Loading...
HomeMy WebLinkAbout8.16TEST HOLE DATA: RECORDED BY ROBERT RUSSO1OF CIA ENGINEERSt INC. ON 1 1/30/21MA TEST HOLE 100 0-8" TOPSOIL BROWN FINE SANDY LOAM. SUBSOIL YELLOW BROWN FINE (SILTY) SANDY LOAM W/GRAY MOTTLES 46* -88" GRAY SANDY TILL NO WATER MOTTLING 0 27" NO LEDGE HOLE I QJ 0-11" TOPSOIL DARK BROWN FINE SANDY LOAM 11"-30" SUBSOIL YELLOW BROWN SANDY LOAM 30"-92" GRAY STONY SANDY TILL NO WATER NO MOTTLING NO LEDGE I ES I HQU I Q2 0-9" TOPSOIL DARK BROWN FINE SANDY LOAM 9"-34" SUBSOIL YELLOW BROWN SANDY LOAM 34"-87" GRAY SANDY TILL NO WATER MOTTLING 0 27" NO LEDGE 0-9" TOPSOIL DARK -BROWN FINE SANDY LOAM 9"-48" SUBSOIL YELLOW BROWN FINE SANDY LOAM (SILTY) 48"-93" GRAY SANDY TILL NO WATER MOTTLING 0 37" NO LEDGE = H= 1 0-19" TOPSOIL DARK BROWN FINE SANDY LOAM 19"-45" SUBSOIL YELLOWISH BROWN STRONG SANDY LOAM 45* -89" GRAY TILL LOAMY SANDY WITH STONES NO WATER NO MOTTLING NO LEDGE 0-18" TOPSOIL DARK BROWN �FINE SANDY LOAM 18* -48" SUBSOIL YELLOWISH BROWN STRONG SANDY LOAM 48--84- GRAY TILL, GRAVELLY LOAMY SAND WITH STONES NO WATER NO MOTTLING LEDGE 0 84* IM-MILM 0-10* TOPSOIL DARK BROWN FINE SANDY LOAM 10"-38" SUBSOIL YELLOW BROWN SANDY LOAM 38* -51" GRAY SANDY TILL 51"-96" , GRAY SANDY TILL DENSE NO WATER NO MOTTLING NO LEDGE 0-10" TOPSOIL DARK BROWN FINE SANDY LOAM 10"-41" SUBSOIL YELLOW BROWN SANDY LOAM 417-91" GRAY SANDY TILL NO WATER NO MOTTLING NO LEDGE 08 0-8" TOPSOIL DARK BROWN FINE SANDY LOAM 8"-32" SUBSOIL YELLOWISH BROWN STOW SANDY LOAM 32"-87" GRAY TILL LOAMY SAND WITH STONES NO WATER NO MOTTLING NO LEDGE ME HQLE-10 0-12" TOPSOIL 'DARK BROWN FINE SANDY LOAM 12"-34" SUBSOIL YELLOWISH BROWN STOW SANDY LOAM 34"-89" GRAY TILL STOW LOAMY SAND WITH SILT NO WATER NO MOTTLING NO LEDGE TEST HOLE UM 0-10" TOPSOIL DARK BROWN FINE SANDY LOAM 10"-46" SUBSOIL YELLOWISH BROWN VERY STONY SANDY LOAM 46"-85" GRAY TILL STONY LOAMY SAND NO WATER NO MOTTLING NO LEDGE = H= ill 0-5" TOPSOIL DARK BROWN FINE SANDY LOAM 1 5"-32" SUBSOIL YELLOWISH BROWN STOW FINE SANDY LOAM 32"-53" SUBSOIL BROWN AND YELLOWISH BROWN STONY FINE SANDY LOAM WITH MOTTLES 53"-90" GRAY TILL LOAMY SAND WITH STONES NO WATER MOTTLING 0 32" NO LEDGE Tm HOLL= 0-90 TOPSOIL DARK BROWN FINE SANDY LOAM 9"-40" SUBSOIL YELLOW BROWN SANDY LOAM 40"-84" DENSE GRAY SANDY TILL, NO WATER NO MOTTLING NO LEDGE TEST' Lui 0-80 TOPSOIL DARK BROWN FINE SANDY LOAM 8"-31 SUBSOIL YELLOW BROWN SANDY LOAM 31"-81" GRAY SANDY TILL DENSE BROWN MOTTLES 0 31" NO WATER MOTTLING 0 31" NO LEDGE 0-11" _TOPSOIL DARK BROWN FINE SANDY LOAM 11"_43" SUBSOIL YELLOW BROWN SANDY LOAM w/mmus 43"-88" GRAY SANDY TILL WATER 0 87" MO NG 0 27" NO LEDGE 0-10" TOPSOIL DARK BROWN FINE SANDY LOAM I _10"-47" SUBSOIL YELLOW BROWN SANDY LOAM 47"-82" DENSE GRAY SANDY TILL BROWN MOTTLES 0 47" NO WATER MOTTLING 0 47" NO LEDGE SEPTIC SYSTEM DESIGN: UZI I - so= mam mm 4 BEDROOM HOUSE PERCOLATION RATE: 16.0 MIN./INCH (PERC. TEST #1) EFFECTIVE LEACHING AREA REQUIRED=900 SF DEPTH TO RESTRICTIVE LAYER=27" SLOPE= 6.1-8% H.F=28 F.F=2.0 P.F.