HomeMy WebLinkAbout8.10PROVIDE
AKITI TI. ArVIRIC` oen
PROVIDE SLOPE STABILIZATION
(SEE DETAIL)
DEVELOPMENT SCHEDULE
SEQUENCE OF CONSTRUCTION: (PROPOSED ROAD
1. INSTALL PERIMETER EROSION AND SEDIMENT CONTROL STRUCTURES AND ANTI -TRACKING PAD.
"OBTAIN SITE INSPECTION FROM THE TOWN OF MONNILLE"
2. CLEAR, GRUB AND ROUGH GRADE WITHIN LIMITS OF DISTURBANCE.
3. INSTALL TEMPORARY WATER BARS &TEMPORARY SEDIMENT TRAPS.
4. INSTALL PROPOSED DRAINAGE SYSTEM AND ASSOCIATED PIPING. PROVIDE INET SEDIMENT
CONTROL DEVICES.
5. INSTALL SUBGRADE AND PROVIDE UNDERGROUND UTILITIES.
6. INSTALL BINDER COURSE.
7. INSTALL BITUMINOUS CONCRETE LIP CURBING AND WEARING COURSE FOR PROPOSED ROAD.
8. LOAM. SEED &MULCH SIDE SLOPES AND DISTURBED AREAS.
9. CLEAN ALL DRAINAGE STRUCTURES AND OBTAIN FINAL INSPECTION.
10. REMOVE EROSION AND SEDIMENT CONTROL DEVICES.
I 11� ff JA
UTILIZE PROPOSED STORM WATER BASINS AS
SEDIMENT TRAPS DURING CONSTRUCTION
(TYP FOR 3). CLEAN TRAPS FOLLOWING
STABILIZATION AND COMPLETE INSTALLATION.
HAYBALE/SILT FENCE
BARRIER (TYP)
PROVIDE AND MAINTAIN HAYBALE
CHECK DAM THROUGHOUT CONSTRUCTION
(SEE DETAIL)
(SEE DETAIL) j
NOTE: CONTRACTOR TO MAINTAIN ON SITE THE FOLLOWING
MATERIALS TO MEET UNEXPECTED EROSION NEEDS
* 500 LF OF SILT FENCE
* 25 HAYBALES
* WOODCHIPS
�t
v
c
00
PROVIDE SLOPE STABILIZATION J
(SEE DETAIL) z
CAI
z
a
WOODCHIP
-- - - - - - BERM (TYP.) m
\_
� $ its
j -
RA�4e
'
+00
ft
� � o � f�1fl,ll ; If_III_ _Ifl=1t �III.itl= '111=
4
1
PROVIDE STONE CHECK DAM PROVIDE WOODCHIP BERM ALONG
(TYP FOR 2) NORTHERLY AND SOUTHERLY
(SEE DETAIL) LIMITS OF DISTURBANCE
EAST OF STATION 8+00
(SEE DETAIL)
0
PROVIDE STONE CHECK DAM
(SEE DETAIL)
/ a
{860) 686-1966 Fax (860) 886-9165
No. Dat(9 Revision
Project No.
,OfAm"'iff. Resubdivision Plan - Fawn's View CLA-3541
�► li
**woo" Ai Proj. Engineer
A'' �e�� �G Prepared For J.F.M.
Stonehendge Pillars, LLC Date:
Off Lynch HM Road 6/21/05
0. No.24329 �L; t Connecticut
Sheet No.
,�,q�4ia.� Montve, Goi�eCt�ut
'' �� , Fawns Meadow Road - Roadway Construction
i
g 1/ 18/06 FINAL ADDMONS & REVISIONS
I LA
CIVrL .
Engineers,Inc.
STRUCTURAL • SURVEYING
5 1/11/016 TOWN ENGINEERS COMMENTS
4 12/6/015 ROAD REALIGNED PER TOWN COMMENTS
3 1 1 /1 /05 TOWN ENGINEERS COMMENTS
2 14/24/05 TOWN COMMENTS/REVISED RD INTERSECTION
31'7 Main
Street Norwich Connecticut
I 8 '23/05 UNCAS HEAITN DISTRfCT COMMENTS
/ a
{860) 686-1966 Fax (860) 886-9165
No. Dat(9 Revision
Project No.
,OfAm"'iff. Resubdivision Plan - Fawn's View CLA-3541
�► li
**woo" Ai Proj. Engineer
A'' �e�� �G Prepared For J.F.M.
Stonehendge Pillars, LLC Date:
Off Lynch HM Road 6/21/05
0. No.24329 �L; t Connecticut
Sheet No.
,�,q�4ia.� Montve, Goi�eCt�ut
'' �� , Fawns Meadow Road - Roadway Construction
i