'°
,
LOT 2
,1 TEST DATE 09/10/87
ti
TH #2 D"q to 9 'TOPSOIL
9"° to 28" YELLOW/BROWN FINE SANDY LOAM
2811 to 71." GRAY LOAMY FINE SAND
71." to 1.20" GRAY FIRM SANDY TILL (LOW CHROMA)
a NO LEDGE ENCOUNTERED
NO MOTTLING ENCOUNTERED
NO GROUNDWATER ENCOUNTERED
ROOTS EXTENDING TO 26'"
I
PERCOLATION TEST 110. 2. 07/30/87:.2.5 MIN/.INCH 22 "v
LOT
TEST DATE 09/10/87
TH 43 0"" to I TOPSOIL �.
7"" to 27" YELLOW/BLOWN FINE SANDS 0AM
271' to 37" (BRAY LOAMY EINE SAND
371" to 93" GRAY VERY FIRM SANDY TILL (LOW mCHkOMK)
LEDGE @ 93
NO MOT'T'LING ENCOUNTERED
NO GROUNDWATER ENCOUNTERED
ROOTS EXTENDING TO 19
PERCOLATION�. TEST N 3. 07/29/87; 2.5 MIN/INCH 22a COPYRIGHT
r DICESARE - BE
r . ... ENGINEERS, It