=1.5 MLSS REQUIRED=84 LF USE 12" DEEP x 48" WIDE LEACHING GALLERY EFFECTIVE LEACHING AREA OF TRENCH=5.9 SF/LF LENGTH OF TRENCH REQUIRED=(900 SF)/(5.9 SF/LF)=152.5 LF USE TWO ROWS OF 11 SECTIONS 0 15' O.C. MLSS PROVIDED -11 SECTIONS x 8 LF/SECTION=88 LF LEACHING AREA PROMDED=1038.4 SF LOT 2 - SUM MMU DM 4 BEDROOM HOUSE PERCOLATION RATE: 16.0 MIN./INCH (PERC. TEST #3) EFFECTIVE LEACHING AREA REQUIRED=900 SF DEPTH TO RESTRICTIVE LAYER=32* SLOPE= >15% H.F=18 F.F=2.0 P.F,=1.5 MLSS REQUIRED=54 LF USE 12' DEEP x 48" WIDE LEACHING TRENCH EFFECTIVE LEACHING AREA OF UNIT=3.0 SF/LF LENGTH, OF TRENCH REQUIRED=(900 SF)/(3.0 SF/LF)=300 LF USE 3 ROWS OF 100 LF 0 9' O.C. LEACHING AREA PROVIDED=900 SF 4 BEDROOM HOUSE PERCOLATION RATE: 10 MIN./INCH (PERC TEST #4) EFFECTIVE LEACHING AREA REQUIRED=660 SIF DEPTH TO RESTRICTIVE LAYER=27" SLOPE = 10.1-15% H.F=24 F.F=2.0 P.F,--=1.2 MLSS REQUIRED=58 LF USE A 12* DEEP x 48* WIDE TRENCH EFFECTIVE LEACHING AREA OF TRENCH=3.0 SF/LF LENGTH OF TRENCH REQUIRED=(660 SF)/(3.0 SF/LF)=:220 LF USE TWO ROWS OF 110' AT 9' O.C. LEACHING AREA PROVIDED=660 SF LOT :i ®- sayncMaM DESIGN 4 BEDROOM, HOUSE PERCOLATION RATE: 6.0 MIN./INCH (PERC. TEST #5) EFFECTIVE LEACHING AREA REQUIRED=660 SF DEPTH TO RESTRICTIVE LAYER=27" SLOPE = 8.1-10.0% H.F=26 F.F=2.0 P.F.==1.2 MLSS REQUIRED=62.4 LF USE HIGH CAPACITY INFILTRATOR EFFECTIVE LEACHING AREA OF UNIT=3.9 SF/LF LENGTH OF TRENCH REQUIRED=(660 SF)/(3.9 SF/LF)=169.2 LF USE TWO ROWS OF 14 SECTIONS 0 9' O.C. MLSS PROVIDED=14 SECTIONS x 6.25 LF/SECTION=87.5 LF LEACHING AREA, PROVIDED=682.5 SF LOT 2 -:i -Mm DESIG 4 BEDROOM HOUSE PERCOLATiON RATE: 8.0 MIN./INCH (PERC. TEST #6) EFFECTIVE LEACHING AREA REQUIRED 660 SF NO RESTRICTIVE LAYER SLOPE= 10.1-15% NO MLSS REQUIRED USE A 12m DEEP x 48" WIDE TRENCH EFFECTIVE LEACHING AREA OF TRENCH=3.0 SF/LF LENGTH OF TRENCH REQUIRED=(660 SF)/(3.0 SF/LF)=:220 LF USE TWO ROWS OF 110' AT 9' O.C. LEACHING AREA PROVIDED=660 SF Lm a SYSTEM J2FMGN 4 BEDROOM HOUSE PERCOLATION RATE: 5.33 MIN./INCH (PERC. TEST #7) EFFECTIVE LEACHING AREA REQUIRED=660 SF DEPTH TO RESTRICTIVE LAYER=23" SLOPE= 10.1-15% H.F=26 F.F=2.0 P.F.==1.2 MLSS REQUIRED=62.4 LF USE A 12' DEEP x 48" WIDE TRENCH EFFECTIVE LEACHING AREA OF TRENCH=3.0 SF/LF LENGTH OF TRENCH REQUIRED=(660 SF)/(3.0 SF/L-F)=220 LF USE TWO ROWS OF 110' AT 9' O.C. LEACHING AREA PROVIDED=660 SF LOT 7 - SEPTIC SYSTEM DOM 4 BEDROOM HOUSE PERCOLATION RATE: 12.0 MIN./INCH (PERC TEST #8) EFFECTIVE LEACHING AREA REQUIRED 900 SF DEPTH TO RESTRICTIVE LAYER=23' SLOPE= >15% H.F=24 F.F=2.0 P.F.==1.5 MLSS REQUIRED=72 LF USE 12" DEEP x 48" WIDE LEACHING GALLERY EFFECTIVE LEACHING AREA OF TRENCH=5.9 SF/LF LENGTH OF TRENCH REQUIRED=(900 SF)/(5.9 SF/LF)=:152.5 LF USE 'WO ROWS OF 10 SECTIONS 0 15' O.C. MLSS OROVIDED=10 SECTIONS x 8 LF/SECTION=80 LF LEACHiAG AREA PROVIDED=944 SF LOT a - SEync _2MW DES 4 BEDROOM HOUSE PERCOLATION RATE: 6.0 MIN./INCH (PERC. TEST #9) EFFECTIVE LEACHING AREA REQUIRED=660 SF=6 DEPTH TO RESTRICTM--- LAYER=25" SLOPE= >15% H.F=24 F.F=2.0 P.F.==1.2 MLSS REQUIRED=57.6 LF USE HIGH CAPACITY INFILTRATOR EFFECTIVE LEACHING AREA OF UNIT=3.9 SF/LF LENGTH OF TRENCH REQUIRED=(660 SF)/(3.9 SF/LF)=169,2 LF USE TWO ROWS OF 14 SECTIONS 0 9' O.C. MLSS PROVIDED=14 SECTIONS x 6.25 LF/SECTION=87.5 LF LEACHING AREA PROVIDED=682.5 SF 7 1 54-:1-Prk- 4 BEDROOM HOUSE PERCOLATION RATE: 12.0 MIN./INCH (PERC. TEST #10) EFFECTIVE LEACHING AREA REQUIRED=900 SF DEPTH TO RESTRICTIVE LAYER=23" SLOPE= 10.1-15% H.F=26 0 P.F.=1.5 MLSS REQUIRED=78 LF USE 12* DEEP x 48* WIDE LEACHING GALIFRY EFFECTIVE LEACHING AREA OF TRENCH=5.9 SF/LF LENGTH OF TRENCH REQUIRED=(900 SF)/(5.9 SF/LF)=152.5 LF USE TWO ROWS OF 10 SECTIONS MLSS PROVIDED=10 8EC11ONS x 8 LF/SECTION=80 LF LEACHING AREA PROVIDED=944 SF 1/19/06 SEPTIC SYSTEM DESIGNS REVISED 1/18/06 FINAL ADDITIONS & REVISIONS LA Engineers, Inc. 4 1/11/06 70WN ENGINEERS COMMENTS CIVIL STRUCTURAL - SURVEYING 11/1/05 --OWN ENGINEERS COMMENTS 10/24/0-17TOWN COMMENTS/REVISED RD INTERSECTION 8/23/0�5 _INCAS HEALTH DISTRICT COMMENTS Main Street Norwich, Connecticut -No, Date Revision (860) 886-1966 Fax (860) 886-9165 ► �wlM�►�, roje13541 bubdivision Plan 1-awn's View PCIA Prof. Engineer 0 St Prepared For co J.F.M. Stonehenge Pillars, LLC Date: 6/21/05 Lynch MR Road 40 0• No 2432S hN Montville, Connecticut _ Seto. rc ZZ m ,0 E N 9 NA1. Test Hole & Percolation Data PERCOLATION DATA: EIRC, TEST 1 PERC. 47 FERC. M)T #12 RECORDED BY RECORDED BY RECORDED BY HOLE I IS I= HOLE I CLA ENGINEERS ON 6/17/05 CLA ENGINEERS ON 6/16/05 ('.ILA ENGINEERS ON 6/17/05 0-7" TOPSOIL 0-3" TOPSOIL DARK BROWN FINE SANDY LOAM 0-90 TOPSOIL BROWN FINE SANDY LOAM HOLE DEPTH 24* HOLE DEPTH -24" HOLE: DEPTH 24" 7* -31" SUBSOIL YELLOW BROWN SANDY LOAM 3"-54" SUBSOIL STRONG BROWN STOW SANDY LOAM 9"-28" SUBSOIL YELLOWISH BROWN STONY SANDY LOAM 31"-41" FINE SAND BROWN WITH MOTTLING 28*�-91" GRAY DENSE STONY LOAMY SAND TME EEA DM IME ff.AQWI LAE READING 41"-86" GRAY SANDY TILL NO WATER 8:57 10.5" 2:22 11" 10:58 2" NO MOTTLING NO WATER 8:57 - 9:01 12" 2.22 2:26 13.5"' 10:58 ­ 11:01 5's NO WATER LEDGE 0 54" MOTTLING 0 22" 9:01 - 9:05 13.25" 2:26 2:30 15" 11:01 - 11:04 7" MOTTLING 0 39" NO LEDGE 9:05 - 9:09 14.5" 2:30 2:34 16.50' 11:04 ­ 11:07 8" NO LEDGE 9:09 - 9:13 15'* 2:34 2:38 17.5 11:07 - 11:10 9.25 OTOPSOIL VERY DARK BROWN FINE SANDY LOAM -Y = HOLE 1 9:13 - 9:17 15.5" 2:38 2:42 19" 11:10 ­ 11:13 10" iml 8= z 3"-40" SUBSOIL YELLOW BROWN SANDY LOAM W/MIOTTLES 0-11" TOPSOIL BROWN FINE SANDY LOAM 9:17 - 9:21 16" 2:42 2:46 20" 11:13 3 ­ 11:16 10.75m 0-5" TOPSOIL DARK BROWN FINE SANDY LOAM 40"-69" GRAY SANDY TILL 11 "-30" SUBSOIL YELLOW BROWN STOW SANDY LOAM 9:21 - 9:25 17" 2:46 2:50 20.5" 11:16 --- 11:19 11.5" 5"-30" SUBSOIL YELLOW BROWN SANDY LOAM W/MOTTLES 30"-96" GRAY DENSE LOAMY SAND WITH SILT 9:25 - 9:29 17.75" 2:50 2:54 DRY 11:19 11:22 12" 30"-98* GRAY SANDY TILL NO WATER 9:29 - 9:33 18" RESOAKE�D 11:22 11:25 12.75" MOTTLING 0 26* NO WATER9:33 - 9:37 18.25" 2:54 110" 11:25 11:28 DRY NO WATER NO LEDGE MOTTLING 0 30" 9:37 9:41 18.5" 2:54 - 2:58 12" 11:28 RESOAKED 2* MOTTLING 0 28 NO LEDGE 9:41 9:45 19.25* - 2:58 - 3.02 1- ^r�" 3.25 11:28 11:31 4.25" NO LEDGE OLE '34 9:45 9:49 19.5" 3:02 - 3:06 14.25" 11:31 11:34 6" 0-4" TOPSOIL DARK BROWN FINE SANDY LOAM HOLE 9:49 9:53 19.75" 3:06 - 3:10 15" 11.34 11:37 7" 4"-41 SUBSOIL YELLOW BROWN SANDY LOAM W/MOTTLES 0-80 TOPSOIL BROWN FINE SANDY LOAM 3:10 - 3-14 15.75" 11:37 11:40 8.5* 0-8" TOPSOIL DARK BROWN FINE SANDY LOAM 41"-72" GRAY SANDY TILL 8"-31" SUBSOIL STRONG BROWN FINE SANDY LOAM PERC. RATE = 16.0 MINUTES/INCH 3::14 - 3:18 16.75" 11:40 11:43 9.5" 8"-39" SUBSOIL YELLOW BROWN SANDY LOAM W/MOTTLES 31"-86" GRAY DENSE SANDY, STONY TILL 3: 18 - 3:22 -7 1).75" 11:43 11:46 10" 39"-85" GRAY SANDY TILL NO WATER 3:22 - 3:26 18.75" 11-46 11:49 10.5" MOTTLING 0 28" NO WATER PERC. TEST 23:26 - 3:30 19.75 11-49 11.52 11'" NO WATER NO LEDGE MOTTLING 0 23" RECORDED BY 11.52 11:55 11.5* MOTTLING 0 27" NO LEDGE CLA ENGINEERS ON 6/17/05 PERC. RATE = 5.33 MINUTES/INCH 11:55 11:58 12.25" NO LEDGE MT H= 135 HOLE DEPTH 24" 11:58 12:01 DRY 0-4* TOPSOIL BROWN FINE SANDY LOAM HOLE 15 TEST R= 112 4"-25" SUBSOIL STRONG BROWN STOW SANDY LOAM 0-10" TOPSOIL BROWN FINE SANDY LOAM INE READING PERC. PERC. RATE = 6.0 MINUTES/INCH 0-9" TOPSOIL 25"-76" GRAY SANDY TILL BOULDERS 10"-28" SUBSOIL YELLOWISH BROWN SANDY LOAM 8:55 9.5" RECORDED BY 9"-35" SUBSOIL STRONG BROWN SANDY LOAM 28"-94" GRAY VERY STOW LOAMY SAND WITH SILT 8:55 8:59 11" CLA ENGINEERS ON 6/16/05 35"-44" BROWN SAND WITH MOTTLES NO WATER 8:59 9:03 12" HOLE DEPTH 22" PERC, TEST 3 44"-93" GRAY SANDY TILL MOTTLING 0 25" NO LEDGE NO WATER 9:03 9:07 13" RECORDED BY MOTTLING 0 26" 9:07 9:11 13.5" RML READIN CIA ENGINEERS ON 6/17/05 NO 'WATER TM 136 NO LEDGE 9:11 9:15 14" 2:35 9" HOLE DEPTH' 24" MOTTLING 0 37* ,HOLE 9:15 9:19 14.5" 2:35 - 2:38 11" NO LEDGE 0-4" TOPSOIL VERY DARK BROWN FINE SANDY LOAM HOLE 15 9:19 9:23 15" 2:38 - 2:41 12* TIME LREADIN 4"-26" SUBSOIL STRONG BROWN SANDY LOAM 9:23 9:27 15.5* 2:41 - 2:44 13" 10:02 11" TEST HOLE 120 26"-92" GRAY SANDY TILL STRONG 0-8" TOPSOIL BROWN FINE SANDY LOAM 9:27 9:31 15.75" 2:44 - 2:47 13.75" 10:02 - 10:06 14.25* 0-7* TOPSOIL DARK BROWN FINE SANDY LOAM 8"-24" SUBSOIL YELLOWISH BROWN STONY SANDY LOAM 9:31 9:35 16" 2:47 - 2:50 14" 10:06 - 10:10 15.5" 7"-32" SUBSOIL YELLOW BROWN STONY SANDY LOAM NO WATER 24"-94" COMPACT GRAY LOAMY SAND WITH SILT POCKS 9:35 9:39 16.25" 2:50 - 2:53 14.51' 10:10 - 10:14 17" 32"-89" GRAY SANDY TILL MOTTLING 0 26* NO LEDGE NO WATER 9:39 9:43 16.75" 2:53 - 2:56 14.75" 10:14 - 10:18 18.25" NO MOTTLING 9:43 9:47 17" 2:56 - 2:59 15" 10:18 10:22 19" NO WATER NO LEDGE 9:47 9:51 17.25" 2:59 - 3:02 15.25" 10:22 10:26 19.5" NO MOTTLING HOLE 17 9:51 9:55 17.5" 3:02 - 105 16" 10:26 10:30 20.25" NO LEDGE 0-3" TOPSOIL VERY DARK BROWN FINE SANDY LOAM TM HOLE 153 3:05 - 3:08 16.25" 10:30 10:34 20.75" 3"-27" SUBSOIL STRONG BROWN SANDY LOAM 0-10" TOPSOIL BROWN SANDY LOAM; PERC. RATE = 16.0 MINUTES/INCH 3:08 - 3:111 16.5" 10:34 ­ 10:38 21.5" 3M HOLE 121 27"-82" GRAY SANDY TILL STONY 10"-37" YELLOWISH BROWN SANDY LOAM 3:11 - 3:14 16.75" 10:38 - 10:42 22" 0-6" TOPSOIL DARK BROWN FINE SANDY LOAM 37"-98" GRAY LOAMY SAND WITH SILT 3:14 - 3:17 17" 10.42 - 10:46 22.5* 6"-22" SUBSOIL YELLOW BROWN STOW SANDY LOAM NO WATER Pmc, TEST j3 3:17 - 3:20 17.25" 10:46 - 10:50 DRY 22"-77'0 GRAY STOMP SAND AND GRAVEL MOTTLING 0 27 NO LEDGE NO WATER NO MOTTLING RECORDED BY CLA ENGINEERS ON 6/16/05 3:20 - .3:23 3.23 - 3:26 17.75" DRY PERC. RATE = 8.0 MINUTES/INCH NO WATER NO [EDGE HOLE DEPTH 21" NO MOTTLING 1 H=138 m PERC. RATE = 12.0 MINUTES/INCH 4 A NO LEDGE o_3" TOPSOIL VERY DARK BROWN FINE SANDY LOAM ME H INE READIN z Em, Tm 3* -26" SUBSOIL STRONG BROWN SANDY LOAM 0-12" TOPSOIL BROWN FINE SANDY LOAM 4:03 go RECORDED BY IM HQLE 1 26"-78" GRAY SANDY TILL 12"-27" SUBSOIL YELLOWISH BROWN STONY SANDY LOAM 4:03 - 4:08 10" PWU CLA ENGINEERS ON 6/17/05 0-3" TOPSOIL 'VERY DARK BROWN FINE SAND",( LOAM 27"-90" GRAY LOAMY SAND W/ SILT AND STONES 4:08 - 4:13 10.5" RECORDED BY HOLE DEPTH 23" 3"-46" SUBSOIL YELLOW BROWN STONY SANDY LOAM NO WATER 4:13 4:18 11" CIA ENGINEERS ON 6/16/05 46"-77'* GRAY STONY SAND AND GRAVEL MOTTLING 0 26* NO WATER 4:18 4:23 11.5" HOLE DEPTH 24" 11ME REALIN!C, NO LEDGE NO MOTTLING 4-23 4:28 12" 10:00 3.75" NO WATER NO LEDGE 4:28 4:33 12.5" BME RL6Q1LQ 10:00 - 10:04 6" NO MOTTLING HOLE 139 4:33 4-38 13" 10-22 12" 10.04 - 10:08 7.5" NO LEDGE 0-4" TOPSOIL VERY DARK BROWN FINE SANDY LOAM H= 155 4:38 4:43 13.25" 10:22 - 10:25 13.5" 10:08 10:12 8.7500 4* -24" SUBSOIL STRONG BROWN SANDY LOAM 0-11" TOPSOIL BROWN FINE SANDY LOAM 4:43 4:48 13.5" 10:25 - 10:28. 15.25" 10:12 10:16 9.5" ZE[_HQLE 12A 24"-88" GRAY SANDY TILL 11"-37" SUBSOIL YELLOWISH BROWN STONY SANDY LOAM 4:48 4:53 13.75" 10:28 - 10:31 16.5' 10:16 10:20 10.25" 0-4" TOPSOIL VERY DARK BROWN FINE SANDY LOAM 37"-90" GRAY STONY LOAMY SAND W/SILT 4:53 4:58 14" 10:31 - 10-34 17.5" 10:20 10:24 10.75" 4"-22" STRONG BROWN SANDY LOAM NO WATER 4:58 5:03 14-25" 10:34 - 10,37 18.5" 10:24 10:28 11.5" 22"--96" GRAY SANDY TILL MOTTLING 0 23" NO WATER 10:37 - 10: 40 19-25" 10:28 10:32 12" NO LEDGE NO MOTTLING PERC. RATE 16.0 MINUTES/INCH 10:40 - 10:41'3 20" 10-32 10:36 12.75" NO WATER NO LEDGE 10:43 10:46 20.75" 10:36 10:40 13.5" NO MOTTLING HOLE 140 10:46 10:49 21,5' 10:40 10:44 DRY NO LEDGE 0-6* TOPSOIL DARK BROWN FINE SANDY LOAN RkECORDED BY UN HEALTH DISTRIC7 JPERC. MT 14 10:49 10:52 22" PERC. RATE 5.33 MINUTES/INCH TM HOLE 12 J 6* -26" SUBSOIL YELLOW BROWN STONY SANDY LOAM C'M 1/11/2006 RECORDED BY 10:52 10:.55 10:55 10:58 22.5ft DRY 26"-106" GRAY SANDY TILL CLA ENGINEERS ON 6/16/05 0-6" TOPSOIL DARK BROWN FINE SANDY LOAM HOLE DEPTH 22" 6"-39" SUBSOIL STONY YELLOW BRC"N SANDY LOAM NO WATER TEST HOLE 200 PERC. RATE = 6.0 MINUTES/INCH 39"-80" GRAY SANDY -QLL MOTTLING 0 26" 0-9" TOPSOIL INE READING NO LEDGE 9"-25" BROWN SANDY LOAM 4:00 10.5" NO WATER MOTTLING 0 31* 25"-78" GRAY SANDY TILL 4:00 - 4:05 14" d10 HOLE 14 4-05 - 4:10 15" RECORDED BY NO LEDGE 0-6" TOPSOIL DARK BROWN FINE SANDY LOAM NO WATER 410 - 4:15 160 CLA ENGINEERS ON 6/16/05 lHgLL_J= 6"-33" SUBSOIL STRONG BROWN SANDY LOAM NO MOTTLING 4:15 - 4:20 17" HOLE DEPTH 22" = 33* -102" GRAY SANDY TILL NO LEDGE 4:20 - 4:25 180 0-6" TOPSOIL DARK BROWN FINE SANDY LOAM 4:45 - 4:30 18.5', 11ml-READ -W 6"-36* SUBSOIL YELLOW BROWN STONY SANDY LOAM NO WATER TMT HOLE 20 4:30 - 4:35 19" 11:21 9.5" 36"-71" GRAY SANDY TILL DENSE MOTTLING 0 33" 0-9" TOPSOIL 4:35 - 4:40 20" 11:21 - 11:24. 10.5" NO LEDGE 9"-29" BROWN SANDY LOAM 4:40 - 4:45 21" 11:24 - 11:2'7' 11" NO WATER 29* -93* GRAY SANDY TILL 4:45 - 4:50 DRY 11:27 - 11:30 11.5" MOTTLING ®23" H=142 11:30 - 11:33 12" NO LEDGE 0-5" TOPSOIL VERY, DARK BROWN FINE SANDY LOAM NO WATER PERC. RATE = 10 MINUTES/INCH 11:33 - 11:36 12.5" 5"-29" SUBSOIL STRONG BROWN SANDY LOAM MOTTLING 0 29" 11:36 - 11:31' 13" HOLE 12 29"-92" GRAY SANDY TIH NO LEDGE 11:39 - 11:42' 13.25" 0-2;" TOPSOIL VERY DARK BROWN FINE SANDY 'LOAM 11:42 - 11:45 13.5" 3"-43" SUBSOIL STRONG BROWN SANDY LOAM NO WATER TM ROLE 202 RECORDED BY - 11:45 - 11: 48 13.75" 43"--80" GRAY SANDY TILL DENSE NO MOTTLING 0 33" 0-7" TOPSOILCLA ENGINEERS ON 6/16/05 11:48 - 11:51 14-0 NO LEDGE 7"-20" BROWN SANDY LOAM HOLE DEPTH 22" 11:51 - 11:54 14,5 NO WATER 20"-81" GRAY SANDY TILL 11:54 - 11:5'7' 14.75" NO MOTTLING 0 38" HOLE 1 IME REA DIN" 11:57 - 12-00 15" NO LEDGE 0-4m TOPSOIL DARK BROWN FINE SANDY LOAM NO WATER 2:26 10 12:00 - 12:03 15.25" MT HOLE 12Z 4"-22" SUBSOIL STRONG BROWN STONY SANDY LOAM NO MOTTLING 2:26 - 2:29 11.5" 12:03 - 12:06 15.75" 22"-90* GRAY SANDY TILL2:29 NO LEDGE - 2:32 12" 12-06 - 12:09 16" 0-8" TOPSOIL DARK BROWN FINE SANDY LOAM 2:32 2:35 12.5" 12:09 - 12:121. 16.25" 8"-,35* SUBSOIL YELLOW BROWN SANDY LOAM NO WATER HOLE 203 2:35 2:38 13.5" 35"-82" GRAY SANDY TIH WITH MOTTLES NO MOTTLING 0-6" TOPSOIL 2:38 2:41 14" PERC. RATE = 12.0 MINUTES/INCH NO LEDGE 6"-2,3" BROWN SANDY LOAM 2:41 2:44 14.5" NO WATER MOTTLING 0 35* 23"-86" GRAY SANDY TILL 2:44 2:47 15" NO LEDGE 0-10" TOPSOIL DARK BROWN FINE SANDY LOAM NO WATER 2:47 2:50 2:50 2-53 16" 16.75" POC, ill RECORDED BY TEST HOLLJa 10"-21" SUBSOIL STRONG BROWN FINE SANDY LOAM NO MOTTLING LEDGE 2,-53 5:56 17.25" CLA ENGINEERS ON 6/16/05 0-3, TOPSOIL VERY DARK BROWN FINE SANDY LOAM 21"-93" DENSE GRAY SILTY TILLNO 2:56 2:59 17.75" HOLE DEPTH 23" 3"-24" SUBSOIL STONY YELLOW BROWN SANDY LOAM NO WATER HOLE 2" 2:59 - 3:02 18.25" TME READINQ 24"--60" GRAY SANDY TILL MOTTLING 0 21 0-7" TOPSOIL 3:02 - 3:05 18.75" 11:12 9.75" NO LEDGE 7"-27" BROWN SANDY LOAM 3:05 - 3:08 19.25" 11:12 - 11:15 10.5" NO WATER 27"-88" GRAY MED. COMPCAT SANDY TILL 3:08 - 3:12 19.5" 11:15 - 11:18 11" MOTTLING 0 24" HOLE 145 3:12 - 3:15 20" LEDGE 0 60" 0-10" TOPSOIL DARK BROWN FINE SANDY LOAM WATER 0 74" 3:15 - 3:18 20.5" 11:18 - 11:21 11:21 11:24 11.5" 10"-24" SUBSOIL STRONG BROWN FINE SANDY LOAM MOTTLING 0 27" 3:21 DRY -- 11:24 - 11:27 12" 12.25" TIHOLE 129 M 24"-87" GRAY BROWN DENSE SILTY SANDY TILL NO LEDGE P ERC. RATE 6 MINUTES/INCH 11:27 - 11:30 12.5" 0-4' TOPSOIL DARK BROWN VERY FINE SANDY LOAM 4"-31" SUBSOIL YELLOW BROWN STONY SANDY 'LOAM WATER 0 85* TajHOLE 205 11:30 - 11:33 11:33 - 11:36 130 13.5" 31"--90" GRAY SAND AND GRAVEL STRONG WITH MOTTLES MOTTLING 0 24" IRMM # C, T6 11:36 - 11:39 13.75" NO LEDGE 0-9* TOPSOIL NO WATER 9"-30" BROWN SANDY LOAM RECORDED BY 11:39 - 11:42 14" MOTTLING 0 31" H= 144 30"-85" GRAY MED. COMPACT SANDY TILL CIA ENGINEERS ON 6/16/05 11:42 - 11:4:1 14.25" NO LEDGE 0-13" TOPSOIL DARK BROWNFINE SANDY LOAM HOLE DEPTH 23" 11:45 - 11:48 14.5" 13"-20" SUBSOIL STRONG BROWN. FINE SANDY LOAM WATER 0 75* 11:48 - 11:51 14.75 1 20'* -87" GRAY BROWN DENSE SILTY SANDY TILL MOTTLING 30" TME READIN 11:51 - 11:54 11:54 11:57 15" 0-6" TOPSOIL DARK BROWN FINE SANDY LOAM NO LEDGE 2:20 12" - 15.5" 6"-23" SUBSOIL STONY YELLOW BROWN SANDY LOAM NO WATER 2:20 - 2:24 13.75" 11:57 - 12:00 15.75" 23"--88" GRAY SANDY TILL STONY MOTTLING 0 20" 2:24 - 2:28 14.75" 12:00 - 12:03 16" NO LEDGE 2:28 - 2:32 16" NO WATER 2:32 - 2.36 17" PERC. RATE = 12.0 MINUTES/INCH MOTTLING 0 23" TM HU 147 2:40 - 2:44 17.75" NO LEDGE 0-10" TOPSOIL DARK BROWN FINE SANDY LOAM 2:44 - 2:48 19" IN 10"-36" SUBSOIL STRONG BROWN FINE SANDY LOAM 2:48 - 2:52 19.50 TEST HOLE I hLI 36"-77" COMPACT GRAY TILL FINE SANDY LOAM 2:52 - 2:56 20" 0-4" TOPSOIL VERY DARK BROWN FINE SANDY LOAM 2-56 - 3:00 20.5" 4"-32" SUBSOIL STONY STRONG BROWN SANDY LOAM NO WATER 3:00 - 3:04 21" 32"-87* GRAY SANDY TILL STONY MOTTLING 0 22* 3:08 DRY NO LEDGE NO WATER !PERC. RATE = 8.0 MINUTES/INCH MOTTLING 0 32" NO LEDGE SEPTIC SYSTEM DESIGN: UZI I - so= mam mm 4 BEDROOM HOUSE PERCOLATION RATE: 16.0 MIN./INCH (PERC. TEST #1) EFFECTIVE LEACHING AREA REQUIRED=900 SF DEPTH TO RESTRICTIVE LAYER=27" SLOPE= 6.1-8% H.F=28 F.F=2.0 P.F.=1.5 MLSS REQUIRED=84 LF USE 12" DEEP x 48" WIDE LEACHING GALLERY EFFECTIVE LEACHING AREA OF TRENCH=5.9 SF/LF LENGTH OF TRENCH REQUIRED=(900 SF)/(5.9 SF/LF)=152.5 LF USE TWO ROWS OF 11 SECTIONS 0 15' O.C. MLSS PROVIDED -11 SECTIONS x 8 LF/SECTION=88 LF LEACHING AREA PROMDED=1038.4 SF LOT 2 - SUM MMU DM 4 BEDROOM HOUSE PERCOLATION RATE: 16.0 MIN./INCH (PERC. TEST #3) EFFECTIVE LEACHING AREA REQUIRED=900 SF DEPTH TO RESTRICTIVE LAYER=32* SLOPE= >15% H.F=18 F.F=2.0 P.F,=1.5 MLSS REQUIRED=54 LF USE 12' DEEP x 48" WIDE LEACHING TRENCH EFFECTIVE LEACHING AREA OF UNIT=3.0 SF/LF LENGTH, OF TRENCH REQUIRED=(900 SF)/(3.0 SF/LF)=300 LF USE 3 ROWS OF 100 LF 0 9' O.C. LEACHING AREA PROVIDED=900 SF 4 BEDROOM HOUSE PERCOLATION RATE: 10 MIN./INCH (PERC TEST #4) EFFECTIVE LEACHING AREA REQUIRED=660 SIF DEPTH TO RESTRICTIVE LAYER=27" SLOPE = 10.1-15% H.F=24 F.F=2.0 P.F,--=1.2 MLSS REQUIRED=58 LF USE A 12* DEEP x 48* WIDE TRENCH EFFECTIVE LEACHING AREA OF TRENCH=3.0 SF/LF LENGTH OF TRENCH REQUIRED=(660 SF)/(3.0 SF/LF)=:220 LF USE TWO ROWS OF 110' AT 9' O.C. LEACHING AREA PROVIDED=660 SF LOT :i ®- sayncMaM DESIGN 4 BEDROOM, HOUSE PERCOLATION RATE: 6.0 MIN./INCH (PERC. TEST #5) EFFECTIVE LEACHING AREA REQUIRED=660 SF DEPTH TO RESTRICTIVE LAYER=27" SLOPE = 8.1-10.0% H.F=26 F.F=2.0 P.F.==1.2 MLSS REQUIRED=62.4 LF USE HIGH CAPACITY INFILTRATOR EFFECTIVE LEACHING AREA OF UNIT=3.9 SF/LF LENGTH OF TRENCH REQUIRED=(660 SF)/(3.9 SF/LF)=169.2 LF USE TWO ROWS OF 14 SECTIONS 0 9' O.C. MLSS PROVIDED=14 SECTIONS x 6.25 LF/SECTION=87.5 LF LEACHING AREA, PROVIDED=682.5 SF LOT 2 -:i -Mm DESIG 4 BEDROOM HOUSE PERCOLATiON RATE: 8.0 MIN./INCH (PERC. TEST #6) EFFECTIVE LEACHING AREA REQUIRED 660 SF NO RESTRICTIVE LAYER SLOPE= 10.1-15% NO MLSS REQUIRED USE A 12m DEEP x 48" WIDE TRENCH EFFECTIVE LEACHING AREA OF TRENCH=3.0 SF/LF LENGTH OF TRENCH REQUIRED=(660 SF)/(3.0 SF/LF)=:220 LF USE TWO ROWS OF 110' AT 9' O.C. LEACHING AREA PROVIDED=660 SF Lm a SYSTEM J2FMGN 4 BEDROOM HOUSE PERCOLATION RATE: 5.33 MIN./INCH (PERC. TEST #7) EFFECTIVE LEACHING AREA REQUIRED=660 SF DEPTH TO RESTRICTIVE LAYER=23" SLOPE= 10.1-15% H.F=26 F.F=2.0 P.F.==1.2 MLSS REQUIRED=62.4 LF USE A 12' DEEP x 48" WIDE TRENCH EFFECTIVE LEACHING AREA OF TRENCH=3.0 SF/LF LENGTH OF TRENCH REQUIRED=(660 SF)/(3.0 SF/L-F)=220 LF USE TWO ROWS OF 110' AT 9' O.C. LEACHING AREA PROVIDED=660 SF LOT 7 - SEPTIC SYSTEM DOM 4 BEDROOM HOUSE PERCOLATION RATE: 12.0 MIN./INCH (PERC TEST #8) EFFECTIVE LEACHING AREA REQUIRED 900 SF DEPTH TO RESTRICTIVE LAYER=23' SLOPE= >15% H.F=24 F.F=2.0 P.F.==1.5 MLSS REQUIRED=72 LF USE 12" DEEP x 48" WIDE LEACHING GALLERY EFFECTIVE LEACHING AREA OF TRENCH=5.9 SF/LF LENGTH OF TRENCH REQUIRED=(900 SF)/(5.9 SF/LF)=:152.5 LF USE 'WO ROWS OF 10 SECTIONS 0 15' O.C. MLSS OROVIDED=10 SECTIONS x 8 LF/SECTION=80 LF LEACHiAG AREA PROVIDED=944 SF LOT a - SEync _2MW DES 4 BEDROOM HOUSE PERCOLATION RATE: 6.0 MIN./INCH (PERC. TEST #9) EFFECTIVE LEACHING AREA REQUIRED=660 SF=6 DEPTH TO RESTRICTM--- LAYER=25" SLOPE= >15% H.F=24 F.F=2.0 P.F.==1.2 MLSS REQUIRED=57.6 LF USE HIGH CAPACITY INFILTRATOR EFFECTIVE LEACHING AREA OF UNIT=3.9 SF/LF LENGTH OF TRENCH REQUIRED=(660 SF)/(3.9 SF/LF)=169,2 LF USE TWO ROWS OF 14 SECTIONS 0 9' O.C. MLSS PROVIDED=14 SECTIONS x 6.25 LF/SECTION=87.5 LF LEACHING AREA PROVIDED=682.5 SF 7 1 54-:1-Prk- 4 BEDROOM HOUSE PERCOLATION RATE: 12.0 MIN./INCH (PERC. TEST #10) EFFECTIVE LEACHING AREA REQUIRED=900 SF DEPTH TO RESTRICTIVE LAYER=23" SLOPE= 10.1-15% H.F=26 0 P.F.=1.5 MLSS REQUIRED=78 LF USE 12* DEEP x 48* WIDE LEACHING GALIFRY EFFECTIVE LEACHING AREA OF TRENCH=5.9 SF/LF LENGTH OF TRENCH REQUIRED=(900 SF)/(5.9 SF/LF)=152.5 LF USE TWO ROWS OF 10 SECTIONS MLSS PROVIDED=10 8EC11ONS x 8 LF/SECTION=80 LF LEACHING AREA PROVIDED=944 SF 1/19/06 SEPTIC SYSTEM DESIGNS REVISED 1/18/06 FINAL ADDITIONS & REVISIONS LA Engineers, Inc. 4 1/11/06 70WN ENGINEERS COMMENTS CIVIL STRUCTURAL - SURVEYING 11/1/05 --OWN ENGINEERS COMMENTS 10/24/0-17TOWN COMMENTS/REVISED RD INTERSECTION 8/23/0�5 _INCAS HEALTH DISTRICT COMMENTS Main Street Norwich, Connecticut -No, Date Revision (860) 886-1966 Fax (860) 886-9165 ► �wlM�►�, roje13541 bubdivision Plan 1-awn's View PCIA Prof. Engineer 0 St Prepared For co J.F.M. Stonehenge Pillars, LLC Date: 6/21/05 Lynch MR Road 40 0• No 2432S hN Montville, Connecticut _ Seto. rc ZZ m ,0 E N 9 NA1. Test Hole & Percolation Data